Wastewater Benchmarks A Survey Conducted by the MTAS Library for The City of Kingsport Nine Tennessee Cities Contacted March 2004 Cities/ Contacts Total cost per million gallons treated Collection system costs per sewer mile Average annual, residential sewer charge (Includes labor, vehicles, dewater and polymers) Plant O & M costs per million gallons treated Number of staff per 1000 wastewater customers Chemical costs per million gallons treated Total electrical costs per million gallons treated Cleveland Population: 37,192 Fred Murphy, Water Division Manager (423) 478-9380 $1,825 $2,800 $257 $332 $371 2.4 $24 $72 Cookeville Population: 23,923 Ronnie Kelly, Director Department of Water Quality Control (931) 520-5259 $1,217 $2,540 (Does not include depreciation expense. Calculated, using all costs associated with WW system.) (Includes pump station expenses.) $199.20 $113.50 $372 1.6 $31.3 (Includes $153.50 Elizabethton Johann Coetzee, Wastewater Manager, (423) 547-6341 $1,063 Information not available $248 Information not available Information not available 4.4 Information not available $108 Greeneville Population: 15,274 Ken Earl, Superintendent (423) 639-7105 $891.39 $889.47 $126.96 $174 $392.01 1.7 $14.52 $94.07 Jackson Population: 59,543 Truman Murray, Wastewater Manager (731) 422-7210 $615.00 $2,630 $219 $196.92 Miller Ave. WWTP; $73.72 Middle Fork WWTP $525.49 4.4 $4.73 $150 Johnson City Population: 55,652 Gordon Cox, Water/Wastewater Superintendent (423) 975-2631 $495 $2,450 First 1000gallons = $2.60/1000 gallons; Next 9000 gallons = $1.49/1000 $200 $405 2.0 employees/1000 customers $33 $108 (Based on 5,000 gal. average, monthly usage) Sludge costs per dry ton produced (Does not include depreciation expenses. Includes hauling/disposal costs – excluding hauling/disposal expenses costs per dry ton = $99.52.) chemicals fed in the collection system. Does not include polymer or lime costs used in biosolids process.) (Includes treatment plant electrical and pump station electrical costs.) Wastewater Benchmarks A Survey Conducted by the MTAS Library for The City of Kingsport Nine Tennessee Cities Contacted March 2004 Cities/ Contacts Total cost per million gallons treated Collection system costs per sewer mile Kingsport Population: 44,905 Dan Wankel, Environmental Services Engineer (423) 229-9340 $841 $2,672 Murfreesboro Population: 75,083 Joe Kirchner, Wastewater Department Director (615) 890-0862 $756 $1,183,903/yr Oak Ridge Population: 27,387 Bruce Giles, Wastewater Manager (865) 425-1843 $2,723 Average annual, residential sewer charge (Includes labor, vehicles, dewater and polymers) Plant O & M costs per million gallons treated Number of staff per 1000 wastewater customers Chemical costs per million gallons treated Total electrical costs per million gallons treated $330.60 $138 $390 1.9 $15 $71 $18.41 $73 $480 1.9 $9.5 $153 $773 1.9 $36 $176 (Based on 5,000 gal. average, monthly usage) (2003 operational costs for 400 mi. trunk lines/1200 mi. if laterals included) $2,364 Sludge costs per dry ton produced (2,378 dry tons) $261 $236 (2)