ENGINEERING UNIT 166 OLD FORT ROAD DURBAN 4001 DATE: Dear Sir/Madam, FLOODING INFORMATION Property ............................................................... ............................................................... Address ............................................................... ............................................................... With reference to your enquiry at this Department, the following information is given in respect of the above property:_ Under a flood of recurrence period 1 in 50 years, the property is estimated to be _ (a) totally affected by flooding. (b) partially affected by flooding. It is regretted that the exact level and/or position of the flood line on your property cannot be made available, due to variances from time to time in local developments which affect such levels and positions. Before proceeding with future development on the property, professional advice should be sought from a registered professional engineer specialising in hydrological and hydraulic design work. For your guidance, the professional engineer will be required to provide the following information in relation to the development of the property, as given on the annexure attached. Additional information may be requested in respect of any particular development. Yours faithfully, A.M. PETERS HEAD : ENGINEERING INFORMATION TO BE PROVIDED IN RELATION TO THE DEVELOPMENT OF PROPERTIES SITUATED IN THE 1 IN 50 YEAR FLOOD PLAIN The Engineer referred to below must be a Professional Engineer experienced in hydrological and hydraulic matters. A. For All Development 1. The level in metres M.S.L. of the 1 in 50 year and 1 : 100 year flood line on the property. 2. Calculations by the Engineer indicating method of determining the flood line employed. 3. The position of the flood line on the property, whether the proposed development is inside or outside the flood plain and the floor level of the proposed development in metres M.S.L. where appropriate. 4. The information from 3 is to be shown on all plans relating to the development. 5. If all or part of the development including the earthworks is inside the existing 1 in 50 year flood plain, then the Engineer must certify _ a) that the foundations are capable of withstanding any forces or flood effects on the development and be prepared to provide design calculation to that effect if called upon to do so; b) that the development in the flood plain will not affect the flooding or flood levels on adjacent properties, upstream, downstream and opposite as the case may be, and such certification to be backed up by calculations. B. For All Residential Developments _ New or Extensions The information as required in A. 1 to 5 inclusive plus _ 6. 7. If the floor level of the proposed new development given in 4 above is below the 1 in 50 year flood level the development will not be approved. Extensions to existing development may be allowed within the 1 in 50 year flood plain provided such extensions are not used for habitable purposes e.g. en suite bathrooms may be permitted. If the floor level of the proposed development given in 4 above is above the 1 in 50 year flood level, then the Engineer must certify that there is a continuous means of access (whether private or public) from the residential building to a public road all at a level above the 1 in 50 year flood level. 3.../... C. For Sub_Divisional Scheme Approval 1. In terms of Section 14 of the National Water Act 1998, all plans relating to the subdivision of land shall indicate the maximum level likely to be reached on an average every hundred years by floodwaters on the land in question from any watercourse with a known and defined channel and with a catchment area exceeding one square kilometre. 2. Section 3 of the Council's Subdivisional Bylaws require, in addition, that all plans relating to the subdivision of land shall indicate the maximum flood level under a flood of recurrence period 1 in 50 years from any such watercourse. 3. When it is necessary to show a flood line on a plan, an Engineer shall calculate the position of that flood line and the following minimum information should be provided with the subdivisional application:_ 1) Principle method prediction; 2) Assumed 1 catchment; of calculation and formula utilised for flood level in 50 year and 1 in 100 year rainfall intensity in the 3) Catchment area taken in Ha; 4) Assumed catchment runoff factor where appropriate. JUNE1999 ENGINEERING UNIT 166 OLD FORT ROAD DURBAN 4001 DATE: Dear Sir/Madam, FLOODING INFORMATION Property ............................................................... ............................................................... Address ............................................................... ............................................................... With reference to your enquiry at this Department, the following information is given in respect of the above property:_ Under a flood of recurrence period 1 in 50 years, the property/development is estimated to be (a) totally affected by flooding. (b) partially affected by flooding. (a)not affected by flooding (i) It is regretted that the exact level and/or position of the flood line on your property cannot be made available, due to variances from time to time in local developments which affect such levels and positions. Before proceeding with future development on the property, professional advice should be sought from a registered professional engineer specialising in hydrological and hydraulic design work. For your guidance, the professional engineer will be required to provide the following information in relation to the development of the property, as given on the annexure attached. Additional information may be requested in respect of any particular development. (ii) This Department has no objections to the abovementioned development. Yours faithfully, A.M. PETERS HEAD : ENGINEERING 2.../.... INFORMATION TO BE PROVIDED IN RELATION TO THE DEVELOPMENT OF PROPERTIES SITUATED IN THE 1 IN 50 YEAR FLOOD PLAIN The Engineer referred to below must be a Professional Engineer experienced in hydrological and hydraulic matters. A. For All Development 1. The level in metres M.S.L. of the 1 in 50 year and 1 : 100 year flood line on the property. 2. 3. Calculations by the Engineer indicating method of determining the flood line employed. The position of the flood line on the property, whether the proposed development is inside or outside the flood plain and the floor level of the proposed development in metres M.S.L. where appropriate. 4. The information from 3 is to be shown on all plans relating to the development. 5. If all or part of the development including the earthworks is inside the existing 1 in 50 year flood plain, then the Engineer must certify _ a) that the foundations are capable of withstanding any forces or flood effects on the development and be prepared to provide design calculation to that effect if called upon to do so; b) that the development in the flood plain will not affect the flooding or flood levels on adjacent properties, upstream, downstream and opposite as the case may be, and such certification to be backed up by calculations. B. For All Residential Developments _ New or Extensions The information as required in A. 1 to 5 inclusive plus _ 6. If the floor level of the proposed new development given in 4 above is below the 1 in 50 year flood level the development will not be approved. Extensions to existing development may be allowed within the 1 in 50 year flood plain provided such extensions are not used for habitable purposes e.g. en suite bathrooms may be permitted. 7. If the floor level of the proposed development given in 4 above is above the 1 in 50 year flood level, then the Engineer must certify that there is a continuous means of access (whether private or public) from the residential building to a public road all at a level above the 1 in 50 year flood level. 3.../... C. For Sub_Divisional Scheme Approval 1. In terms of Section 14 of the National Water Act 1998, all plans relating to the subdivision of land shall indicate the maximum level likely to be reached on an average every hundred years by floodwaters on the land in question from any watercourse with a known and defined channel and with a catchment area exceeding one square kilometre. 2. Section 3 of the Council's Subdivisional Bylaws require, in addition, that all plans relating to the subdivision of land shall indicate the maximum flood level under a flood of recurrence period 1 in 50 years from any such watercourse. 3. When it is necessary to show a flood line on a plan, an Engineer shall calculate the position of that flood line and the following minimum information should be provided with the subdivisional application:_ 1) Principle method prediction; 2) Assumed 1 catchment; of calculation and formula utilised for flood level in 50 year and 1 in 100 year 3) Catchment area taken in Ha; 4) Assumed catchment runoff factor where appropriate. JUNE1999 rainfall intensity in the ENGINEERING UNIT 166 OLD FORT ROAD DURBAN 4001 DATE Dear Sir/Madam, ULWAZI NGEZIKHUKHULA Property ............................................................... .............................................................. Address .............................................................. .............................................................. Ngokwesicelo semininingwane yakho kuleli hhovisi, nansi imininingwane enikeziwe maqondana nendawo engenhla:Ngokwezikhukhula ecenzeka kanye eminyakeni engamashumi amahlanu, indawo kulindeleke ukubaa) Ilimale yonke ngenxayezi zikhukhula b) Ingxenye yayo ithintwe izikhukhula 1. Siyaxolisa ukukwazisa ukuthi amaleveli okuyiwo kanye/noma inclawo lapho kumele kuhambe khona izihukhula, ingetholakale, ngenxa yokushintshashintsha kwezinthuthuko ezenzakabyo eziipazamisa lawa noma izindawo 2. Ngaphambi kokuba uqhubeke nokwakha, izeluleko zingathobkala konjimyela ababhalisik abanolwazi kwezokuathdhungulwa kwamanzi. 3. Uku uthole ukwelulekwa, unjinyela kuzomele anikezele lolu lwazi olulandelayo oluqondene nezokuthuthuwswa kwezindawo njengoba kulotshwe kwi Elandelayo Ulwazi olunzulu mayelana nezenthuthuko, luyatholakala Yumi ozithobayo A.M. PETERS HEAD : ENGINEERING UKUNIKEZELWA KWEMIMNINGWANE MAQONDANA NOKUTHUTHUKISWA KWEZINDAWO EZITHINTEKAYO EZIKHUKHULENI ZONYAKA OWODWA KWENGAMASHUMO AMAHLANU Unjinyela okukhulumywa ngawe ngezanansi, kumele kube unjinyela obhalisiwe nonolwazwi ngezinkinga eziphathelene namanzi ezimvula A. Okwazo Zonke Izinhlelo Izenththhuko 1. 2. Izibalo zikanjiniyela ezivezaindlela esetshemisiwe ukuthola 3. Indawo engatholwa izihhukuka ecacisayo uma inthuthuko esohlelweni ingaphokathi noma ngaphandle komncele wezikhukhula kanye neleveli tenthuthuko esohlelweni kumamitha, lapho kufanelekile . 4. Ulwazi/iminingwane ekunombolo 3 ngaphezulu, kumele itshengiswe kumaplani amayelana nezenthuthuko. 5. Uma yonke noma ingxengenye yentuthuko kanye nezokusetshenzwa komhlaba, kungaphakathi komncele amahlanu, unjinyele kumele aginsekise: (1) wezikhukula zonyaka kwengamashumi Ukuthi isisekelo somuzi siqine singamelana ukuthi nemimoya noma nezikhulukhula futhi ezisthshenziselwe alungele ukumkezela ngezibalo ukumelana nalomonakalo uma kudingeka ukuba enze njalo. (2) Ukuthi loko kuthuthukiswa oku semncelem wezikhukhula kungephazamisane, nezikhukula noma namaleveli ezikhukula emizi eseduzane, enhla nangaphesheyafuthi leso nomfula, ezansi nomfula, siqinisekiso kumele sihambisane nezibalo zakhona. II. OKHWEZINTUTHUKO EZIKHULISWAYO ZASEMAKHAYA Iminingwane njegoka kudingeka ku A1. Kuya ku-5 - EZINTSHA NOMA