DIRECTORATE-GENERAL FOR SECURITY AND SAFETY DIRECTORATE B FIRE, FIRST AID AND PREVENTION ______________________ OPEN CALL FOR TENDERS EP/DGSAFE/UIB/SER/2014-014 Fire safety, first aid (lot 1) and outdoor security (lot 2) services on the European Parliament site in Brussels SPECIFICATIONS – PART IV ____________________ PS – Price schedule 2014-014 Bordereau de prix Page 1 GENERAL POINTS – BREAKDOWN This Price Schedule summarises all the prices applicable to the contract: 1 The overall annual lump sum corresponding to the functioning of the administrative structure; 2 The hourly rates applicable to staff from the operational structure. These hourly rates distinguish, by category, the services provided on working days and those provided at the weekend and during public holidays. It should be noted that, in the event of provision of a service straddling two periods, it is the moment when the service is taken which will determine the hourly rate. Example: for an officer on duty from Friday to Saturday, the order form will indicate the ‘working days’ hourly rate. For an officer on duty from Sunday to Monday, the order form will indicate the ‘weekends and public holidays’ hourly rate. These amounts are lump sums exclusive of tax expressed in euros. They may be revised according to the clauses of the framework contract. The tenderer is required to fill in all the sections in the price schedule. 2014-014 Bordereau de prix Page 2 1. ADMINISTRATIVE STRUCTURE The overall annual lump sum corresponds to all the costs from the administrative structure as defined in the invitation to tender documents. This amount will be invoiced monthly (one twelfth). The overall annual lump sum: ……………………………………… EUR net 2. OPERATIONAL STRUCTURE - HOURLY RATES Lot 1: Hourly rates1 Sections Working days Weekends or public holidays* On-site manager2 Team Leader Fire safety officer CDP1 CDP2 Working days CDE1 Weekends or public holidays* CDE2 Working days ASI1 Weekends or public holidays* ASI2 Lot 2: Hourly rates3 Sections Team leader Outdoor security officer Working days CDEG1 Weekends or public holidays* CDEG2 Working days VIG1 Weekends or public holidays* VIG2 1 The sums to be filled in are the lump sum hourly costs expressed in euros and exclusive of tax. 2 It may be necessary, in exceptional circumstances, for the on-site manager to be present on weekends. * The public holidays to be taken into consideration are those of the European Parliament. For illustrative purposes, the list of EP public holidays in 2015 is appended to the last page of this document. 3 The sums to be filled in are the lump sum hourly costs expressed in euros and exclusive of tax. 2014-014 Bordereau de prix Page 3 3. EVALUATION SCENARIO The total price to consider for the evaluation of the tenders will be equal to the sum of the annual prices calculated according to the estimated volume for each category (lines 1-10) and the annual price for the administrative section (line 11). The volumes indicated in the Price Schedule are only an estimation and do not represent a commitment on the part of the European Parliament. A CATEGORY B C D HOURLY RATES Estimated annual volume (h) Estimated annual total (D= B x C) 1 On-site manager CDP1 2.950 2 On-site manager CDP2 50 3 Team Leader CDE1 15.500 4 Team Leader CDE2 5.000 5 Fire safety officer ASI1 41.000 6 Fire safety officer ASI2 12.500 7 Team leader CDEG1 6.000 8 Team leader CDEG2 2.800 9 Outdoor security officer VIG1 12.000 10 Outdoor security officer VIG2 3.000 11 Overall annual lump sum for the administrative section Total = D1+D2+D3+D4+D5+D6+D7+D8+D9+D10+D11 Lot 2: The volume of hours is estimated at ± 23.800/year. At……………….................... , on ................................................. Drafted in one original copy, The statement ‘Read and approved’ + Signature of the tenderer / representative thereof Firm’s stamp 2014-014 Bordereau de prix Page 4 4. Public holidays and closing days of the European Parliament in 2015 1 January 2015 2 January 2015 2 April 2015 3 April 2015 6 April 2015 1 May 2015 14 May 2015 15 May 2015 23 May 2015 21 July 2015 2 November 2015 24-31 December 2015 2014-014 Bordereau de prix Page 5