Borras Construction Ltd RISK ASSESSMENT Document No. Issue date Review Due Approved By: Lone Working RA028 November 2014 November 2016 K Blatchford Generic Risks NO. 1 2 PERSONS AT RISK Directly Employed Site Based Staff Social Housing Staff (RLO’s, Site managers and surveyors). IDENTIFIABLE HAZARD Lone working at customer premises Visiting homeowners and finding themselves in potentially violent or threatening situations. RISK CONTROL MEASURES TO BE PUT IN PLACE P 1 S 1 R 1 Operatives are to contact the office to log them as a lone worker. When the task is completed the operative is to call head office to confirm completion of the task. If no call is received then the office is to contact to the operative to confirm completion of the task. If the operative cannot be contacted then the last known destination should be checked to ensure operative is not there. Staff to make site management aware of movements for the day. If movements change unexpectedly then communicate this to office. All mobile staff to have mobile telephones. Management to communicate any at risk register information to staff (including sub-contractors). General policy that no-one is to visit “at risk” residents (including site managers, RLO’s, Surveyors and Operatives) alone. Staff visiting tenants to check into site office (or telephone office) at the end of each day. If an expected contact is not received then the responsible manager is to investigate by contacting operative, contacting the areas the operative was thought to be visiting, contacting the operative’s next of kin and ultimately contacting the police. Borras Staff likely to visit homeowners on their own to receive training in avoiding potentially violent or threatening situations. Staff to report any acts of violence or aggression as an incident or near miss. 2 2 4 THIS GENERIC RISK ASSESSMENT IS INTENDED AS A GUIDE ONLY AND DOES REPLACE THE NEED FOR SITE SPECIFIC RISKS TO BE ASSESSED RESIDUAL RISK P S R 1 1 1 1 2 2 Borras Construction Ltd RISK ASSESSMENT Document No. Issue date Review Due Approved By: Lone Working RA028 November 2014 November 2016 K Blatchford Site Specific Risks Contract No. Contract Name: NO. PERSONS AT RISK RISK IDENTIFIABLE HAZARD P S CONTROL MEASURES TO BE PUT IN PLACE R 1 2 3 4 5 6 Reviewed for Site use by; Sign: Print Name: Risk Assessment Notes Definitions ACCIDENT HAZARD RISK PROBABILITY SEVERITY An unplanned, uncontrolled event which has led to damage, ill health or injury A condition or practice with the potential to cause harm, damage, ill health, injury or other loss The combination of the probability that a HAZARD will result in an ACCIDENT and the severity of that ACCIDENT The likelihood of an accident occurring The outcome of accident Probability (P) 1 = Unlikely 2 = Possible 3 = Probable Severity (S) 1 = Minor 2 = Serious 3 = Major P=1 P=2 P=3 S=1 L L M S=2 L M H Key S=3 M L = Acceptable Risk, reduce if possible H M = Tolerable Risk, reduce using control measures H H = Unacceptable risk, re-assess hazard Date: RESIDUAL RISK P S R