Introduction
• Wide area measurement system (WAMS) is a measurement system include digital metering devices and communication system designed to monitor, operate and control in wide geographical area.
• WAMS process features three functions:
Data acquisition
Data transmitting
Data processing
• Performed by measuring devices
• Devices are responsible for providing raw data for different applications
• Examples of devices:
Phasor measurement unit (PMU)
Supervisory control and data acquisition (SCADA)
Remote terminal unit (RTU)
Digital protective relay (DPR)
Digital fault recorder (DFR)
• A communication infrastructure (CI) should be established
• Performed by software packages in energy management systems (EMS)
• EMS applications has functions of operation, control and optimization in power systems based on the acquired dara.
• EMS functions include:
Online state estimation (SE)
Load flow (LF)
Optimal power flow (OPF)
Load forecast (LF)
Online low-frequency oscillation (LFO) analyses
• Data acquired by measuring devices are raw data
• Cannot be used by EMS applications directly
• Online state estimation (SE) extracts creditable data from raw data
• Creditable data can be used by applications
• SE is the basis of EMS applications
• A data resource commonly used
• Measures voltage and current phasors
• Lead to a simplified linear state estimator
• Sample rate is very high (30-60 samples per second)
• High data rate transmission is required
• Focus of this work
• Measurement placement study:
Observability: A system is observable if
#of measured var. >= # of var. that should be estimated
• EMS application design:
Fast and efficient algorithms for EMS applications
• Communication infrastructure (CI) design and planning
Dependent media (parts of power network elements): power line communication (PLC), all-dielectric self supporting (ADSS), and optical power ground wire
(OPGW).
Independent media: wireless and satellite communication.
• Dependent media can be co-optimally designed in conjunction with power system planning problems.
Problem Formulation
• Objective: co-optimize the meter placement and its CI for state estimation problem.
• Measurement device: PMU
• Transmission media: OPGW
• Optimization tool: genetic algorithm (GA) due to its accurate solution where high complexity is not a major concern
• A PMU on a bus can observe this bus and all its incident buses.
• PMU placement: find minimum set of PMUs such that the entire system can be observed.
Cost for one PMU
Indicates whether there is a PMU on bus i n-dimentional arrays
• Define adjacency matrix
• Observability:
• Add up the columns i of adjacency matrix if
PMU i
=1. If the array of summation vector are equal or bigger than 1.
• Define adjacency matrix
• Observability:
• Add up the columns i of adjacency matrix if
PMU i
=1. If the array of summation vector are equal or bigger than 1.
• Gene (objective+constraint):
Total # of PMUs
Total # of zero arrays in OBS vector
• Optimal case: fitness<1
• OPGW cables perform both grounding and communication.
• Objective: find a minimal OPGW plan which covers all PMU enabled buses.
Total # of OPGW links
Cost per km cable Length of i th link
Total length of transmission lines
• penalty:
PMU enabled bus with maximum conjunction is found as starting node
The path from starting node to all other PMU enabled bus is examined
If a path does not exist, increase the penalty function by 1
• Optimal case: fitness<1
• Objective: find the optimal set of PMUs and its required communication links simultaneously.
• Can be solved by multiobjective genetic algorithm (MOGA)
• Comparison of two methods of placement:
Independent
Find the optimum placement of PMUs, then determine the communication links
Simultaneous
Determine the placement of PMUs and links together
• IEEE 30, 57, 118-bus test networks
CI Nodes: the number of nodes in their corresponding CIs
OPGW Coverage: the length percentage of transmission lines which should be equipped by OPGW cable.
Total Cost: the total cost of PMU sites and their corresponding CI.
• Optimal placement of PMUs and their required communication infrastructure of power systems are co-optimally designed for state estimation problem.
• Although the number of measurement devices, for full observability of the system, may be increased by proposed approach, the considerable reduction in communication media decreases the total cost of WAMS implementation.