Future Instrument Plan of JAPAN Outline: Current Status & Activities Business Plans Instrumentations: FL and 2nd Generations Tomo Usuda (Subaru Telescope / NAOJ) June 26 2010 Members of TMT-Japan NAOJ: M.Iye, H.Takami, T.Yamashita, T.Usuda, N.Kashikawa, W.Aoki, N.Takato, T.Kodama, J.Nishikawa, M.Imanishi, H.Akitaya (TMT), T.Nishimura, R.Suzuki, S.Oya, Y.Hayano, H.Terada, T.Fujiyoshi (Subaru), H.Izumiura, E.Kambe (OAO), S.Ozaki (ATC), et al. Univ of Tokyo: N.Kobayashi, K.Motohara, M.Konishi, Y.Uchimoto, I.Sakon, T.Miyata, S.Sako, K.Shimasaku, T.Minezaki, M.Hayashi, et al. Tohoku Univ: T.Yamada, M.Akiyama, C.Tokoku, T.Ichikawa, K.Hane et al. Kyoto Univ: H.Sugai, T.Totani, T.Maihara, et al. Kyoto Sangyo Univ: H.Kawakita, Y.Ikeda, et al. Ibaraki Univ: Y.Okamoto Ehime Univ: T.Nagao ISAS/JAXA: H.Kataza, H.Fujiwara, et al. Carnegie Obs: M.Ouchi MPIA: M.Goto Univ. of Hawaii IfA: A.Tokunaga, M.Chun, J.Rayner Univ. of Florida: C.Packham, C.Telesco UC Davis: M.Richter Current Status & Activities Observer since June 2007 Collaborating Institution since Nov 2008 Goal: Equal Partner (~25% Contribution) NAOJ Budget in FY2010 (Apr~Mar): $1M for R&D (M1, M3, etc.) 2010 June: Submitted R&D Budget for FY2011 (~$10M including M1, M2/M3, Instruments) 2011 June: Submission of Construction Budget plan from FY2012 to 2020 (TBD: ~$350M including 1st & 2nd instruments) Call for Proposal of TMT-J Instruments on June 2008 Four Instruments were selected and have been studied Internal review meetings (Panels: F.Iwamuro, T.Kodama, N.Takato, T.Usuda) for Key technologies, Science cases, Budget, etc.) TMT-J Four Instruments High Priority & Feasibility MICHI (Mid-IR Camera, High-disperser, and IFU) (Y.Okamoto+): Modified MIRES ← COMICS, TAO NIR High Dispersion Spectrograph (N.Kobayashi+): NIRES-b and NIRES-r ← IRCS-HRU, WINERED & IRDI (Immersion Gr., Astro-Comb, fiber) Medium Priority & Feasibility NIR Multi IFU spectrograph with MOAO (M.Akiyama+): IRMOS ← RAVEN, SIRMOS Optical High Dispersion Spectrograph (W.Aoki+): HROS ← HDS, HIDES (I2 cell, image slicer, fiber) MICHI (Mid-IR Imager & Spectrometer) Imaging & Spectroscopy @7~25um FOV=27.5x27.5” / 0.”08@10um w/ MIRAO IFU (R=300@N / 600@Q), Long-slit (900 / 1800), Echelle (120,000 / 60,000) Options: Polarimetry @N-band Key sciences Planet formation & Biomarkers Material lifecycle in the universe AGN & Cosmology Collaborations w/ UH & Florida team (Tokunaga/Chun/Packham) R&Ds Image slicer etc. MIR slicer 5 NIR High Dispersion Spectrograph R=40,000 (80,000 max) Short arm (0.9~2.5um) & Long arm (1.9~5.5um) Slit: 0.”02 x 0.5~1” Options: Long slit (15~30”) / MOS (5~10 targets) J~20, H~20, K~19.5 (10σ) R~50,000, 1hr Key sciences IGM at 2.5<z<6(metallicity), and z>6 (re-ionization) Atmosphere of exoplanets Collaborations with UH NIRES team (J.Rayner/A.Tokunaga) Prototype: WINERED, IRCS-HDU, & IRDI ZnSe & Si immersion gratings Molecular gas cell, Laser comb. NIR Multi IFU spectrograph w/ MOAO NIR IFU spectroscopy of 10~20 objects simultaneously (cf. IRMOS) FOV 5arcmin w/MOAO, spatial resolution 0.”02@2um 20 IFU units, R=1,000~20,000 Key sciences Search for galaxies in formation-phase at 7<z Physical properties of galaxies in growing-phase at 2<z<7 Collaborations w/ U.Victoria, HIA for RAVEN on Subaru Telescope R&Ds Large stroke (>20um) MEMS-DM tomography algorithm Fiber IFU … Optical High Dispersion Spectrograph “Ulitimate” Optical Spectrograph focusing on the accuracy and stability (e.g., CODEX, ESPRESSO) Key sciences Detection of terrestrial exoplanets around solar-type stars Direct measurement of cosmic expansion Required accuracy of radial velocity ~10 cm/s (e.g. 1m/s accuracy is attained with current ESO HARPS) R&Ds Stabilities of inst. Temperature, air pressure, opt. alignment Laser comb Image Slicer 8 Current Activities: Instrumentation Schedule (TBD due to budgetary condition and negotiation): 2010 Summer: Submission concept design to TMT-J project 2010 Fall: First two J-instruments selection 2010 Dec: Submission two proposals to TMT 2012: TMT Design Review process (see table) 2019: Commissioning on site and test observations 2009 WFOS IRIS 2010 2011 2012 CoDR PDR FDR Test PDR FDR PDR FDR CoDR IRMS 2013 2014 Test 2015 2016 2017 2018 Comm 1st Light NFIR AOS Comm 1st Light Test Comm 1st Light 2019 Japan #1 R&D R&D R&D CoDR PDR FDR Test Comm Japan #2 R&D R&D R&D CoDR PDR FDR Test 9 Comm Summary Various activities to make a concrete business plan including the telescope optics (M1/M2/M3), instruments, etc. Four 2nd generation instruments have been proposed. We would like to submit the Construction Budget plan from FY2012 to 2020 (TBD: ~$350M) on June 2011 → Need agreements and negotiation with TMT & partners Activate TMT science symposium and science cases → Invitation of TMT SAC & partner members for such meetings in Japan 10