3G-NODE-B MIGRATION TO ETHERNET BACKHAUL April 8, 2015 BB UNIT 1 Introduction At present , Node-Bs are using TDM backhaul for the connectivity with the RNC. The bandwidth used are nXE1 where n varies from 3 to 12. In order to provide higher bandwidth to customers, we need to migrate to Ethernet backhaul. Currently, there are 1126 Node-Bs and 13 RNCs. Out of 1126 Node-Bs, 699 are working on OFC. April 8, 2015 Agenda 2 Advantages and challenges Advantages Ethernet can provide higher bandwidth . Cheap and better economy of scale. Efficient transport. Challenges Lacks simple and reliable synchronization functionality of TDM. Solution IEEE 1588 PTP –for synchronization April 8, 2015 Agenda 3 3G- NETWROK DETAILS April 8, 2015 BB UNIT 4 3G-Line Diagram-Data 1+1 GE 4 GE Node-B FE 100 Mbps April 8, 2015 RNC SGSN GGSN Unchannelised STM-1. To be upgraded to match with the Ethernet backhaul upgradation. NME-1 5 Interfaces-Node B and RNC SFPs are required to support FE optical at Node-B end. There are 13 RNCs with 3 different types. GE port which will be made available by vendor are: A4 3 Nos of GoU Boards 6+6 GE A3 2 Nos of GoU Boards 4+4 GE A2 1 No of GoU Board 2+2 GE Synchronization requirement will be met M/s Huawei supplied IEEE 1588 server. This will be used to distribute synch signals through Ethernet backhaul. April 8, 2015 Agenda 6 RNC-Node-B Details-1 Sl No RNC Location Serving SSA # of Node-B on OFC 1 CBE-SBC(A4) CBE, CNR CBE:99, Ooty:7,CNR:4 2 SLM-MEY(A3) SLM SLM:57,NAM:10 3 DPI-MAINE10B(A2) DPI DPI:9,HOS:10,KRI:8 4 ERD-TE(A3) ERD ERD:36,TUP:51 5 TR-DTAX(A3) TR TR:68,ARY:2,PER:2,KAR:13,PDK:10 6 MAELLIS#1(504)( A2) MA MA: ?? , THENI:8 7 MAELLIS#2(505)( A2) MA KKL:2, 5,MA: ?? , DDG:15 April 8, 2015 Agenda 7 RNC-Node-B Details-2 Sl No RNC Location Serving SSA # of Node-B on OFC 8 VLR-TE(A2) VLR VLR:23,TV MALAI:8 9 TNJ-TE(MC)(A2) TNJ,KMB TNJ:22,TIRUVARUR:6,,KKL:2,KMB:14,Nagai:7 10 KKD-DTAX(A2) KKD KKD:13,SVG:4,RMN:6, RMM:1 11 TT-DTAX(A2) TT,VGR TT:29,VGR:7, SVK:4 12 TVL-MW(A2) TVL,NGC TVL:27,NGC:15,KK:2 13 PY-TE(A2) CDL,PY PY:28, CDL:12, VLP:3 A4: 3 GoU Boards, 6+6 A3: 2 GoU Board, 4+4 A2: 1 GoU Board, 2+2 April 8, 2015 Agenda 8 RNC andTier1/2 Location Details-1 Sl No RNC Locat ion Servin g SSA Tier1 Location Capacity of RPR RING 1 CBESBC CBE, CNR CBE-CENTRAL 10G 2 SLMMEY SLM SLM-SVPT 10G 3 DPIMAINE10B DPI DPI-MAIN E10B No RING 4 ERDTE ERD ERD-TE 10G 5 TRDTAX TR TR-DTAX 10G 6 MAELLIS# 1(504) MA 7 MAELLIS# 2(505) MA MA-ELLIS NAGAR(T2) 10G April 8, 2015 Agenda 9 RNC andTier1/2 Location Details-2 Sl No RNC Locat ion Servin g SSA Tier1 Location Capacity of RPR RING 8 VLR-TE VLR VLR-TE 10G 9 TNJTE(MC) TNJ,KMB TNJ-TE(MC) 10 KKDDTAX KKD KKD-DTAX No RING 11 TTDTAX TT,VGR TT-DTAX No RING 12 TVLMW TVL,NGC TVL-DTAX 10G 13 PY-TE CDL,PY PY-TE 10G April 8, 2015 Agenda 1G 10 BB- NETWROK DETAILS April 8, 2015 BB UNIT 11 BB AGGREGATION NETWORK-1 SSA RPR RING T1 Location CBE#1 10G CBE-CENTRAL CBE#2 10G CBE-MAIN CNR NO RING Ooty CDL 1G CDL-TE April 8, 2015 Tier2 Locations CBECENTRAL KURICHI NEYVELI Vilupura m PEELA MEDU NME-1 GANAPAT HY THUDIYA LUR SBC GE: Thondam uthur 12 BB AGGREGATION NETWORK-2 SSA RPR RING T1 Location DPI NO RING DPI-TE ERD 10G ERODE-TE KKD NO RING KKD KMB 1G KMB April 8, 2015 NME-1 Tier2 Locations Perundurai Bhavani ADUTHURAI SRINAGAR COLONY 13 BB AGGREGATION NETWORK-3 SSA RPR RING T1 Location MA 10G MA-TALLAKULAM MATALLAKULAM KK NAGAR NGC 10G(But No RING) NGC-TE COLACHEL NGC-TE PY 10G PY-TE OKP SLM 10G SVPT-TE TNJ 1G TR 10G April 8, 2015 Tier2 Locations EAST MASI VILLAPURAM VILLIANUR THIRU CHITRA AMBALAM LAWSPET MEYYANUR SALEM TOWN AMMAPET TNJ KARANTHAI MED COLLEGE TR-CNT THILLAI NGR TR-MGG NME-1 TR-SRGM ELLIS NAGAR TR-CANT 14 BB AGGREGATION NETWORK-4 SSA RPR RING T1 Location TVL 10G TVL-TE TT NO RING TT-TE VGR 1G VLR 10G April 8, 2015 Tier2 Locations PALAI MELAPALYA M VGR-TE SIVAKASI SATUR VLR-TE SANTHAIVASA L POLUR CHETPET ARANI RANIPET KATPADI NME-1 WANDIWASH THIRUVETTI PURAM 15 INTERFACE DETAILS April 8, 2015 BB UNIT 16 Interfaces-3G a) FE ELECTRICAL OR b) FE OPTICAL SFP NODE-B W/L MODE,Line Rate TX Pwr(dbm) RX Sens(dbm) Range Connector 850nm, FE MM,2.125G -9.5 to -2.5 -17 0.5km LC-SC 1310nm(FE over STM-1) SM,STM-1 -15 to -8 -31 15Km LC-SC W/L MODE,Line Rate TX Pwr RX Sens Range Connector 1310nm,GE SM,1.25G -9 to -3 -20 10km LC-SC RNC GE OPTICAL SFP April 8, 2015 NME-1 17 Interfaces-Broadband RPR Tier 1/Tier2 FE: FE-FX-PHYUTSTARCOM 1XX0924906-F(as seen in Vellore) Interface W/L MODE GE 1550nm FE 850nm TX Pwr(dbm) Range Connector SM 1-40Km LC MM 100 m1000m LC Availability of SFPs to be checked Interface W/L MODE GE* 1550nm SM 20Km FE 850nm SM 500m FE: 155Mbps,2Km,850 nm Rodevices make (as seen in Vellore) April 8, 2015 RX Sens( dbm) GE: GE-LH-40 UTSTARCOM 1XX0878700-H(as seen in Vellore) TX Pwr(dbm) RX Sens( dbm) Range *4 ports of GE can be made as Electrical also NME-1 Connector OCLAN GE: 1.25Gbps,30Km,1550nm Rodevices make (as seen in Vellore) 18 Interfaces-TRANSMISSION Interface W/L MODE FE optical 1310nm SM TX Pwr(dbm) CPE-8 Availability of SFPs to be checked FE electrical Interface W/L MODE GE 1000 Base LH(1500nm/ 1550nm) SM FE optical 1310nm SM FE electrical Range Connector 15KM LC - TX Pwr(db m) RX Sens( dbm) Range Connector LC 15Km MADM-16 LC - FIBER XON 1310nm 155m SFP(as seen in Vellore) April 8, 2015 RX Sens( dbm) WTD RTXM 139-400 WHTD 004201 155m,15Km,1310nm-SMESFP(as seen in Vellore) FTTH-ONT NME-1 4 FE electrical 19 OPTIONS AND CHALLENGES April 8, 2015 BB UNIT 20 Various Options and its challenges-1 Riding over BB Aggregation Ring i.e RPR Ring. RPR are mostly intra city rings. The rings are not available in all SSAs and very few of them are 10G. Already, NME-University(155 Mbbs), GPON/GEPON, WiMaX, IPTAX,IPTV,VPN use this ring for transport. This is apart from the DATAONE Traffic the purpose for which the ring has been designed originally. Some Tier2 switches do not support FE interfaces. The availability of SFPs are very limited. April 8, 2015 Agenda 21 Various Options and challenges-2 Capitalizing on FTTH services :GPON and GEPON based FTTH services are available at following locations only. Location Technology OLTs Coimbatore City GPON 35 Tirupur City GPON 01 Salem City GEPON 01 Trichy City GEPON 02 Vellore City GEPON 01 Madurai City GEPON 02 Pondi City GEPON 01 April 8, 2015 Agenda 22 Various Options and challenges-3 Using the combination of MADM-16 Rings with CPE-8. SFP availability limited. Using the combination of FTTH and CPE-8. Using the combination of Tier2 and CPE-8. SFP availability to be checked. Using E1-FE converter /WDM splitter. April 8, 2015 Agenda 23 SCENARIOS POSSIBLE-1 Using RPR Ring Node-Bs co-located with RPR Tier1/Tier2. Node-Bs Nearer to Tier1/Tier2: Drive distance of SFP and availability of fibre pair are critical. If not WDM splitter may be used. Node-Bs which are built-Up to Nearest Tier1/Tier2 station using CPE-8 sytems : Use 1310 nm SFP at Tier1/Tier2end. Using FTTH ONU-s which have FE electrical. Using the combination of FTTH and CPE-8: Use FE electrical interfaces available at both ends. . April 8, 2015 Agenda 24 SCENARIOS POSSIBLE-2 Using the MADM-16 Rings Node-Bs co-located with MADM-16 terminal: Use FE electrical available at both ends. Node-Bs which are built-up to the nearest MADM-16 Station by using CPE-8 Systems: Use FE electrical available at both ends. Using the Aggregation Switch : Built media upto Aggregation switch which should be located at RNC end. Using E1-FE converter /WDM splitter April 8, 2015 Agenda 25 DIRECT CONNECTIVITY USING SFP If Tier 1 or Tier 2 are located within the drive distance of SFP and spare fibre is available from Node-B location to Tier1/2 location, 1310nm SFP at Node-B end can be used. Please ensure 1310 nm SFP at Tier1/2 end which may be available spare from CPE-8/MADM-16 systems. April 8, 2015 BB UNIT 26 CONNECTIVITY USING CPE-8 system If Tier 1 or Tier 2 location is used as Built-up stations for distant end NodeBs (using CPE-8 systems), put the 1310nm SFP at Tier 1 or Tier2 and provide connectivity. April 8, 2015 BB UNIT 27 USING MADM RING MADM-16 Ring Nodes can also be used to carry FE traffic from CPE-8/Node-Bs. MADM terminal in the ring which is colocated at RNC end can also be used to aggregate FE to GE. April 8, 2015 BB UNIT 28 AGGREGATION SWITCH Aggregation switch can be deployed at RNC location for aggregating Node-B traffic in FE interfaces and then make it as GE towards RNC. April 8, 2015 BB UNIT 29 ISSUES-1 Node-Bs generate about 3X14.4 ~ 50Mbps traffic. Hence, riding over RPR ring shall be attempted only in 10G ring locations(8) viz CBE,ERD,MA, PY,SLM,TR,TVL and VLR. (CBE no FE I/F) FTTH is available at the cities of CBE,TUP,VLR,SLM,PY,TR and MA. Node-Bs at CBE may be connected using GPON as there are 35+ OLTs and are of protected configuration. Though FE/GE ports are available in BB/TX nodes, very few SFPs are available. Those too, are required for upcoming BB expansion project. April 8, 2015 Agenda 30 ISSUES-2 It is not clear whether SFPs will be made available to all Node-Bs. RNC interfaces, both uplink and downlinks shall suitably be upgraded. To derive the max benefit, all the connectivity in the chain shall be augmented. Replaced CPE-21 shall be properly reused. ODF/FDF,Patch cords, connectors, SM-MM convertor(modal conditioning patch cords) etc are required depending on the site conditions. April 8, 2015 Agenda 31 ISSUES-3 Synchronizations to be ensured; otherwise call will drop.(No handover with adjacent cell possible ) RNCs located at CBE,TNJ,TT,TVL and PY serve adjacent SSA also. In that scenario, separate 1+1 GE interface to be allocated at RNC end for connecting the adjacent SSA Node-Bs. The present traffic of MADM-16 Ring shall be studied before attempting to use it. April 8, 2015 Agenda 32 CASE STUDY-PY April 8, 2015 BB UNIT 33 RNC-CONNECTIVITY-PY(LOGICAL) 1310,GE,SM,LC RNC 1550,GE,SM,LC ODF TIER 1 In the case of PY SSA, both RNC and Tier 1 are co-located in the same floor. One ODF was also availabe in the MSC SWITCH ROOM which is used for interconnection. 1+1 GE interfaces available in both RNC and Tier1 are used for interconnection. Though wavelength is different, it will work since the receiver in both ends will normally be Wideband but the range will be limited to the lower of the two. April 8, 2015 NME-1 34 PY MADM –RPR-RNC-LOGICAL LSP RBN TKM NNR MADM RING 1 ARK MADM RING 3 BHR PY MADM RING 2 OKP KET GE GE PY T1 PY T1 T2 LSP VIN AVE PY GE FE T2 TCM April 8, 2015 ENR PY MAIN RNC FE KIU MUP MTP MKM T2 BB UNIT MADM RING 5 VIN RPR T1/T2 T2 PY OKP 35 CO-LOCATED NODE-B(WITH Tier 1 or 2) 850nm,FE/GE,MM,LC Node-B 850nm,FE,MM,LC Tier 1 or 2 MM PATCH CORD April 8, 2015 BB UNIT 36 OTHER NODE-Bs Pl refer to the Ann-1(Excel sheet) April 8, 2015 BB UNIT 37 THANKS TRANSMISSION UNIT BSNL-TAMILNADU CIRCLE http://www.bsnl.co.in rbabusrinivas@bsnl.co.in April 8, 2015 THE END 38