COMMUNICATION & WORKS DEPARTMENT 通信 与工程部门 GOVERNMENT OF THE PUNJAB 旁遮普邦政府 PROJECT MANAGEMENT UNIT 项目管理单位 LAHORE RING ROAD 拉合尔二环路 SOUTHERN LOOP 南段 April 13, 2011 NATIONAL ENGINEERING SERVICES PAKISTAN (PVT) LIMITED 2 PAKISTAN PUNJAB GILGIT BALTISTAN ATTOCK CITY CHINA RAWALPINDI JAMMU & KASHMIR (DISPUTED TERRITORY) JHELUM CHAKWAL MIANWALI AFGHANISTAN GUJRAT SARGODHA LAHORE LAHORE BHAKKAR FAISALABAD JHANG P U N P U N J AB J A B KASUR PAKPATTAN MULTAN INDIA D G KHAN BALUCHISTAN IRAN BAHAWALPUR SIND RAHIMYAR KHAN ARABIAN SEA • Punjab, Land of 5 rivers, most populous province of Pakistan. 旁遮普邦, 有五条河流,是巴基斯坦人口最多的省份. • Estimated population (2010) = 81 Million 估计人口(2010年)= 81 万 • Lahore, its capital situated at bank of River Ravi. 拉合尔, 省会城市,在拉维河河岸。 . GROWTH OF LAHORE 拉合尔的发展 1991 - 2010 Municipal Area = 2,300 Sq. Km. 市政空间 = 2,300 平方公里. Estimated Population (2010) = 10.0 Million 估算人口(2010年)= 10.0 万 CENTRAL BUSINESS DISTRICT (2 to 3Km RADIUS) TRANSPORTATION 交通 Predominantly radial with few inter- radials 交通流量 Total registered vehicles = 2.3 Million (1.16 millions in Last 10 years) 共有登记的车辆 = 2.3 万 (1.16 百万 在过去10年) Vehicle travel hours = 1.87 Million / day Vehicle travel distance = 40 Million Kms / day 交通移距 33,470 70% POPULATION (within 7Km RADIUS) DOCUMENTARY OF LAHORE LAHORE RING ROAD PROJECT (拉合尔二环路工程) • • • • • • 142,801 Total Length = 99 Km 总长度= 99公里 Northern Loop Completed = 43 Km 北段(已完成)= 43公里 Northern Loop, 8 Km to be completed by December 2011 北段,2011年12月将完成8公里 NORTHERN LOOP (Completed, Length = 43 Km) 北段(已完成)= 43公 里 Southern Loop = 40 Km 南段 = 40公里 Existing Motorway Part = 8 Km 现有高速公路部分 = 8公里 Traffic ADT 2013 Estimated 预计在2013年每天的交通数据 NORTHERN LOOP (To be Completed by December 2011, Length = 8 Km) 北段,将在2011年12月 完成8公里 SOUTHERN LOOP (Proposed, Length = 40 Km) 南段建议长度 = 40公 里 45,880 SALIENT FEATURES 突出特点 Length (6 Lane Carriageway) 长度(6线行车道) Type of Land Use 土地利用类型 Design Speed 设计时速 No. of Lanes 行车线数目 R.O.W 所需宽度 Interchanges 互通式立交 Underpasses 地下通道 Cost 成本 NORTHERN LOOP (Up to Ferozepur Road) 北段 SOUTHERN LOOP (Ferozepur Road to existing Motorway M2) 南段 51 Km 40 Km Urban Suburban 100 Km / h 120 Km / h 3+3 (6-Lane Carriageway) (6线行车道) 3+3 (6-Lane Carriageway) (6线行车道) 120 m (30 m Railway corridor) (30米的铁路走廊) 60 ~ 90 m Present 现有 Future 未来 Vehicular 行车 9 6 1 5 10 17 6 + 26 Pedestrian Bridges 15 Land Acquisition 土地征用 Construction 建设 Rs. 46.2 Billion (US$ 544 M) Rs. 11.5 Billion (US$ 135 M) Rs. 40.2 Billion (US$ 473 M) Rs. 29.6 Billion (US$ 348 M) Total 总和 Rs. 86.4 Billion (US$ 1.02 B) Rs. 41.2 Billion (US$ 485 M) Pedestrian 行人 TYPICAL CROSS SECTION - NORTHERN LOOP 典型截面 - 北段 ROW = 60 ~ 90 m 所需宽度 = 60 ~ 90米 SERVICE ROAD 辅助道路 SERVICE ROAD 6 LANE CARRIAGEWAY 6线行车道 辅助道路 TYPICAL CROSS SECTION - SOUTHERN LOOP 典型截面- 南段 ROW = 120 m 所需宽度 = 120米 6 Lane Carriageway 6线行车道 Service Road 辅助道路 Service Road 辅助道路 30m Reserved for Rail Corridor 30米的铁路走廊 MOCK PRESENTATION Southern Loop (Length = 40 Km): 南段(长度=40公里): PROJECT FINANCING 项目融资 Road Construction Cost Rs 29.63 Billion (US$ 485 M) 公路建设成本 = 29.63亿卢比(4.85亿美元) Cost of Land Rs 11.54 Billion 土地成本 = 11.54亿卢比 Cost of Tolling arrangements on Northern Loop Rs 3.81 Billion To make it feasible, Development of Ribbon and four land 对北段联网收费安排的成本 = 3.81亿卢比 Clusters for housing and industry are proposed 为了使其具有可行性的,建议带状发展和四个住房和工业楼群 Ribbon and Cluster Development: Cost of Development Rs 12.28 Billion (US$ 143 M) 研制费用12.28亿卢比(美元$ 1.43亿) Cost of Land Rs 17.22 Billion 土地成本17.22亿卢比 Contd…. 旁遮普邦政府提供(GoPb): PROJECT FINANCING 项目融资 i. Tolling Rights, Operation and Maintenance of Northern Loop (to be completed by December 2011 costing Rs 86.4 Billion) 收费权,北段的运行和维护(将于2011年12月完成,耗资86.4亿卢比) ii. Purchase of land for road ROW for Southern Loop Rs 11.54 Billion 购买南段道路用地需要11.54亿卢比 iii. Purchase of land for Ribbon Development and 4 Clusters for Housing and Industrial Area (3,252 Acres) Rs 17.22 Billion 收购土地用于带状发展金额四个居住楼群和工业区的发展 (3,252亩)17.22亿 卢比 Total Contribution of GoPb Rs 115.16 Billion (US$ 1.4 Billion) 总体贡献总额GoPb115.16亿卢比的(14亿美元) FINANCIAL ANALYSIS - 财务分析 Public Private Partnership Mode 公私营合作模式 Assumptions: 假设: i. Southern Loop Project Cost = Rs 74.48 Billion 南段工程造价 (29.63 + 11.54 + 3.81 + 12.28 + 17.22) = 74.48亿卢比 ii. Contribution by GoPb (35 %) (11.54 + 17.22) = Rs 28.76 Billion 由GoPb贡献(35%)=(11.54 + 17.22) = 28.76亿卢比 (Viability Gap Funding Grant, about 35 % in addition to Rs 86.4 Billion already spent on Northern Loop) (资金缺口约35%,除了已经用在北段的86.4亿卢比) Contd…. Assumptions: 假设: FINANCIAL ANALYSIS - 财务分析 Public Private Partnership Mode 公私营合作模式 iii. Concessionaire’s Equity (20 %) = Rs 14.8 Billion 特许公司的股票(20%)= 14.8亿卢比 (9% of Total Cost of Rs 160.88 Billion) (US$ 174 Million) iv. Commercial Loan (45 %) = Rs 39.80 Billion 商业贷款(45%)= 39.80亿卢比 (17% Markup, Loan Tenure 10 years + 2 years grace period) v. Concession Period= 17 Years 特许权期限= 17年 Concessionaire responsible for design, construction of road, land development, Operation & Maintenance and Collection of Toll. 特许公司负责设计,建设道路,土地开发,操作与维护及收费。 PROJECT REVENUES 项目收入 i. Toll Revenues 路费收入 (During Concession Period) (在租界时期) Toll Rates (Car) 收费标准(汽车) (Two/Three wheelers not to be tolled) (两 / 三轮车不另行收费) ii. Revenue from Land Development 土地开发收益 (During first Seven years of Concession) (前7年为优惠期间) = Rs 167.46 Billion = 167.46亿卢比 = Rs 15 / entry = 每次访问15卢比 = Rs 80.12 Billion = 80.12亿卢比 项目的财务分析 (公私伙伴关系的设想) 征地成本 : 28.91亿卢比. 公路建设成本 36.78亿卢比. 旁遮普邦政府股票 成本对经济特区的发展 13.51亿卢比. 总输入 杂项费用 (通货膨胀,保险及贷款安排费) 10.72亿卢比. 贷款= 0.516 美国亿美元 89.92 亿卢比. 经济特区 32% 北段52% 环城路 经济特区 经济特区在5年内出售 (从3至7年) 从整个环道收费 167.46亿卢比. (收费卢比 = 每车15) 输 出 80.12亿卢比. 总回报 财务内部收益率 年度贷款偿还 247.58 14.11 % 9.527亿卢比 亿卢比,10年的 (投资回收期 = 7年) 特许公司的股本回报率 (公私伙伴关系的设想) 公路建设成本 36.78亿卢比 成本对经济特区的发展 13.51亿卢比 总输入 50.29 亿卢比 环城路 经济特区 经济特区在5年内出售 (从3至7年) 从整个环道收费 167.46亿卢比. (收费卢比 = 每车15) 输 出 回报特许公司的股票 22.09% 80.12亿卢比 PROPOSED SITES FOR ECONOMIC ZONES Truck/Bus Stand at Miraka Ribbon Development 3,229 Kanals Industrial Area at Kahna Freight Station / Warehouses at Halloki Residential Area at Taru Gill Cluster Development 22,790 Kanals Ribbon Development PROPOSED ALONG RING ROAD RIBBON Development CLUSTER DEVELOPMENT Industrial LAHORE MASTER PLAN FEATURES Commercial Industrial Bus/Wagon Terminal Proposed Educational Health Residential Truck/Bus Terminal Institutional Parks TYPICAL CROSS SECTION - SOUTHERN LOOP DEVELOPMENT OF ECONOMIC ZONES (WITH RIBBON DEVELOPMENT) 1. Ribbon Development ROW = 244 m (800 ft) Increase Ring Road ROW from 120 m to 244 m (800 feet) to create 124 a linear Economic Zone along Southern m Reserved for Road WayLoop = 120 m up to Development MultanRibbon Road wherever undeveloped land is available. Estimated Area = 3,229 Kanals 2. Cluster Development Service Road 30m Reserved for METRO Service Four are identified at Road (4) number consolidated clusters of land6 Lane Carriageway various locations along Southern Loop which can be developed into Industrial area, Grain market, Freight Station, Truck/Bus Stand and Residential Colony. Estimated Area = 22,790 Kanals PUBLIC PRIVATE PARTNERSHIP SCENARIO PARAMETERS FOR PUBLIC PRIVATE PARTNERSHIP (1) Government of the Punjab will provide an equity/grant of 35% of the project cost in shape of land for road & economic zones. The Concessionaire will provide an equity of 20% of the project cost and arrange commercial loan for remaining 45%. An interest rate of 17% has been assumed for the Loan. The Concessionaire shall collect toll from entire Ring Road. Developed land in Economic Zones has been assumed to be sold out by the Concessionaire within five years after completion of its development. PARAMETERS FOR PUBLIC PRIVATE PARTNERSHIP (2) All construction and O&M costs shall be borne by the Concessionaire. The loan shall be paid back by the Concessionaire in 10 equal installments. Concession Period is 17 years including grace period of two (2) years i.e. construction period. Insurance during construction has been taken @ 1%. Miscellaneous charges for loan arrangement have been taken @ 3% of the loan amount. Price escalation at 10% has been included in Revenue and Cost Streams.