Goldfields Scoping Meeting EIR Presentation June 23, 2014

advertisement
Scoping Meeting
Yuba Goldfields
200-Year Flood Protection Project
Environmental Impact Report
June 23, 2014
Meeting Agenda
•
•
•
•
•
•
•
Welcome and Introductions
Meeting Objective
Project Background
Proposed Project Alternatives
Scoping and CEQA Process
Environmental Issues
Public Comments and Input
2
Introductions
Three Rivers Levee Improvement Authority
Paul Brunner, Executive Director
Downey Brand
Andrea Clark, Legal Counsel
MBK Engineers
Larry Dacus, P.E., Project Engineer
AECOM
Andrea Shephard, Ph.D., Environmental Project Manager
3
Meeting Objective
Seek public and agency input
on the scope and content of the EIR, including
alternatives
4
Proposed Background
5
Project Location
6
Project Need
• Yuba River actively eroding south bank tailings
mound.
• Landform changes in Goldfields have affected
flow paths and made it easier for floodwaters to
flow through the Goldfields.
• Areas that were thought to have 200-year flood
protection are still at risk.
7
Project Purpose
Reduce flood risk to
properties in RD 784 and
TRLIA assessment districts
by providing sustainable
200-year flood protection.
Source: Data compiled by AECOM in 2014
8
Project Objectives
• Prevent 200-yr flood waters from flowing through
Goldfields and flanking State Plan of Flood Control
levee system.
• Implement long term sustainable solution by 2025.
• Minimize impacts on aggregate mining operations.
• Minimize impacts on gold dredging operations.
• Minimize impacts on environmental resources.
• Provide environmental benefits, if feasible.
9
Proposed Project Alternatives
10
Project Alternatives
• Four (4) Action Alternatives plus the No-Project
Alternative to be evaluated at equal level of detail in EIR.
• Alternatives 1, 2, and 3 – Construct embankment within
the Goldfields using existing dredge tailings.
• Alternative 4 – Construct engineered levee south of the
Goldfields using material imported from nearby.
• All alternatives would meet USACE and DWR urban
levee design criteria for 200-year flood protection.
11
Project Alternatives
Alternative 1: 100-Year Project Enlargement
9.0 mile embankment
331 acres in Goldfields
Alternative 2: West-Side Goldfields Boundary Alignment
8.8 mile embankment
317 acres in Goldfields
Alternative 3: South Bank Yuba River Alignment
9.1 mile embankment
291 acres in Goldfields
Alternative 4: Levee South of the Goldfields
3.5 mile embankment
199 acres in Goldfields
12
Project Alternatives
13
Alternatives 1, 2, and 3
200-Year Embankment in Goldfields
Source: TRLIA 2013, adapted by AECOM in 2014
• Regular O&M: inspections, weed abatement, surface patrol road
maintenance.
• During High Flow Periods: Surface road patrols every 4 hours to
identify/address potential flooding issues
14
Alternative 3
Relocation of Waterway 13
Fish barrier at New Outlet
Scour Protection
Source: TRLIA 2013, adapted by AECOM in 2014
Source: TRLIA 2013, adapted by AECOM in 2014
• Will require periodic repair and replacement.
• Expected design life of 50 years.
15
Alternative 4
200-Year Levee South of Goldfields
Source: TRLIA 2013, adapted by AECOM in 2014
• Regular O&M: Same as other alternatives plus management of
vegetative cover on levee side slopes, operation and annual
maintenance of pipe and gates at YCWA canal crossing.
• During High Flow Periods: Surface road patrols every 4 hours to
identify/address potential flooding issues
16
No-Project Alternative
• 200-year flood protection solution not built.
• 100-year flood protection solution built.
• Decreased flood inundation benefits of TRLIA
200-Year Flood Protection Program.
• Portions of RD 784 and TRLIA assessment
districts may be mapped into FEMA floodplains.
• Residents have to purchase flood insurance.
17
CEQA Review Process
18
Purpose of Scoping
• Inform public and agencies
• Receive public/agency input
• Help define project
• Help identify range of
alternatives
• Help identify
environmental effects to
be evaluated
19
Environmental Review Schedule
Notice of Preparation of an EIR
June 13, 2014
Scoping Meeting
June 23, 2014
Scoping Period Ends
July 14, 2014
Notice of Availability/Draft EIR
August 2014
Public Review
45 days
Response to Comments/Final EIR
November 2014
Commenting Agency Review
10 days
EIR Certification
Project Decision
Findings
Overriding Considerations
Mitigation Monitoring Plan
Notice of Determination
Permitting
November/December 2014
2015
20
Opportunities for Input
Scoping Meeting
Today
NOP 30-Day Comment Period
June 13 – July 14
Draft EIR 45-Day Public
Review Period
August/September
21
Issue Areas to be Addressed
• Aesthetics
• Agricultural and Forestry
Resources
• Air Quality
• Biological Resources
• Cultural Resources
• Geology/Soils/Minerals/
Paleo Resources
• Greenhouse Gas
Emissions
• Hazards and Hazardous
Materials
• Hydrology/Water Quality
• Land Use/Population and
Housing
• Noise
• Recreational Resources
• Transportation/Traffic
• Utilities and Public
Services
22
Project Alternatives
23
How do you participate?
• Present your views today.
Please focus on the scope of the project (i.e. project elements and
alternatives & environmental effects and mitigation).
• Provide written comments on the NOP today
or to TRLIA by 5 pm, July 14, 2014.
Paul Brunner, TRLIA
1114 Yuba Street, Suite 218, Marysville, CA 95901
Fax: (530) 749-6990 Email: Pbrunner@co.yuba.ca.us
• Review and comment on the Draft EIR.
• Contact TRLIA throughout the process.
24