3 phases Charger Inverter Introduction

advertisement

CombiPlus Inverter/Charger

18KW, 36KW & 54KW, 72KW, 90KW

3-Phase AC Load

Renewable Energy as Priority

AC

Input

AC / DC

Charger

Solar

Charger

Wind

Charger

ATS

Inverter

AC

Output

Grid, Solar PV & Wind Hybrid Systems

ATS

AC

Input

AC / DC

Charger

Solar

Charger

Inverter

Wind

Charger

AC

Output

Parallel Operation

Virtually unlimited power thanks to parallel operation up to 5 units can operate in parallel to achieve higher power output. Five CP-6000-48 units , for example, provide

30KW of output power.

Three Phase Capability

In addition to parallel connection, three units of the same model can be configured for three-phase output .

But that’s not all: up to five sets of three units can be parallel connected for a huge 90KW inverter!

Max 5 units for one phase, and 15 units for three phases

R

S

T

18KW 3-Phase AC Load Systems

6KW 1-Phase AC Load Systems

CP-6000-48 x 3 pcs

With 3-phase connection package

L N

L N

R – S – T : 18KW 3-Phase

R – N : 6KW 1-Phase

S – N : 6KW 1-Phase

T – N : 6KW 1-Phase

L N

N

18KW 3-Phase AC Load Systems

Renewable Energy as Priority

Grid power is used only when the batteries are over discharged or the sufficient solar energy is not available from the PV array.

If PV power is available it should be directed to the load and the excess power will be used for charging the batteries.

18KW 3-Phase AC Load Systems

Please setup the CombiPlus into Mode 3

First, the battery bank is charged from renewable energy when you use the enough PV array or other renewable energy, not from grid power.

Second, please setup the L.V.D. (Low Voltage Detection)

Third, when the battery bank reaches the L.V.D., the grid power will charge it by AC/DC charger which is included on the

CombiPlus.

Fourth, concurrently the grid power will supply electricity to

AC loads by ATS which is included on the CombiPlus.

UP to 90Kw System

If the CombiPlus inverter/charger has to connect with

PV modules and wind turbines, you have to procure

MPPT chargers because the battery can be charged from grid power, diesel generator, solar PV modules and wind energy.