A30-20101025-004r3 TSGA WG3 chair e1xCSFB MT HHO

advertisement
•
•
•
•
•
•
•
TSG-A WG3
TITLE: TSG-A.3 Discussion Point
SOURCE:
Scott Marin, s.marin@motorola.com, WG3 acting chair
ABSTRACT: This contributions presents discussion points for the Joint TSG-C/A
meeting in Tampa regarding Mobile Terminated eCSFB requiring hard handoff via the
MSC.
This contribution supersedes A30-20101012-024r1 TSGA WG3 chair e1xCSFB MT
HHO discussion points.ppt.
RECOMMENDATION: Approve for presentation at the Joint TSG-C/A meeting.
Motorola grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any
modifications thereof in the creation of 3GPP2 publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even
though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such
contribution or the resulting Organizational Partner's standards publication. Motorola is also willing to grant licenses under such contributor copyrights to third parties on
reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner’s standard which incorporates this contribution.
This document has been prepared by the Motorola to assist the development of specifications by 3GPP2. It is proposed to the Committee as a basis for discussion and is not to
be construed as a binding proposal on Motorola. Motorola specifically reserves the right to amend or modify the material contained herein and to any intellectual property
of Motorola other than provided in the copyright statement above.
MT eCSFB call delivery with CPN
Options proposed for Calling Party Number Presentation (CPNP). Note: Calling Party
Number (CPN), Calling Party Information (CPI), and Calling Party Number
Presentation mean the same thing the following contributions:
•
Ericsson, -- CPN shown while on LTE, call accepted/rejected, requires General Page
Message (GPM), CPN, Signal sent before Page Response on LTE (three options).
–
•
Huawei – CPN delivered on LTE and shown when UE is in LTE. Bundling not used.
–
•
A30-20101025-013r0-HW LTE-1xRTT eCSFB MT Call procedure.doc
CTC/ZTE/QC – CPN transmitted when UE is in LTE, but presented to UE after
moving 1x Traffic Channel (TCH). Bundles UHDM+AWI.
–
•
A30-20101025-010r0 [E] eCSFB Call termination.doc
A30-20100913-015r1_CTC_QC_ZTE_e1xCSFB MT call with call accepted for standalone
IWS(UHDM+AWI).doc
ALU/Mot/QC/KDDI/NEC/Hitachi – CPN forwarded in the HO messages to the target
1xBS. Bundling not used.
–
A30-20101025-005r0 ALU Mot QC KDDI NEC Hit eCSFB MT Call flow procedure IWS-1xBS
with HO.doc
TSG-A is considering standardizing one or more solutions.
MT eCSFB call delivery with CPN -Ericsson
•
•
Figuress x.x.2 and x.x.3 from A3020101025-010r0 [E] eCSFB Call
termination.doc
IWS/BS or
. MS / UE
Standalone
eNB
MME
IWS
MS / UE
eNB
Standalone
IWS
MME
1 x BS
MSC
time
TS 23.272 Figure B.2.3a.4-1 Steps 1-5
MS/UE is EUTRAN attached and registers with the MSC
a
The UE indicates that it supports enhanced 1xCSFB.
Paging Request (CPI)
b
Paging Request
c
d
See section discussing the three possible options
time
TS 23.272 Figure B.2.3a.4-1 Steps 6-9
T 3113
f
MS/UE performs Extended Service Request.
T 3113
Option 1
TS 23.272 Figure B.2.3a.4-1 Steps 10-15a
GCSNA (Page Response Message)
GCSNA ( GPM )
A21-1x air Interface
signalling message
A21-1x air Interface
signalling message
c
h
Assignment Request (CPI)
GCSNA( FNM (Calling Party Number, Signal ) )
A21-1x air Interface
signalling message
g
Complete L3 Info Paging Response
i
Assignment Complete
j
d
Handoff Required
k
HO Request
T7
-
HO Request Ack
l
m
Handoff Command
GCSNA (UHDM)
A21-1x air Interface
signalling message
Option 2
n
o
Handoff Commenced
p
GCSNA (GPM, FNM)
A21-1x air Interface
signalling message
c
TS 23.272 Figure B.2.3a.4-1 Steps 16
MS acquires 1x traffic channel over 1x radio
q
1x Handoff Complete Message
r
Handoff complete
T 306
Option 3
AWI (CPI)
Clear Command
GCSNA [CPN, Signal](GPM)
A21-1x air Interface
signalling message
Clear complete
c
s
t
u
T 315
v
1x Alert With Information Message (CPI)
w
1x Connect Order
x
Connect
y
MT eCSFB
call delivery
with CPN -Huawei
MS/UE
MME
GCSNA: GPM
GCSNA: Page Response
MSC
Paging Request
Paging Request
S102:A21-1x air interface signalling
message(GCSNA:GPM)
S102:A21-1x air interface signalling
message(GCSNA:PRM)
T3113
T3113
c
e
Assignment Complete
f
S102:A21-1x air interface signalling
message(GCSNA:CPN)
g
h
T301
S102:A21-1x air interface signalling
message(GCSNA:Connect)
i
Connect Order
j
Handoff Required
k
Handoff Request
Handoff
Request Ack
T7
GCSNA: UHDM
d
Assignment Request
MS/UE performs Extended Service Request
procedure in E-UTRAN as specified in 3GPP TS
23.272
GCSNA: Connect
S102:A21-1x air interface signalling
message(GCSNA:UHDM)
E-UTRAN releases S1 UE context and EPS bearer
is suspended as specified in 3GPP TS 23.272
T11
l
m
Handoff Command
n
Handoff Commenced
o
p
T9
q
1x Radio interface procedures to acquire 1x traffic channel
1x Handoff Complete message
time
a
b
Complete L3 Info:
Paging Response
1st
Figure from A3020101025-013r0-HW
LTE-1xRTT eCSFB MT
Call procedure.doc
1x BS
Tunneled Messaging
GCSNA: CPN
•
IWS
T306
r
Handoff complete
s
t
Clear Command
T315
Clear complete
u
UE/MS
MT eCSFB
call delivery
with CPN –
CTC, ZTE, QC
•
Fig x.x.-1 from
A30-20100913015r1_CTC_QC_Z
TE_e1xCSFB MT
call with call
accepted for
standalone
IWS(UHDM+AWI).
doc
eNB
MME
IWS
1xBS
MSC
time
Paging Request
a
Paging Request
S102: A21-1x air
interface signaling
GCSNA (GPM)
b
T3113
T3113
MS/UE performs Extended Service Request procedure in EUTRAN as specified in 3GPP TS 23.272
GCSNA (Paging Response)
c
S102: A21-1x air
interface signaling
d
Complete L3 Info:
Paging Response
e
T303
Assignment Request
f
Assignment Complete
T10
g
Handoff Required
h
Handoff Request
i
T7
HandoffRequestAck
T11
j
HandoffCommand
GCSNA (UHDM+AlertWithInfo)
k
S102: A21-1x air
interface signaling
l
HandoffCommenced
m
E-UTRAN releases S1 Context and EPS
bear is suspended as specified in 3GPP
TS 23.272
1x traffic channel acquire
T9
T301
n
T306
o
1x Handoff Complete
p
HandoffComplete
q
ClearCommand
r
ClearComplete
T315
s
ConnectOrder
t
Connect
u
MT eCSFB
call delivery
with CPN –
ALU, QC, Mot,
KDDI, NEC,
Hitachi
•
•
Figure xx from
A30-20100913029BR2 eCSFB
MT Call flow
procedure IWS1xBS with
HO.doc
KDDI, NEC,
Hitachi have cosigned A3020101025-005r0,
which updates to
29Br2.
MS/UE
eNB
MME
IWS-1xBS
Target BS
MSC
a
MS/UE is E-UTRAN attached and registers with the MSC. The UE indicates that it supports e1xCSFB.
Paging Request
GCSN: GPM
b
S102: A21-1x air interface
signalling message
(GCSNA: GPM)
c
T3113
UE performs Extended Service Request procedure
as shown in 3GPP TS 23.272
GCSNA: Page Response message
S102: A21-1x air interface
signalling message
(GCSNA: Page Response
message)
d
e
Complete L3 Info:
Paging Response
T303
f
Assignment Request (CPI)
g
T10
Assignment Complete
h
Handoff Required (CPI)
i
HO Request (CPI)
Handoff
Request Ack
T7
GCSNA (UHDM)
time
T306
j
k
Handoff Command
l
Handoff Commenced
m
n
A21-1x air interface
signalling message
E-UTRAN releases S1 UE context and EPS bear is
suspended as shown in 3GPP TS 23.272
T11
T9
o
T301
1x Radio interface procedures to acquire 1x traffic channel
p
1x Handoff Complete message
q
Handoff Complete
r
s
Clear Command
T315
Clear Complete
1x Alert With Information Message (CPI)
t
u
1x Connect Order
v
Connect
w
MT eCSFB
call delivery
with CPN –
Non
functional
composite of
proposals
MS/UE
IWSsource1xBS
MME
Target
1xBS
MSC
a
MS/UE is E-UTRAN attached and registers with the MSC. The UE indicates that it supports e1xCSFB.
Paging Request (CPI)
Paging Request
GCSNA (GPM)
b
c
A21-1x air interface
signalling message
Ericsson*
GCSNA(Feature Notification Message (CPI))
T3113
T3113
MS/ UE does ESR. MME does tunnel
redirection as in TS 3GPP 23.272
d
GCSNA (Page Response message)
e
A21-1x air interface
signalling message
This figure is Huawei**
not a call flow
for ease in
undertandingCTC,ZTE,QC
key
differences
between the
options
Complete L3 Info:
Paging Response
f
Assignment Request (CPI)
g
Assignment Complete
h
GCSNA(CPI)
Handoff Required (CPI)
ALU,QC, Mot, KDDI, NEC, Hit
T7
i
j
HO Request (CPI)
Handoff
Request Ack
k
l
Handoff Command
GCSNA (UHDM + 1xAWI (CPI))
m
A21-1x air interface
signalling message
n
Handoff Commenced
T301
1x Radio interface procedures to acquire 1x traffic channel
1x Handoff Complete message
T9
o
T11
T306
p
Handoff complete
AWI (CPI)
Clear Command
ZTE
q
r
s
T315
Clear complete
t
ALU,QC, Mot, KDDI, NEC, Hit
1x Alert With Information Message (CPI)
1x Connect Order
Notes: * Step u still occurs in Ericsson scheme leading to “double alerting”
** Step u does not occur in the Huawei, ZTE schemes
u
v
Connect
w
Summary of Potential Impacts to
TSG-C for MT eCSFB w/HHO
• Ericsson proposals
– C.S0097 might be affected, but can present CPN and signal to
user when UE is in LTE
– UE impact and changes to C.S0097 (depending on Option).
• Huawei proposals
– C.S0097 affected but can present CPN when UE is in LTE
– No bundling
• CTC/ZTE/QC sends AWI with UHDM in bundled GCSNA.
– C.S0097 impact and bundles
• ALU/QC/Mot/KDDI/NEC/HIT CPI in Handoff messages.
– supports C.S0097-0 v1.0 (a.k.a. GCSNA 1.0)
– No UE impact. No Bundling.
Download