TOSHIBA Variable Refrigerant Flow Modular Multi 8-46hp capacity 40 indoor units inverter control energy efficiency compactness flexible design phased installation piping design program performance data retrieval . 10hp (28kW) – inverter driven 10hp (28kW) – fixed speed 8hp (22.4kW) – inverter driven 8hp (22.4kW) – fixed speed 6hp (16kW) – fixed speed . . 8-46hp capacity Cooling capacity from 8hp . . . . . 13 (maximum) 8hp Inv connected to ….. Cooling Connected hp Capacity (nominal) (maximum) 10.8hp 22.4kw 8-46hp capacity up to 46hp . . . . . . . . 40 (maximum) 10hp 10hp 10hp 8hp 8hp Inv Fix Fix Fix Fix Cooling Connected Capacity hp (nominal) (maximum) 128.8kw 62.1hp Maximum connected horsepower? The selected capacity of indoor units may exceed the horsepower of the outdoor unit(s) by a maximum ratio of 1 to 1.35 or135% MMS indoor unit PCB – capacity adjustment SW08 Capacity adjustment Capacity code (horsepower) SW 08 ON ON ON ON 0.50 OFF OFF OFF OFF 1 2 3 4 from . . . . . . . Indoor unit capacity 1.40kW Capacity adjustment Capacity code (horsepower) SW 08 ON ON ON ON 5.00 OFF OFF OFF OFF 1 2 3 4 Indoor unit capacity to . . . . . . . 14.00kW Indoor unit range and capacities 2 . 15 2 MM-U56 4-way cassette 2 way cassette 1 1 MM-TU28 MM-TU42 3 MM-U80 Duct Ceiling Wall Low wall Chassis 1 MM-N28 5 MM-U140 MM-TU56 MM-SB28 Slim duct 4 MM-U112 2 . 15 2 . 15 2 2 . 15 2 3 3 3 3 3 4 4 5 5 MM-B56 MM-B80 MM-B112 MM-B140 MM-C42 MM-C56 MM-C80 MM-C112 MM-C140 MM-K42 MM-K56 MM-K80 MM-S56 MM-S80 MM-N56 MM-N80 MM-N42 Inverter control + energy efficiency inverter speed increases and is controlled to meet demand 100% 50% 54% Fixed speed . . . fixed speed compressor starts Inverter 4% Inverter compressor starts at 4% . . . . and if demand is 50% or greater runs up to full speed (or less if demand is >50%) if demand is still greater than 50% inverter slows to 4% capacity and . . . 2 in 1 compressor Motor terminals Windings thermostat terminals Discharge pipe Discharge pipe Compressor scroll Fixed speed compressor motor Inverter compressor motor Oil reservoir Crankcase heater in fixed speed models Inverter control + energy efficiency Indoor unit – cooling mode Temperature sensors Refrigerant pipe connections Pulsed modulating valve Pressure sensor Inverter control + PMV (Pulsed Modulating Valve) energy efficiency Maintains suction superheat at 6º Temperature sensor measures suction gas temperature Pressure sensor measures refrigerant pressure and converts it to saturated (evaporating) temperature Suction gas temperature minus evaporating temperature equals superheat High superheat – PMV opens Low superheat – PMV closes Inverter control + energy efficiency Pulsed Modulating Valves Fully open in cooling mode Modulating in heating mode (for superheat control) Outdoor unit – heating mode Compact Typical 30hp installation Actual footprint = 2.38m2 Total weight 270 x 3 = 810kgs (incl. servicing area = 4.82m2) New bell mouth design Intelligent Power Drive Unit (IPDU) 2 in 1 Compressor System maintenance slider New fan design 4 way air inlet design Separate housing for coil and mechanical assemblies Suction accumulator Pulsed Modulating Valves Noise level at maximum speed ………. 56 db(A) 50 db(A) 42 db(A) 10m 2m 4m ……… one of the quietest VRF units on the market Easy to install Single gas & liquid pipes Oil balance pipe = 3/8” T Joint Y Joint Sized for the total capacity downstream Capped for future use Header Flexible design Maximum lift between outdoor and indoor units Maximum vertical separation between indoor units 30m 50m (outdoor higher) Longest single pipe run 30m 100m 250m Maximum total pipe run (outdoor lower) Phased installation 1st. branch after outdoor units XX Shutoff valves X X X X X X Shutoff valves Note: Size pipework to take account of future units Refrigeration circuits PD •Outdoor fan control (INV) •Stops compressor 1 @ 384 psig •Stops compressor 2 @ 399 psig •Locks out system @ 406 psig Outdoor fan •Controlled by PD TE •Outdoor fan control (FIX) •Defrost control HP SW (both) •Locks system @ 479 psig PS •Locks out system @ 3 psig TOSHIBA Capacity control PMV •Flow control through indoor unit SV42 •Balances prior to compressor 2 starting PMV3 •Evaporator bypass •TD1/2 > 110ºC •TS > 20ºC SV2 •Balance during off cycle TOSHIBA Cooling cycle PMV 1 & 2 •Fully open TE •Controls FIX outdoor fans PG •Provides saturation condition for superheat control PD •Controls INV outdoor fans Reversing valve •De-energised TOSHIBA Heating cycle PD •INV outdoor fan control PMV 1 & 2 •Refrigerant flow control into evaporator TE •FIX outdoor fan control Reversing valve •Energised – except at defrost PS •Provides saturation condition for superheat control Modular Multi System – Oil Management SV3C Pressurises oil management system TK1 Monitors flow of discharge vapour TK3 Monitors oil dilution At the start of an oil check a record is made of the temperature at TK1, TK2 & TK3 for reference TK2 - Monitors flow of oil out of oil vessel SV2 – (if in cooling mode) Adds hot gas to c/case if: TK3 < 2ºC Fan speed <20% SV3A Adds oil to balance pipe Modular Multi System – Oil Management Toshiba has developed an oil management system for its Modular Multi outdoor units which ensures that each compressor within the Modular Multi system operates with the optimum oil charge thus increasing compressor reliability and operating efficiency. The oil management system is time-controlled. The first check is carried out after one hour’s operation and every 30 minutes thereafter assuming that a satisfactory oil level has been determined. The temperatures measured by sensors TK1, TK2 and TK3 are stored for reference . Modular Multi System – Oil Management When an oil check is initiated solenoid valve SV3C is energised (opened) for 15 seconds and hot (discharge) gas flows towards the oil tank past sensor TK1 Solenoid valve SV3A is energised allowing oil to flow past sensor TK2 into the compressor suction pipe. If the temperature measured at TK2 is less than that measured at TK1 it is assumed that the oil tank (and therefore the compressor) contains sufficient oil and the oil check is terminated. If the temperature measured at TK2 is the same as that measured at TK1 it is assumed that the oil tank - and therefore the compressor- is empty. . Modular Multi System – Oil Management If the tank is empty an ‘A1’ judgement is made. An ‘A0’ judgement is made if the tank contains sufficient oil. [Refer to Page 105 of the Service Manual for further details.] In the case of an ‘A1’ judgement the system does not lock out but reschedules the next oil check after 5 minutes. If, during this 10minute period the low oil level indication self-cancels, the system will continue to operate and carry out the next oil level check after 30 minutes. If the ‘A1’ judgement remains for a further 17 x 5 minute cycles the system will shut down and a D7 fault code will be displayed at the faulty outdoor unit. . Modular Multi System – Oil Management Solenoid valve SV3A on the unit from which oil is to be recovered and solenoid valve SV3B on the unit which is demanding oil are both energised for 15 seconds allowing oil at discharge pressure to pass from the donor unit into the suction pipe of the recipient unit. If there is no other unit from which oil can be recovered the unit indicating a low oil level will shut down. . Modular Multi Piping Design Program Piping Design Program A program designed for . . . . . . . . . . System selection Pipework configurations Branch kit selection Refrigerant charge calculations Job pricing . Piping Design Program Click on the appropriate button . . . . . . Piping Design Program Piping Design Program Piping Design Program Piping Design Program Piping Design Program Piping Design Program Piping Design Program Piping Design Program Piping Design Program Piping Design Program Piping Design Program Piping Design Program . . . . . . . a working example What are the ‘rules’ for installation? Installation rules All pipes must be of refrigeration quality, hard-drawn or soft copper All copper used must be new and previously unused Pipes must be cut using a pipe cutter – not a hacksaw! Installation rules All cut pipe lengths must be capped after use If in doubt over pipe quality – don’t use it! Installation rules All pipework must be adequately supported and joints not under stress Oxygen-free nitrogen MUST be passed through pipework during brazing All interconnecting pipework should be tested to 10bar using OFN and tested for leaks Installation rules Following the detection and repair of any leaks, pressurise pipework to 30bar with OFN Leave this pressure in the system for at least four hours, recording the pressure and ambient temperature at the start of the test After at least four hours check and record the pressure and ambient temperature and note any pressure loss. Installation rules Following the detection and repair of any leaks evacuate system to remove any remaining moisture After at least two hours evacuation (depending on ambient conditions) start adding the additional refrigerant require for the system Ensure that the refrigerant (R407C ONLY) is charge into the system in its liquid phase – into the liquid line Installation rules Once the system pressure has equalised open the unit’s service valves and operate the unit to draw in the remaining charge through the unit’s suction valve. REMEMBER – the refrigerant must be weighed into the system and MUST be R.407C Why must refrigerant R407C be charged as a liquid? 23% R32 25% R125 52% R134a If charged as vapour only the high pressure refrigerant at the top of the cylinder will be drawn into the system TOSHIBA Variable Refrigerant Flow