DIRECT FIXED COST ESTIMATES ESTIMATE METHODS FOR AUXILIARIES AND SPECIFIC COMPONENTS AUXILIARY FACTILITIES • AS LISTED IN THE TEXT: GENERAL CATEGORIES • PLANT UTILITY SYSTEMS – – – – – • STEAM WATER http://www.syska.com/ AIR Energy/images/StPOWER Joes-Boiler-plnt.jpg NATURAL GAS MINOR UTILITIES – – • FIRE SYSTEMS INERT GASES WASTE DISPOSAL – – • SEWERS HAZARDOUS MATERIAL TREATMENT SYSTEMS DISTRIBUTION & TRANSPORTATION SYSTEMS – – – ROADS RAILS DOCKS http://www.smvrhm.org/2misc/un k-boxcar-loading.jpg ESTIMATE FACTORS • DEPEND ON TYPE OF FACILITY AUXILIARY PROCESSES CAN BE COMPLICATED • EXAMPLE OF WASTE TREATMENT PROCESS PIPING SYSTEM COST ESTIMATES • • ESTIMATES DEPEND ON FOLLOWING FACTORS TYPE OF SYSTEM • • • • • http://www.welcoser WELDED vices.com/pic3b.jpg SCREWED SWAGED FLANGES WELDED FLANGES MATERIALS OF CONSTRUCTION – SEE TABLE 12-2 FOR ALTERNATE TYPES PIPING DESIGN CRITERIA • MAXIMUM VELOCITIES – – • DIAMETER IS GENERALLY SET TO MEET PROJECT CRITERIA SEE TABLE 12.3 AND NOTE LIMITS AS A FUNCTION OF VISCOSITY SPECIFIED PRESSURE DROP (SEE MEMO CTA-02) – – – USE SPECIFIC EQUATIONS FOR LAMINAR, TURBULENT, COMPRESSIBLE AND INCOMPRESSIBLE FLOW. CHOOSE MORE CONSERVATIVE (LARGER DIAMETER) WHEN COMPARING RESULTS FROM VARIOUS MODELS AVOID SONIC VELOCITY (VALVES ARE PRIMARY SOURCES) OTHER CONSTRAINTS • CODES – ASME B31.3 – PROCESS PLANT PIPING – ASME B31.1 – STEAM PIPING SYSTEM CURVES • PRESSURE DROP IN FLUID FLOW LINES (TOTAL HEAD) – USING EQUIVALENT LENGTHS REQUIRE SOME IDEA OF THE ROUTING. – FACTORS IN CRANE OR CAMERON. www.fluidedesign.com/downlo ad-free/chapter4-extract.pdf PIPING INSTALLATION OPTIONS • OVERHEAD PIPING SYSTEMS ARE EASIER TO MAINTAIN – – – – RUN PIPING IN RACKS MINIMUM SIZE IS GENERALLY 2"(NOM) TO ALLOW REASONABLE SPAN OF ABOUT 25 FT RACK PIPING LAYOUT SHOULD ISOLATE INCOMPATIBALE MATERIALS USE STRUCTURAL STEEL IN BUILDINGS http://www.sococo.co.uk/petro-chemical.htm SUBSURFACE PIPING • GENERALY LOCATED IN TRENCHES – – – – • DOES NOT INTERFERE WITH MOST SURFACE OPTIONS CAN LIMIT SPREAD OF LEAKS WHEN FLUIDS FLOW INTO TRENCHES TRENCHES MUST BE PERIODICALLY DRAINED HAVE MIXED EFFECTS IN FIRES MANY PLANTS HAVE A COMBINATION OF OVERHEAD AND SUBSURFACE PIPING http://www.nasm.si.edu/udvarhazy/bts/go od_place/hazy_4.jpg DETAILED PIPING DESIGN FACTORS • • • • ATTEMPT TO MAINTAIN CONSTANT VELOCITIES THROUGH SYSTEMS FOR PURPOSES OF EFFICIENCY USE WELDED WHERE LEAKS OF HAZARDOUS MATERIALS WOULD BE POSSIBLE FLANGED FITTINGS ARE USED WHERE LINES MIGHT BE FREQUENTLY OPENED FOR MAINTENANCE LINES 2-3"(NOM) IN DIAMETER MAY BE RUN IN THE FIELD. LARGER SHOULD BE FABRICATED IN SHOP. PIPING QUALITY CHECKS • RADIOGRAPHY REQUIREMENTS – – – • RANGE FROM 0% ON LOW RISK SYSTEMS TO 100% ON HIGH RISK 5% RANDOM A TYPICAL INTERMEDIATE VALUE. THERMAL AND MECHANICAL STRESS CONSIDERATIONS EXPANSION MUST BE CONSIDERED AND SYSTEMS DESIGNED TO HAVE ZERO STRESS ON EQUIPMENT NOZZLES – – – NPSH MAY BE A FACTOR WHEN DESIGN FOR PUMP INLETS. SEE PERRY'S FOR GUIDELINES AVOID VAPOR TRAPS IN EQUIPMENT PIPING CONTROL VALVES SHOULD BE ISOLATED TO ALLOW REMOVAL FOR MAINTENANCE WITHOUT SHUTTING DOWN THE SYSTEM VALVE DESIGN CRITERIA • DEPEND ON MEDIA AND SERVICE – – – POSITIVE SHUTOFF - GATES, PLUG, BALL GASES - GATES FOR SHUTOFF, BUTTERFLYS FOR THROTTLING CHECK VALVES - PREVENT BACKFLOW AND SHOULD BE INSTALLED AFTER ROTATING EQUIPMENT http://www.valvediagno stics.com/media/pictur s/gate.gif http://www.offshore247.com/n ews/article.asp?Id=3226 http://www.valvediagnostics.c om/media/pictures/check.gif RELATIVE COSTS FOR PIPING • • • SEE FIGURES 12-4 THROUGH 12-12 PIPING COSTS ARE LOWEST FOR SCREWED PIPING, BUT THIS IS GENERALLY LIMITED TO 6” DIAMETER OR LESS STRAIGHT RUN PIPE IS GENERALLY FIELD FABRICATED IN 20 FT SECTIONS – – AUTOMATIC WELDING MACHINES FOR FIELD INSTALLATIONS ARE AVAILABLE FOR STRAIGHT RUNS SCREWED CONNECTIONS CAN ALSO BE INSTALLED IN LONGER SECTIONS OTHER PIPING COST FACTORS • • • PIPE WITH BENDS, FITTINGS, VALVES, MULTIPLE CONNECTIONS IS TYPICALLY FABRICATED IN A SHOP THE SHOP CAN BE LOCATED IN THE FIELD FOR PIPE UNDER 1 FT IN DIAMETER LARGE PIPE FABRICATIONS ARE COMPLETE IN A SHOP WITH AUTOMATED WELDERS http://home.iprimus.com.au/jackd og/lockseam22.jpg http://www.alibaba.com/cata log/11115924/Quality_Pipe_ Fittings_Elbow_Bend_Tee_ Flange_Reducer.html SPECIFIC EXAMPLE Cl2 PLANTS PRODUCTION ECONOMICS FOR DIAPHRAGM Cl2 Cl2 Capacity Cl2 Production ST/Y ST/Y 275000 275000 450000 450000 Investment ($US millions) Battery Limits 208 Off-Sites 100 Total Fixed Capital 308 1100000 1100000 330 158 487 662 317 978 PRODUCTION ECONOMICS FOR MEMBRANE Cl2 Cl2 Capacity Cl2 Production ST/Y ST/Y 250000 250000 450000 450000 Investment ($US millions) Battery Limits 221 Off-Sites 93 Total Fixed Capital 314 DATA FROM T. PAVONE 350 148 497 1100000 1100000 702 297 999