Office of Facilities and Grounds UH Manoa Faculty Senate January 2012 1. Upcoming Projects 2. Campus Space Analysis 3. Campus Energy Report 6 April 2015 UHM Office of Facilities and Grounds 1 Office of Facilities and Grounds Some Facility Definitions 6 April 2015 Term Definition AIM The computerized Work Order maintenance management and space management system used to track work orders and manage available campus space CRDM Capital Renewal and Deferred Maintenance – The amount of capital dollars needed to repair the backlog of deferred maintenance and a forecast of future required capital maintenance needs FCA Facilities Condition Assessment – A physical assessment of the actual condition of campus buildings used to validate life-cycle models FRRM Facilities Renewal and Resources Model – A computerized life-cycle modeling system for tracking and forecasting campus capital requirements GF General Funded Buildings (i.e. Classrooms, Lab, Offices, etc.) GSF Gross Square Feet NASF Net Assignable Square Feet – The space you can actually assign to an activity (i.e. Classroom, Lab, Office, etc.) PM and RM Preventative Maintenance and Reactive (Repair) Maintenance UHM Office of Facilities and Grounds 2 Office of Facilities and Grounds Upcoming Projects (March 2012 – August 2013) Edmondson Hall Gartley Hall, Structrual Retrofit and Renovation Campus Lighting Upgrades - Design/Build RFP Clarence T.C. Ching Athletic Complex Art, Biomed, Kennedy, Moore, Sakamaki, St. Johns Hamilton Library Phase 2 - R/R Central Plant Sys, HVAC Biomedical Sciences Bldg, Stabilization Improvements Various Buildings, Elevator Modernization Phase I Women's Locker Room & Nagatani Academic Center HPER/A - Upgrades to HVAC, plumbing, equipment, Biomed R/R HVAC Equip, Reheat h2o sys, bldg air bal & Loop D - Extend secondary piping, R/R Central Plant Sys Stan Sheriff Center, R/R HVAC Equipment, and Bilger Addition, R/R HVAC - Central Plant Equipment Bilger Hall - General Mechanical Repairs & Upgades to Coconut Island, Code & Safety Improvements - Marine Art Building, Electrical Distribution System Music Complex, R/R bldg HVAC equipment & controls Queen Liliuokalani Student Svcs Center, General exterior 6 April 2015 15,000,000 12,500,000 10,000,000 8,697,941 5,500,000 4,500,000 4,230,000 4,100,000 3,863,500 3,751,752 3,400,000 2,987,966 2,500,000 2,100,000 2,083,000 2,054,000 1,993,000 1,800,000 1,650,000 Kennedy Theatre, Repaint/Repair Exterior 782,000 Auxiliary Services Building, Health Services Building, and 728,000 Upgrade Metering, Phase I 700,000 Marine Sciences Building, Repaint/Repair Exterior 661,000 Watanabe Hall, General Repairs and Repainting 554,000 Pope Laboratory (Head House) Reroof 525,000 Shidler College of Business (SCBA), Electrical Distribution 525,000 Everly Hall, Reroof 390,000 PRI Building #1 Reroof 380,000 Holmes Hall, Upgrade Lighting 349,000 Law School & Law Library Reroof 340,000 Fire Safety Improvements -- Music Complex, Replace Fire 300,000 Keller Hall, Electrical Distribution System Improvements 250,000 George Hall, Electrical Distribution System 218,000 Lyon Arboretum Cottage Demolition 200,000 Institute for Astronomy, Replace Fire Alarm System 164,000 Architecture Building, Lighting Upgrades 120,000 Spaulding Hall, Lighting Upgrade 104,000 TOTAL CONSTRUCTION 102,301,159 UHM Office of Facilities and Grounds 3 Office of Facilities and Grounds How Projects Are Created Annually UH System Issues a Capital Renewal Report based on OFG Inputs BOR Legislature UH System CFPB Review Facilities Prioritizes Project List 6 April 2015 UHM Office of Facilities and Grounds 4 Office of Facilities and Grounds Campus Space Analysis Update 6 April 2015 UHM Office of Facilities and Grounds 5 Office of Facilities and Grounds Overview • Goal to provide an accurate management tool for space management and space costing • Sources of information for the creation of data sets: – Space • AIM Space Management Data – Annualized 10-year CRDM Requirement • FRRM and FCA – Annual PM, RM, Materials and Electrical Expenses • FCA, AIM Actual, and imputed for null data • Labor Cost data based on external shop rates 6 April 2015 UHM Office of Facilities and Grounds 6 Office of Facilities and Grounds Status • AIM Space Survey 90% complete – – – – 188 GF buildings 8,245 individual spaces 3.8 million GF Net Assignable Square Feet (NASF) Major challenges to keep current • We can now report Net Assignable Square Feet by type, building, and room • Building Cost Data set 90% complete • We have now have the ability to understand expenses by individual building GSF 6 April 2015 UHM Office of Facilities and Grounds 7 Office of Facilities and Grounds The Top 80% of all GF NASF Uses OFFICE RESEARCH/NONCLASS LABORATORY STACK CLASSROOM CLASSROOM LABORATORY ATHLETIC FACILITIES SPECTATOR SEATING OFFICE SERVICE CENTRAL STORAGE RESEARCH/NONCLASS LABORATORY SERVICE CONFERENCE ROOM ATHLETIC OR PHYSICAL EDUCATION SHOP SLEEP AND STUDY WITH TOILET OR BATH OPEN LABORATORY ATHLETIC OR PHYSICAL EDUCATION SERVICE GREENHOUSE CENTRAL COMPUTER OR TELECOMMUNICATIONS TOTAL 6 April 2015 UHM Office of Facilities and Grounds 1,121,305.37 28.23% 478,853.35 12.05% 277,604.37 6.99% 225,761.43 5.68% 166,855.50 4.20% 134,255.96 3.38% 123,446.03 3.11% 117,550.89 2.96% 95,303.31 2.40% 80,225.13 2.02% 68,360.68 1.72% 65,036.47 1.64% 51,014.70 1.28% 46,805.78 1.18% 43,297.06 1.09% 42,873.29 1.08% 31,272.73 0.79% 3,169,822.04 79.79% 8 Office of Facilities and Grounds Classrooms CLASSROOMS Kuykendall Hall Shidler College of Business Moore Hall Webster Hall Law School Art Building Bilger Hall Architecture Building Keller Hall Saunders Hall Biomedical Sciences Building George Hall Sakamaki Hall 6 April 2015 COUNT UHM Office of Facilities and Grounds NASF 27 22 38 12 11 8 5 7 11 11 9 8 16 20,357 19,756 14,192 10,079 9,415 8,915 8,531 8,361 8,135 7,669 7,596 6,490 6,354 9 Office of Facilities and Grounds Building Data • There are 212 Total GF On-Campus Buildings comprising 4.6 M GSF • 51 GF Buildings have actual electricity data – 69% of the GSF and 80% of the kWh used on-campus • 58 GF Buildings have FCA PM cost data • 139 GF Buildings have AIM RM cost data • By employing linear approximation for the buildings without PM and electricity data we created a list of 139 GF Buildings (4.4 M GSF 90% of Operating Costs) joined with CRDM to create an annual cost per GSF per building 6 April 2015 UHM Office of Facilities and Grounds 10 Office of Facilities and Grounds Ranked by Actual kWh bildingname Hamilton Library POST Holmes Hall Biomedical Sciences St. John Laboratory Complex Bilger Addition Agricultural Sciences HIG Saunders Hall HPER Campus Center Keller Hall Astronomy 6 April 2015 fy2011__kWh annual_elect_exp 12,417,350 3,476,858 8,361,600 2,341,248 6,861,120 1,921,114 6,626,850 1,855,518 5,084,800 1,423,744 5,027,800 1,407,784 3,018,413 845,156 2,961,920 829,338 2,886,125 808,115 2,514,000 703,920 2,357,600 660,128 2,324,310 650,807 2,231,400 624,792 UHM Office of Facilities and Grounds % 11.9% 8.0% 6.6% 6.3% 4.9% 4.8% 2.9% 2.8% 2.8% 2.4% 2.3% 2.2% 2.1% 11 Office of Facilities and Grounds Ranked by Total Cost per GSF buildingname Snyder Hall Holmes Hall St. John Laboratory Complex Bilger Addition Biomedical Sciences Building Environmental Health and Safety Office 3-Dive Safety Pacific Ocean Science & Technology (POST) Keller Hall Hawaii Institute of Geophysics Marine Sciences Building Wist Hall Watanabe Hall Sherman Laboratory Pacific Biomedical Research Center (PBRC) Physical Science Building Krauss Hall University Avenue #4 Army ROTC #3 Softball Field - Restroom Facilities Fiscal Services (Financial Management Office) Agricultural Engineering Institute Bachman Annex #9 6 April 2015 gsf 18,030 88,546 125,796 73,330 184,592 528 225,000 49,143 126,708 95,500 24,591 66,167 49,042 16,294 42,873 1,540 1,540 1,400 735 1,303 15,689 1,700 total_Ops 495,435 2,281,941 1,820,105 1,701,517 2,453,790 13,665 2,957,952 811,112 1,118,073 940,390 522,099 585,797 547,892 134,971 608,954 29,312 29,312 25,954 12,635 21,953 133,066 25,743 UHM Office of Facilities and Grounds annual_crdm total_annual 433,995 929,431 1,903,768 4,185,709 2,877,780 4,697,884 987,596 2,689,113 4,111,695 6,565,485 3,110 16,776 4,167,663 7,125,615 655,270 1,466,382 2,523,760 3,641,833 1,796,685 2,737,075 181,725 703,824 1,289,032 1,874,829 841,697 1,389,588 295,792 430,763 510,367 1,119,321 9,071 38,383 9,071 38,383 8,247 34,200 4,330 16,965 7,675 29,628 198,695 331,761 10,014 35,757 per_gsf 51.55 47.27 37.35 36.67 35.57 31.77 31.67 29.84 28.74 28.66 28.62 28.33 28.33 26.44 26.11 24.92 24.92 24.43 23.08 22.74 21.15 21.03 12 Office of Facilities and Grounds Ranked by Total Cost per NASF Campus Average $2.71 Building Annual OpEx Softball Field - Restroom Facilities Lab School Lockers (University High School Lockers) Multipurpose Bldg. (Univ. High) St. John Laboratory Complex Bilger Addition Biomedical Sciences Building Hawaii Institute of Geophysics Watanabe Hall Environmental Health and Safety Office 3-Dive Safety Pacific Ocean Science & Technology (POST) Sherman Laboratory Keller Hall Korean Studies, Center for Speech Pathology/Audio Laboratory Marine Sciences Building Holmes Hall Agricultural Science Facility Art Building Wist Hall Law School 6 April 2015 Annual CapEx 12,635 27,474 70,984 1,820,105 1,701,517 2,453,790 1,118,073 585,797 13,665 2,957,952 547,892 811,112 103,745 65,909 940,390 2,281,941 1,191,861 948,258 522,099 588,525 UHM Office of Facilities and Grounds 4,330 14,349 72,563 2,877,780 987,596 4,111,695 2,523,760 1,289,032 3,110 4,167,663 841,697 655,270 126,140 79,722 1,796,685 1,903,768 886,922 2,086,942 181,725 461,144 NASF 148 419 2,231 74,281 47,065 116,308 64,560 36,603 341 150,321 29,999 31,989 5,091 3,234 61,699 95,318 47,883 70,132 16,656 24,882 Monthly Cost/NASF 9.57 8.33 5.36 5.27 4.76 4.70 4.70 4.27 4.10 3.95 3.86 3.82 3.76 3.75 3.70 3.66 3.62 3.61 3.52 3.52 13 Office of Facilities and Grounds Sustainability 6 April 2015 UHM Office of Facilities and Grounds 14 Office of Facilities and Grounds FY 2007 Energy Usage Reduction Plan Baseline Electrical Usage Baseline Annual kWh 2006 2007 2008 2009 2010 2011 2012 2013 2014 121,350,873 121,350,873 121,350,873 121,350,873 121,350,873 121,350,873 121,350,873 121,350,873 121,350,873 Engergy Program Savings kWh Mechanical Systems kWh Conservation kWh Perfornace Contracting kWh RCx kWh PV Systems kWh Tota Program Savings kWh Net Requirement kWh 8,500,000 9,000,000 12,400,000 13,000,000 2,000,000 15,200,000 15,000,000 6,000,000 2,000,000 800,000 1,000,000 24,800,000 17,000,000 8,000,000 8,000,000 2,000,000 2,000,000 37,000,000 19,000,000 8,000,000 12,000,000 2,000,000 2,000,000 43,000,000 21,000,000 8,000,000 16,000,000 2,000,000 2,000,000 49,000,000 23,000,000 8,000,000 20,000,000 2,000,000 4,000,000 57,000,000 112,850,873 112,350,873 108,950,873 106,150,873 96,550,873 84,350,873 78,350,873 72,350,873 64,350,873 12.4% 4.9% 1.6% 0.7% 0.8% 20.4% 14.0% 6.6% 6.6% 1.6% 1.6% 30.5% 15.7% 6.6% 9.9% 1.6% 1.6% 35.4% 17.3% 6.6% 13.2% 1.6% 1.6% 40.4% 19.0% 6.6% 16.5% 1.6% 3.3% 47.0% 200,000 8,500,000 9,000,000 12,400,000 Percent Reduction Targets Mechanical Upgrades Conservation Perfornace Contracting RCx PV Systems Total Reduction 7.0% 7.4% 0.0% 0.0% 0.0% 0.0% 7.4% 10.2% 0.0% 0.0% 0.0% 0.0% 10.2% 10.7% 1.6% 0.0% 0.2% 0.0% 12.5% © 2008 UHM Facilities Management 15 Office of Facilities and Grounds Sustainability Program: Energy Retrofits Art Building HVAC Replacement Bilger Addition Prelinary Repairs Bilger Hall, Mechanical Repairs, Upgrade Chilled Water sys. & controls BioMed, Laboratory Animal Services, HVAC System Upgrades Biomedical Sciences Bldg HVAC Repairs Coconut Island, HIMB, A/C and Misc. upgrades Campus Wide EMCS Upgrades - Phase 1 George Hall, Air conditioning and ventilation modifications Gilmore Hall HVAC Repairs - Phase 1 Hamilton Library IFA Manoa HVAC Repairs Kennedy Theatre HVAC Repairs Moore Hall HVAC - Phase 1 Moore Hall HVAC - Phase 2 Music Building Complex (Orvis) HVAC Repairs PE Athletic Complex Hot Water System Sakamaki Hall HVAC Replacement -Phase 1 and 2 SCBA Mechanical Repairs-Chilled Water Plant Improvements St. John Laboratory Complex HVAC Repairs Stan Sheriff Center HVAC Repairs Watanabe Hall HVAC Repairs Campus Wide Water Conservation Upgrades - Phase 1 TOTAL $5,035,130 $7,909,125 $119,883 $90,253 $3,856,000 $3,650,000 $804,543 $34,686 $2,742,802 $7,576,079 $541,000 $228,000 $466,000 $2,117,187 $840,000 $10,776 $5,688,220 $2,683,246 $695,000 $1,297,000 $2,612,672 $1,099,941 $50,097,543 Over 20 Projects Implemented since FY2008 Office of Facilities and Grounds Sustainability Program: Distributed Chill Water Loops • The key success factor has been UHM designed chill-water “Smart Water” Systems that permits the sharing of interconnected building chill-water plants so that on cooler days a single building chill water system – operating at higher efficiency – can provide chill water to multiple buildings Office of Facilities and Grounds Energy Usage and Expense Trends 1Q FY2008 – 1Q FY2012 140,000,000 $0.60 120,000,000 $0.50 100,000,000 $0.40 80,000,000 $0.30 Annual Net U sage kWh 60,000,000 Annual Exp ense Average C ost/kWh $0.20 40,000,000 $0.10 20,000,000 - $0.00 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 6 April 2015 © 2008 UHM Facilities Management 18 Office of Facilities and Grounds Mānoa Campus Energy Sustainability Program GF Total usage has decreased 13.5% Total Campus usage has decreased 9.4% Office of Facilities and Grounds Annual Mānoa Campus Energy Expenses FY2007 Classrooms, Labs, and Athletics FY2008 FY2009 FY2010 $16,313,577 $19,006,153 $18,999,335 $16,872,090 $17,798,432 New Classrooms and Labs Housing and Campus Center Total Electrical Expense FY2011 $345,330 $2,870,567 $3,580,285 $3,434,611 $3,147,387 $3,784,775 $19,184,144 $22,586,437 $22,433,946 $20,019,477 $21,928,537 Office of Facilities and Grounds TOTAL Utility Cost Trends FY 2011 vs. FY 2012 6 April 2015 UHM Office of Facilities and Grounds 21 Office of Facilities and Grounds Electrical Cost Trends FY 2011 vs. FY 2012 6 April 2015 UHM Office of Facilities and Grounds 22 Office of Facilities and Grounds Cumulative Annual Variance by Cost Element 6 April 2015 UHM Office of Facilities and Grounds 23 Office of Facilities and Grounds Mānoa Energy BTU per GSF 6 April 2015 UHM Office of Facilities and Grounds 24 Office of Facilities and Grounds Mānoa Energy Cost Comparison per GSF 6 April 2015 UHM Office of Facilities and Grounds 25 Office of Facilities and Grounds Cost per Student FTE 6 April 2015 UHM Office of Facilities and Grounds 26 Office of Facilities and Grounds Sustainability Program: Mānoa Green Days • Over twenty main campus buildings currently participate in the program representing nearly 1,000,000 GSF of campus floor space. • July 2009 pilot “power-downs” were implemented on selected buildings. • In November 2010 the program was expanded to all participating buildings during the weekends, Thanksgiving break, and Christmas breaks. • As a result of the MGD program the campus has experienced a reduction of over 900,000 kWh or 1% of its annual usage in addition to allowing UHM Facilities to gain critical experience exercising real-time control over its chill water and electrical distribution system. Office of Facilities and Grounds Lighting Retrofit, Photovoltaic Power, Demand Response • Campus-Wide Lighting Retrofit Design-Build Project currently pending RFP release – RFP for Campus-wide lighting retrofit of up to 4.5 million GSF – Estimated 10-15% energy reduction • UHM Facilities is currently teamed with energy consultants Newcomb, Anderson, and McCormick (NAM) to acquire 5 MW of Photovoltaic Electricity – Estimated 7-10% energy reduction • New Energy Management Systems enable Demand Response – Estimated 10-15% energy reduction Office of Facilities and Grounds Proposed On-Campus Photovoltaic Roof-top and Car Canopy Sites Office of Facilities and Grounds Conclusions • Manoa currently has more campus than it can afford • Student Tuition as a source of utility funds is limited – $1,665 per Student FTE FY2011 – $2,265 per Student FTE FY2012 • UH Manoa Must Rationalize its Facility Expenses to match available Tuition resources – Increased reliance on debt financing of projects – Increased reliance on new sources of revenues – New Cost Allocation Model • We need to work together to develop a new Campus 6 April 2015 UHM Office of Facilities and Grounds 30