MRS/MUS

advertisement
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
MONTHLY PROGRESS REPORT
on
NTDC DEVELOPMENT PROJECTS
for
April, 2013
PLANNING POWER
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
ACTIVITIES
 Ongoing Development Projects
 Projects Ready for Implementation
 Cross Border Interconnection Projects
PLANNING POWER
1
Ongoing Projects of NTDC
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
Name of the
Projects
Scope of Work
Approved
Cost
(MRs/ MUS$)
Date of
Approval by
ECNEC
Financing
Project
Status
Overall
Progress
Expected
Commissioning
1,038
17
21-01-2010
ADB
Tranche-I
Project
Completed.
100 %
Commissioned in
June, 2012
Project
Completed.
100 %
Commissioned in
June, 2012
Project
Completed.
100 %
Commissioned in
December, 2012
Project
Completed.
100 %
Commissioned in
December, 2012
Addition of 500/220 kV
1-
Extension at
500 kV Sheikh
Muhammadi
1x450 MVA T/F
Addition of 220/132 kV
1x160 MVA T/F
Addition of 500/220 kV
2-
Extension at
500 kV Dadu
1x450 MVA T/F
Addition of 220/132 kV
1,050
17
21-01-2010
ADB
Tranche-I
1x160 MVA T/F
3-
In/out of
220kV Ghazi
Barotha –
Shahi Bagh at
Mardan
220 kV Double Circuit
Transmission Line (30 km)
533
9
30-11-2006
PLANNING POWER
ADB
Tranche-I
3
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
4-
Name of the
Projects
220 kV GIS
Bandala
Scope of work
220 kV substation with
two 220/132 kV 160 MVA
T/Fs along with allied
equipment.
In/Out of 220 kV GattiKSK Transmission Line at
Bandala (5+5 km)
Approved
Cost
(MRs/
MUS$)
1,950
32
Date of
Approval by
ECNEC
30-11-2006
Financing
ADB
Tranche-I
220 kV substation with
two 220/132 kV 250 MVA
T/Fs and allied equipment
Project
Status
Overall
Progress
Expected
Commissioning
Civil &
electrical
works in
progress.
76 %
July, 2013
Project
Completed.
100 %
Commissioned on
16-05-2012
Civil and
electrical
works in
progress.
75 %
July, 2013
Project
Completed.
100 %
Commissioned in
June, 2012
220 kV Dharki-Rohri New
D/C T/L (115 km)
5-
220 kV Rohri
220kV D/C Rohri NewShikarpur T/L (50km)
4,847
78
06-02-2008
ADB
Tranche-II
220kV D/C T/L for In/Out
of Fauji Mari-Rohri New
at Engro Chemical CCPP
(5+5km)
PLANNING POWER
4
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr. No.
6-
Name of the
Projects
220 kV Khuzdar &
220kV DaduKhuzdar D/C T/L
Scope of work
220 kV substation with two
220/132 kV 160 MVA T/Fs
and allied equipment
220 kV Dadu-Khuzdar D/C
T/L (274 km)
220 kV substation with two
220/132 kV 160 MVA T/Fs
and allied equipment
7-
8-
220 kV Kassowal
220 kV GIS
Shalamar
Two 220 kV D/C T/L for
In/out of 220 kV VehariYousafwala D/C T/L at
Kassowal (45+45km)
220 kV gas insulated
substation with three
220/132 kV 160 MVA T/Fs
and allied equipment
220 kV D/C T/L for In/Out
of one circuit of 220 kV
Ravi-KSK T/L at Shalimar
(9 km)and under ground
cable (3+3 km)
Approved
Cost
(MRs/
MUS$)
2,900
50
2,067
36
3,617
59
Date of
Approval by
ECNEC
27-07-2004
02-02-2005
22-10-2007
Financing
JICA
World Bank
Project
Status
Overall
Progress
Civil and
electrical
works in
progress.
78 %
Erection and
stringing work
in progress.
85 %
Civil and
electrical
works in
progress.
64 %
December, 2013
Project
Completed.
100 %
T/L commissioned
on 06-08-2012
Civil and
electrical
works in
progress.
76 %
September, 2013
100 %
T/L commissioned
on 20-11-2012
September, 2013
JICA
Project
Completed.
PLANNING POWER
Expected
Commissioning
5
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
9-
10-
Name of
the
Projects
220 kV
Okara
220 kV
T.T. Singh
Approved
Cost
(MRs/ MUS$)
Date of
Approval by
ECNEC
Project
Status
Overall
Progress
Expected
Commissioning
Civil and
electrical
works in
progress.
86 %
July, 2013
In/out of 220 kV Yousaf
Wala-Sarfraz Nagar D/C
T/L at Okara (5+5 km)
Project
Completed.
100 %
T/L ready for
commissioning.
220 kV substation with
three 220/132 kV 250 MVA
T/Fs and allied equipment
Installation in
progress.
86 %
Scope of work
220 kV substation with
three 220/132 kV 250 MVA
T/Fs and allied equipment
In/Out of 220 kV
Faisalabad-Multan D/C T/L
at T.T Singh (1+1 km)
1,884
31
1,759
29
06-02-2008
06-02-2008
Financing
ADB Tranche-II
ADB Tranche-II
PLANNING POWER
Civil works
completed.
Erection and
Stringing in
progress
July, 2013
86 %
6
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
Name of the
Projects
Scope of work
Approved
Cost
(MRs/ MUS$)
Date of
Approval by
ECNEC
Financing
220 kV substation with
two 220/132 kV 250 MVA
T/Fs and allied
equipment
11-
12-
220 kV
Loralai
500 kV
Rahim Yar
Khan
5,088
83
06-02-2008
Project
Status
Overall
Progress
Civil and
electrical
works in
progress.
82%
ADB Tranche-II
Sept. 2013
220 kV D.G Khan-Loralai
D/C T/L (200 km)
Erection and
stringing in
progress.
95 %
500 kV substation with
two 500/220 kV 600 MVA
& two 220/132 kV
250 MVA T/Fs and allied
equipment
Civil and
electrical
works in
progress.
64 %
4,936
81
22-10-2007
JICA
500 kV S/C T/L for In/Out
of 500 kV Guddu-Multan
3rd Circuit at R.Y Khan
(30+30 km)
December, 2013
Civil and
Electrical
works in
progress.
PLANNING POWER
Expected
Commissioning
57 %
7
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
13-
14-
Name of
the
Projects
Ext. at
500 kV
Ghazi
Barotha
220 kV
Gujrat
Scope of work
Approved
Cost
(MRs/
MUS$)
Date of
Approval by
ECNEC
Financing
Project Status
Overall
Progress
Expected
Commissioning
Addition of one 500/220 kV
600MVA T/F with allied equipment.
1,654
27
06-02-2008
ADB
Tranche-II
Civil works in
progress.
56 %
December, 2013
JICA
Contract
agreement
signed with M/S
HYOSUNG
Cooperation
Korea on
03-01-2013.
15 %
Bidding
documents vetted
by M/S Lahmayer
and sent to KfW
for concurrence.
5%
220 kV substation with three
220/132 kV 250 MVA T/Fs with
allied equipment.
220 kV D/C T/L for In/Out of 220kV
Mangla-Ghakkar D/C T/L at Gujrat
(2+2 km)
1,966
32
22-10-2007
220 kV substation with three
220/132 kV 160 MVA T/Fs and
allied equipment
15-
220 kV
Ghazi
Road,
Lahore
220 kV D/C T/L for In/Out of 220 kV
NKLP-S/Nagar S/C at Ghazi Road
(30 km)
2,592
43
25-02-2005
KfW
2013-14
Ready for
commissioning
220 kV D/C T/L for In/Out of 220 kV
Ravi-KSK S/C at Ghazi Road
(50 km)
PLANNING POWER
2013-14
100 %
8
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
Name of the
Projects
Scope of work
Approved
Cost
(MRs/
MUS$)
Date of
Approval by
ECNEC
Financing
220 kV substation with two
220/132 kV 250 MVA T/Fs
and allied equipment
16-
220 kV
Chishtian
2,633
43
22-10-2007
500 kV D.G
Khan
Civil work in
progress.
25.5 %
Civil works in
progress.
4,467
73
06-02-2008
48.5 %
25 %
ADB
Tranche-II
December, 2013
Erection and
stringing in
progress
In/Out of 500 kV GudduMultan 2nd Circuit at D.G
Khan (20+20 km)
PLANNING POWER
Expected
Commissioning
December, 2013
Civil and
Erection work
in progress.
Extension at 220 kV Vehari
Grid Station
17-
Overall
Progress
JICA
220 kV Chishtian-Vehari
D/C T/L (65 km)
500 kV substation with two
500/220 kV 600 MVA &
two 220/132 kV 250 MVA
T/Fs and allied equipment
Project
Status
88 %
9
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No
18
Name of the
Projects
Augmentation
of existing
Grid Stations
Approved
Cost
(MRs/
MUS$)
Scope of work
Name of
Grid
Stations
No.
of
T/Fs
Voltage
(kV)
Capacity
(MVA)
500 kV
Rewat
1
500/220
750
500 kV
Sheikh
Muhammadi
4
220/132
250
220 kV
Mardan
2
220/132
250
220 kV
Burhan
4
220/132
250
220kV Bund
Road
4
220/132
250
220 kV
Bahawalpur
2
220/132
250
220 kV
Quetta
Industrial
2
220/132
250
3,900
46
Date of
Approval
by ECNEC
21-01-2010
PLANNING POWER
Financing
Project Status
Expected
Commissioning
ADB Tranche-II
i) Contract
agreement for 13
T/Fs has been
signed with M/S
SUNIR and are
expected to be
delivered in
December 2013.
ii)Bidding
document for 5
T/Fs has been
sent to ADB for
concurrence.
December, 2013
10
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
19-
Name of the
Projects
SVC at NKLP
Scope of work
Approved
Cost
(MRs/
MUS$)
Static Var Compensators of
450 MVA Capacity
2,087
34
220 kV substation with
220/132 kV 1x160 MVA &
1x100 MVA T/Fs and allied
equipment
20-
220 kV Dera
Murad Jamali
880
11
220 kV D/C single
conductor T/L for In/Out of
220 kV Uch-Guddu S/C at
Dera Murad Jamali (5 km)
Date of
Approval by
ECNEC
Financing
Project Status
Overall
Progress
Expected
Commissioning
30-11-2006
ADB
Tranche-I
Contractor
mobilized and
started the
work.
26 %
December, 2013
Contractor
mobilized and
civil works in
progress.
10 %
PC-I approved
by CDWP on
07-04-2011
NTDC own
resources
PLANNING POWER
June, 2014
T/L profile and
Plan Tabling
approved.
10 %
11
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
Name of
the
Projects
Scope of work
Approved
Cost
(MRs/ MUS$)
Date of
Approval
by ECNEC
Financing
Project Status
Overall
Progress
Expected
Commissioning
JICA
Contract
agreement
signed on
12-06-2012
with M/S
CNEECFNEPCC (JV).
Contractor not
yet mobilized.
5%
June, 2014
500 kV substation with two
500/220 kV 750 MVA T/Fs and
allied equipment
Two 500 kV S/C T/Ls for In/Out
of 500 kV Sahiwal-Lahore S/C
at Lahore New (15+15km)
21-
500 kV
Lahore
(South)
Two 500 kV S/C T/Ls for In/Out
of 500 kV Lahore – Gujranwala
S/C at Lahore New
(50+50 km)
12,664
147
09-12-10
220 kV D/C T/L for In/Out of
220 kV NKLP- Ghazi Road S/C
at Lahore New (50km)
220kV D/C T/L for In/Out of 220
kV NKLP- Wapda Town S/C at
Lahore New (45 km)
PLANNING POWER
12
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
Name of
the
Projects
22-
SVC at Quetta
Scope of work
Static Var Compensators of
450 MVA Capacity
Approved
Cost
(MRs/ MUS$)
Date of
Approval
by ECNEC
Financing
Project
Status
Overall
Progress
Expected
Commissioning
2,087
34
06-02-08
ADB Tranche-II
Not yet
started.
NIL
December, 2014
JICA
Contract
agreement
signed, L/C
opened and
contractor
mobilized.
5%
June, 2014
500 kV substation with two
500/220 kV 600 MVA T/Fs
and allied equipment
23-
500 kV
Shikarpur
Two 500 kV S/C T/Ls for
In/out of 500 kV Dadu Guddu Cct # 1 (20+20 km)
8,085
94
09-12-10
Two 500 kV S/C T/Ls for
In/out of 500 kV Dadu –
Guddu Cct # 2 (22+22 km)
220 kV D/C T/L for In/out of
220 kV Guddu – Sibbi S/C
at Shikarpur(50 km)
PLANNING POWER
13
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
24-
Name of
the
Projects
Power
Dispersal
from 747
MW CCPP
Guddu
Scope of work
Approved
Cost
(MRs/ MUS$)
Date of
Approval
by ECNEC
Financing
Project Status
Overall
Progress
Expected
Completion
Buyer’s Credit
Basis
Tender opened on
08.10.2012 evaluated
and sent to BOD for
approval.
NIL
Dec. 2014
Bid evaluation report
finalized.ADB has
been requested for
allowing price
negotiation with single
bidder.Response from
ADB is awaited.
5%
Dec. 2014
Project Completed
100 %
Commissioned
on 25.04.2013
Work in progress from
NTDC own resources.
50 %
Sept. 2013
500kV Guddu-Muzaffargarh S/C
T/L (256 km)
Two 500 kV T/L for In/Out of
500 kV Guddu-Multan S/C T/L at
500 kV Muzaffargarh (10 +10 km)
7,856
91
29.07.2011
Extension at 500kV Muzaffargarh
220 kV Uch-II – Sibbi D/C T/L
(125km)
25-
Power
Dispersal
from Uch-II
220 kV D/C T/L for In/Out of
220kV existing Uch-I to Shikarpur
New S/C T/L at Uch-II (0.5 km)
2,508
30
16.08.2012
ADB
Tranche-III
Reconductoring of 220kV T/L
Uch-I to Uch-II (1 km)
Extension at 220kV Sibbi
substation
PLANNING POWER
14
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
Name of the
Projects
Scope of work
Approved
Cost
(MRs/
MUS$)
Date of
Approval by
ECNEC
Financing
Package-I
500 kV D/C T/L from Neelum
Jhelum to Gujranwala (270 km)
26-
Power Dispersal
from Neelum
Jhelum HPP
500 kV D/C T/L for In/out of 500
kV Neelum Jhelum Gujranwala
S/C at Azad Pattan (5km)
500 kV D/C T/L for In/out of 500
kV Neelum Jhelum Gujranwala
S/C at Karot (5 km)
22,582
251
PC-I cleared
by CDWP on
18-06-2012
Buyer’s
Credit
Basis
27-
220 kV D/C T/Line from Duber
Khwar to Khan Khwar Power
House (33km)
Tender
opened on
09-08-2012,
evaluated
and
submitted for
BOD
approval.
Overall
Progress
Expected
Completion
NIL
2015-16
Draft Bidding
documents
submitted to
NTDC on
Nov. 29,2012.
Package- II
Extension at 500 kV
Gujranwala
Power Dispersal
Arrangements
from Duber
Khwar Power
House
Project
Status
2494
28
(For Lot-I &
II)
Approved
under PC-I of
Hydel Power
Project
PLANNING POWER
Deposit
work of
G.M
(Hydel)
Work is
withheld due
to ROW
problems.
90 %
June. 2013
15
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Sr.
No.
Name of the
Projects
Estimated Cost
(MRS/MUS$)
Scope of work
Financing
132kV D/C T/L on Greeley
conductor from WPP#1 to
132kV Thatta G/S (60km)
28-
Dispersal of
power from
2x50MW
Wind Power
Plants at
Mirpur Sakro
132kV D/C T/L on Greeley
conductor for In/Out of one
cct of WPP#1 to Thatta
132kV line at WPP#2 (2km)
132kV S/C SDT T/L on Cairo
conductor from WPP#1 to
132kV M.P Sakro G/S
(15km)
Expected
Completion
Tenders for
construction will
be opened on
04.06.2013.
816
14
NTDC own
resources
Dec. 2013
Tenders for
purchase of
material will be
opened on
29.05.2013.
Construction of two 132kV
line bays each at Thatta and
Mir Pur Sakro Grid Station
Total
Project Status
110,940
1,520
PLANNING POWER
16
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Summary of Ongoing 500kV Projects
Sr. No.
Description
Addition in T/L & T/F Capacity
1-
500 kV S/C Transmission Lines Length
1150 km
2-
500/220 kV Transformation Capacity
(New Projects)
5100 MVA
3-
500/220 kV Transformation Capacity
(Extension)
1500MVA
4-
500/220 kV Transformation Capacity
(Augmentation)
300MVA
500/220 kV Transformation Capacity
(Grand Total)
PLANNING POWER
6900MVA
17
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Summary of Ongoing 220kV Projects
Sr. No.
Description
Addition in T/L & T/F Capacity
1-
220 kV D/C Transmission Line
1257.5 km
2-
220/132 kV Transformation Capacity
(New Projects)
6930 MVA
3-
220/132 kV Transformation Capacity
(Extension)
320MVA
4-
220/132 kV Transformation Capacity
(Augmentation)
1620MVA
220/132 kV Transformation Capacity
(Grand Total)
PLANNING POWER
8870MVA
18
Projects Ready for Implementation
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
NTDC Development Projects Ready for Implementation
Sr.
No.
Name of the
Projects
Scope of work
Est. Cost
(MRs/
MUS$)
Date of
Approval by
ECNEC
Financing
Project Status
Expected
Completion
2015-16
2015-16
500 kV Jamshoro-Moro-R.Y.K
S/C T/L (535 km)
3rd
1-
Circuit from
Jamshoro to
Rahim Yar Khan
500 kV Moro-Dadu S/C T/L
(55 km)
500 kV Switching Station at
Moro
24,214
269
PC-I Cleared
by CDWP on
21.10.2011
ADB
Tranche-III
Revised PC-1 will
be submitted as
per instructions of
P & D Division
GoP,Islamabad
3,103
35
PC-I is under
scrutiny in
Planning
Commission
Buyer’s Credit
Basis
Route under
checking.
Extension at 500 kV Jamshoro,
Dadu & R.Y.K Grid Stations.
220 kV Chashma Nuclear –
Bannu D/C T/L (125 km)
2-
Power Dispersal
from Chashma
Nuclear
(C3 & C4)
220kV D/C T/L for In/Out of
existing C1 &C2 at C3 & C4
(2 km)
Extension at 220kV Bannu
PLANNING POWER
20
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
NTDC Development Projects Ready for Implementation
Sr.
No.
Name of the
Projects
Est. Cost
(MRs/
MUS$)
Scope of work
Date of
Approval by
ECNEC
Financing
Project
Status
Expected
Completion
16.08.2012
Buyer’s Credit
Basis
T/L Plan and
Profile
Drawings
completed.
Execution is
linked with
installation of
Coal Fired
Power Plants
at Thar.
2015-16
06.02.2008
Proposed in
ADB
Tranche-IV
Hiring of
project
preparatory
consultants in
process.
2015-16
500 kV Thar – Matiari D/C T/L
(250 km)
3-
Power
Dispersal from
1200 MW Thar
Coal Based
Power Plant
500 kV Switching Station at Matiari
22,306
259
220kV sub station with 220/132kV
3x250 MVA T/Fs along with allied
equipment
4-
220 kV
Nowshera
In/Out of 220 kV Ghazi Barotha –
Shahi Bagh D/C T/L at Nowshera
(5+5 km)
1,876
31
PLANNING POWER
21
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
NTDC Development Projects Ready for Implementation
Sr.
No.
Name of the
Projects
Scope of work
Est. Cost
(MRs/
MUS$)
Date of
Approval by
ECNEC
Financing
Project Status
Expected
Completion
11.11.2011
Proposed in
ADB
Tranche-IV
Hiring of project
preparatory
consultants in
process.
2015-16
ADB
Tranche-III
Tenders opened on
26-02-2013 and are
under evaluation.
2015-16
220kV sub station with
220/132kV 3x250 MVA T/Fs
along with allied equipment
5-
220 kV
Lalian New
Two 220 kV D/C T/L for
In/Out of 220 kV Gatti –
Ludewala D/C T/L at Lalian
New (4+4 km)
1,581
18
220kV sub station with
220/132kV 2x250 MVA T/Fs
along with allied equipment
6-
220 kV
Mansehra
Two 220 kV D/C T/L for
In/Out of 220 kV Alai
Khawar – Islamabad
Peshawar Road D/C at
Mansehra (0.5+0.5 km)
905
11
07.04.2011
PLANNING POWER
22
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
NTDC Development Projects Ready for Implementation
Sr.
No.
Name of the
Projects
Est. Cost
(MRs/
MUS$)
Scope of work
Date of approval
by
ECNEC
Financing
220kV sub station with
220/132kV 2x250 MVA T/Fs
along with allied equipment
7-
220/132 kV
D.I.Khan
220 kV D/C T/L for In/Out of
220 kV Chashma NuclearLudewala S/C T/L at
D.I Khan (100km)
Total
3,779
44
09.12.2010
Proposed
in ADB
Tranche-IV
Project Status
Land for G/S
acquired.
Construction of
boundary wall in
progress.
Expected
Completion
2015-16
58,401
661
PLANNING POWER
23
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Summary of Projects Ready for Implementation
Sr. No.
Description
Addition in T/L & T/F Capacity
1-
500kV S/C Transmission Lines Length
1090 km
2-
220kV Transmission Line
246 km
3-
220/132 kV Transformation Capacity
PLANNING POWER
2500 MVA
24
Cross Border Interconnection
Projects
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Cross Border Interconnection Projects
Sr.
No.
1-
Name of the
Projects
Import of
100MW Power
from Iran.
Scope of work
Est. Cost
(MUS$)
Project Status
Financing
Expected
Completion
Iranian Bank
August, 2014
Not yet
committed
2018-19
Survey work in
progress.
220 kV Pak Iran Border-Gwadar D/C T/L
(100km)
44
220 kV GIS at Gwadar with 2x160MVA
T/Fs
Work awarded to
contractor and
contractor
mobilized.
500 kV HVDC Bipolar Transmission Line
from Pak - Iran Border to Quetta (585km).
2-
Import of
1000MW Power
from Iran.
500 kV Convertor Station at Quetta.
220 kV Quetta-Quetta Ind.D/C T/L (5 km)
220 kV Quetta-Loralai D/C T/L (170km)
508
MoU signed
between Pakistan &
Iran on 31.05. 2012
to implement the
project.
220 kV Quetta-Mastung D/C T/L (50km)
26
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Cross Border Interconnection Projects
Sr.
No.
3-
Name of the
Projects
Import of
1000MW Power
from Tajikistan
(CASA-1000)
Est. Cost
(MUS$)
Scope of work
Project Status
Financing
Expected
Completion
200
Feasibility Study
completed.
Positive
response from
World Bank
and IDB
2018-19
-
World Bank has
offered to sponsor
pre-feasibility study
for the project
Positive
response from
World Bank
-
500 kV HVDC Bipolar Transmission line
from Pak-Afghan Border to Peshawar
(71km).
500 kV Converter Station at Peshawar
220 kV D/C T/L for interconnection of
220 kV Peshawar- ShahiBagh (10 km)
500 kV D/C T/L for interconnection of
500 kV Peshawar- Tarbela (5 km)
4-
Import of 200-500
MW Power from
India.
Different options for Interconnection are
under study.
Total
752
27
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED
Report Prepared by:
Designation
Maqsood Ahmad Qureshi
Additional Manager
Projects Planning
0347-4447720
042-99202609
Fahmeeda Shafi
Dy. Manager Projects
Planning
042-99202609
PLANNING POWER
Contact No.
28
Download