ALDOT HIGHWAY FUNDING UPDATE Twenty-Fourth Annual Alabama Asphalt Pavement Conference MARCH 11 , 2 0 1 4 ALDOT’s Funding Plan Historical Critical Trends in Funding Issues and Needs Historical Federal Funding Levels Program Years ($ Millions) Range of Funding ($ Millions) Average Funding ISTEA 92 - 97 $283 $240 - $368 TEA-21 98 - 03 $560 $463 - $618 SAFETEA-LU 05 - 09 $731 $697 - $788 MAP-21 13 - 14 $737 $733 - $741 Historical Trends in Funding Last state gas tax increase was 5 ¢ in 1992 Last federal gas tax increase was 5 ¢ in 1993 [however, not available until 1997] State Highway Revenue $600,000,000 $500,000,000 $400,000,000 $300,000,000 Revenue Per Gal Tax $200,000,000 $100,000,000 2011 2009 2007 2005 2003 2001 1999 1997 1995 1993 1991 $- Total State and Federal Highway Revenue $2,000,000,000 1991 to 2011 $1,800,000,000 $1,600,000,000 $1,400,000,000 $1,200,000,000 $1,000,000,000 $800,000,000 $600,000,000 $400,000,000 $200,000,000 $- Federal State Total Total State and Federal Highway Revenue $2,000,000,000 Projected thru 2014 $1,800,000,000 $1,600,000,000 $1,400,000,000 $1,200,000,000 $1,000,000,000 $800,000,000 $600,000,000 $400,000,000 $200,000,000 $- Federal State Total Total State and Federal Highway Revenue $2,000,000,000 Without Stimulus $$ $1,800,000,000 $1,600,000,000 $1,400,000,000 $1,200,000,000 $1,000,000,000 $800,000,000 $600,000,000 $400,000,000 $200,000,000 $- Federal State Total Historical Trends in Funding Construction costs are 2 to 2½ times more than 20 years ago. Construction Costs FHWA Construction Index 250 200 150 100 50 0 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 Construction Costs State of Alabama Transportation Infrastructure Funding 1991 2012 State of Alabama Transportation Infrastructure Funding $514 million 1991 2012 State of Alabama Transportation Infrastructure Funding $514 million 1991 $1,213 million 2012 State of Alabama Transportation Infrastructure Funding ,, 00 ,0 $92.3 m $514 million $1123 million 2012 State of Alabama Transportation Infrastructure Funding New Diversion $92.3 m $514 million $493 million $630 million Inflation 1991 2012 Funding in 1991 Dollars [with Diversions and without Stimulus] Adjusted Revenue 900000000 $788m 800000000 700000000 600000000 500000000 400000000 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 300000000 Funding in 1991 Dollars [with Diversions and without Stimulus] Adjusted Revenue 900000000 $788m 800000000 700000000 600000000 500000000 $493 400000000 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 300000000 Funding in 1991 Dollars [with Diversions and without Stimulus] Adjusted Revenue 900000000 $788m 800000000 700000000 600000000 500000000 35 % Drop $493 400000000 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 300000000 Historical Trends in Funding 1991 to 2010 140% more money today than 1991, but relatively no change in total revenue since 2005. Purchasing power about the same today as 1991 and 35% less than 10 years ago due to inflation. CRITICAL ISSUES AND NEEDS What else can affect funding? FEDERAL FUNDING CONFUSION LEADS MOODY’S TO CUT HIGHWAY BONDS RATING Future Fuel Economy Standards Vehicle Miles of Travel Vehicle Miles 70000 Million Vehicle Miles 60000 50000 40000 30000 20000 10000 0 1967 1977 1987 1997 2007 CRITICAL ISSUES AND NEEDS IN TERMS OF PURCHASING POWER, WE ARE BACK TO T H E 1 9 9 1 L E V E L , J U S T P R I O R T O T H E L A S T S TAT E A N D F E D E R A L TA X I N C R E A S E . LEVEL FUNDING SINCE 2005 EXPECTED TO CONTINUE THROUGH 2014. F U E L E C O N O M Y W I L L F U R T H E R D E VA S TAT E T H E H I G H WAY P R O G R A M . F E D E R A L H I G H WAY T R U S T F U N D S O LV E N C Y I S A N I S S U E For every billion dollars invested in transportation infrastructure, 30,000 jobs are created. Source: U.S. Department of Commerce T H E S TAT E H I G H WAY S Y S T E M 11 , 0 0 0 C E N T E R L I N E M I L E S 4 , 2 0 0 N AT I O N A L H I G H WAY S Y S T E M 6 , 9 0 0 O T H E R S TAT E R O A D S 1 0 0 0 M I L E S O F I N T E R S TAT E 5,745 BRIDGES HIGHWAY REVENUE ESTIMATED STATE FUNDS 2013 $ 480,260,000 ESTIMATED FEDERAL FUNDS $ 733,095,000 TOTAL $1,213,355,000 ALLOCATION OF FUNDS BEGINNING BALANCE State Funds to Others $1,213,355,000 $ 87,500,000 ALLOCATION OF STATE FUNDS TO OTHERS ADMINISTRATIVE OFFICE OF COURTS PUBLIC SAFETY REVENUE DEPARTMENT STATE PERSONNEL STATE PARK MAINTENANCE INDUSTRIAL ACCESS APPROPRIATION COUNTY ENGINEER SALARY SUPPORT CAPTIVE COUNTY INSURANCE Total $ $ $ $ $ $ $ $ $ 35,000,000 28,500,000 4,900,000 1,375,000 500,000 11,000,000 6,100,000 125,000 87,500,000 ALLOCATION OF FUNDS BEGINNING BALANCE State Funds to Others Federal Funds to Others $1,213,355,000 $ 87,500,000 $ 130,427,000 ALLOCATION OF FEDERAL FUNDS TO CITIES AND COUNTIES LARGE URBAN AREAS SMALL URBAN AREAS COUNTIES (Including Off-System Bridge) CMAQ – B’HAM AREA TRANSPORTATION ALTERNATIVES METROPOLITAN PLANNING GARVEE BOND PAYMENT Total $ 35,705,000 $ 13,312,000 $ 35,711,000 $ 10,919,000 $ 16,780,000 $ 2,915,000 $ 18,000,000 $ 130,427,000 ALLOCATION OF FUNDS BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead $1,213,355,000 $ 87,500,000 $ 130,427,000 $ 72,625,000 ALLOCATION OF FUNDS BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance $1,213,355,000 $ 87,500,000 $ 130,427,000 $ 72,625,000 $ 147,500,000 ALLOCATION OF FUNDS BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance Safety $1,213,355,000 $ 87,500,000 $ 130,427,000 $ 72,625,000 $ 147,500,000 $ 60,420,000 ALLOCATION OF FUNDS BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance Safety Interstate Maintenance $1,213,355,000 $ 87,500,000 $ 130,427,000 $ 72,625,000 $ 147,500,000 $ 60,420,000 $ 170,000,000 SYSTEM PRESERVATION Pavements - Interstate 1003 centerline miles Rehabilitate 84 miles/year $1,900,000 per mile resurfacing cost x 84 miles/year $159,600,000 Includes 98 miles of Corridor X that will soon be added to the interstate system as I-22. Interstate maintenance funding includes the addition/modification of interchanges, rest area rehabilitation and lighting projects. ALLOCATION OF FUNDS BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance Safety Interstate Maintenance Bridge Replacement $1,213,355,000 $ 87,500,000 $ 130,427,000 $ 72,625,000 $ 147,500,000 $ 60,420,000 $ 170,000,000 $ 80,000,000 SYSTEM PRESERVATION Bridge Replacement 5,745 State System Bridges ÷ 50 Average Bridge Life, Yrs 115 Bridges Replaced per Yr It takes $200 to $225 million/yr to replace 115 bridges/yr Spending $80 m/yr replaces about 40 bridges/year ALLOCATION OF FUNDS BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance Safety Interstate Maintenance Bridge Replacement Resurfacing $1,213,355,000 $ $ $ $ $ $ $ $ 87,500,000 130,427,000 72,625,000 147,500,000 60,420,000 170,000,000 80,000,000 260,000,000 SYSTEM PRESERVATION Pavement – Non Interstate 10,025 centerline miles Resurface 850 miles/year $306,000 per mile resurfacing cost x 850 miles/year $260,000,000 Current backlog of resurfacing deficit = 3,984 miles 2013 Resurfacing Program Federal Maintenance Bid (Letting) Overruns, Utilities, Including E & I, Division & Indirect Cost No. of Projects Cost/Project Miles Cost/Mile Lane Miles Cost/Lane Mile 1 2 3 4 5 6 7 8 9 $33,359,786.95 $30,833,390.53 $19,157,221.41 $26,821,875.10 $22,602,903.46 $25,130,841.63 $34,235,509.59 $22,778,664.63 $19,387,896.78 14 17 8 13 8 9 17 15 11 $2,382,841.93 $1,813,728.85 $2,394,652.68 $2,063,221.16 $2,825,362.93 $2,792,315.74 $2,013,853.51 $1,518,577.64 $1,762,536.07 66.85 71.69 56.59 77.43 62.28 62.45 104.12 86.26 73.24 $499,024 $430,093 $338,527 $346,402 $362,924 $402,415 $328,808 $264,070 $264,717 226.25 186.70 136.28 168.28 146.65 147.75 262.85 198.70 181.87 $147,447 $165,153 $140,573 $159,388 $154,125 $170,090 $130,245 $114,638 $106,603 Total $234,308,090.08 112 $2,092,036.52 660.91 $354,523 1655.33 $141,547 MAINTENANCE RESURFACING PROGRAM ALLOCATION OF FUNDS BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance Safety Interstate Maintenance Bridge Replacement Resurfacing Capacity/System Enhancement/APD $1,213,355,000 $ $ $ $ $ $ $ $ $ 87,500,000 130,427,000 72,625,000 147,500,000 60,420,000 170,000,000 80,000,000 260,000,000 150,000,000 ALLOCATION OF FUNDS BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance Safety Interstate Maintenance Bridge Replacement Resurfacing Capacity/System Enhancement/APD Discretionary $1,213,355,000 $ $ $ $ $ $ $ $ $ $ 87,500,000 130,427,000 72,625,000 147,500,000 60,420,000 170,000,000 80,000,000 260,000,000 150,000,000 10,000,000 ALLOCATION OF FUNDS BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance Safety Interstate Maintenance Bridge Replacement Resurfacing Capacity/System Enhancement/APD Discretionary Equipment/Land & Building $1,213,355,000 $ $ $ $ $ $ $ $ $ $ $ 87,500,000 130,427,000 72,625,000 147,500,000 60,420,000 170,000,000 80,000,000 260,000,000 150,000,000 10,000,000 11,000,000 ALLOCATION OF FUNDS FY 2013 BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance Safety Interstate Maintenance Bridge Replacement Resurfacing Capacity/System Enhancement/APD Discretionary Equipment/Land & Building ATRIP BONDS ENDING BALANCE $1,213,355,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 87,500,000 130,427,000 72,625,000 147,500,000 60,420,000 170,000,000 80,000,000 260,000,000 150,000,000 10,000,000 11,000,000 33,883,000 0 ALLOCATION OF FUNDS FY 2014 BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance Safety Interstate Maintenance Bridge Replacement Resurfacing Capacity/System Enhancement/APD Discretionary Equipment/Land & Building Overruns ATRIP BONDS ENDING BALANCE $1,213,355,000 $ 87,500,000 $ 130,427,000 $ 72,625,000 $ 147,500,000 $ 48,420,000 $ 158,000,000 $ 73,000,000 $ 241,000,000 $ 150,000,000 $ 10,000,000 $ 11,000,000 $ 50,000,000 $ 33,883,000 $ 0 ALLOCATION OF FUNDS FY 2015 BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance Safety Interstate Maintenance Bridge Replacement Resurfacing Capacity/System Enhancement/APD Discretionary Equipment/Land & Building Overruns ATRIP BONDS ENDING BALANCE $1,213,355,000 $ 87,500,000 $ 130,427,000 $ 72,625,000 $ 147,500,000 $ 48,420,000 $ 158,000,000 $ 73,000,000 $ 241,000,000 $ 86,500,000 $ 10,000,000 $ 11,000,000 $ 50,000,000 $ 97,383,000 $ 0 In its latest Highway Trust Fund (HTF) projections, the CBO reports, "the highway and transit accounts of the Highway Trust Fund will have insufficient revenues to meet obligations starting in fiscal year 2015." However, the CBO has also said that it is possible that the HTF will run out of funding before the expiration of current surface transportation bill, MAP-21, on Sept. 30. This is consistent with U.S. DOT Secretary Anthony Foxx's announcement in January that the Highway Account of the HTF is likely to run out of money in August of this year. ALLOCATION OF FUNDS FISCAL CLIFF 2015 BEGINNING BALANCE State Funds to Others Federal Funds to Others ALDOT Overhead Routine/Emergency Maintenance Safety Interstate Maintenance Bridge Replacement Resurfacing Capacity/System Enhancement/APD Discretionary Equipment/Land & Building ATRIP BONDS Overruns Emergency Maintenance ENDING BALANCE $ 480,000,000 $ 87,500,000 $ 0 $ 100,000,000 $ 147,500,000 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 100,000,000 $ 0 $ 45,000,000 $ 0 Long-Term Transportation Bill Will Require $100 Billion in New Revenue or Fund Transfers According to new numbers released this week by the non-partisan Congressional Budget Office, a six-year surface transportation bill would require $100 billion in additional revenue—such as new taxes or transfers from the Treasury's General Fund—just to maintain current spending levels. Foxx Touts President's Transportation Proposal, Acknowledges State DOT Needs at AASHTO Washington Briefing Obama, speaking at Union Depot in St. Paul, Minn., called for a $302 billion, four-year surface transportation bill to follow up MAP-21 and allow for greater certainty with funding at the state and local level. Of that $302 billion, preliminary indications are that $206 billion would go toward investing in highways and road safety, $72 billion for transit, $19 billion for rail programs, and $9 billion for competitive funding for programs like the Transportation Investment Generating Economic Recovery (TIGER) grants. The administration says the bill would also stress coordination and local decision making so that "communities can better realize their vision for improved mobility." FY 2015 BUDGET Transit Highway Rail TIGER 2014 10.8B 40.9B 1.6 B 0.6B 2015 17.7B 48.6B 5B 1.25B % Increase 64% 19% 213% 108% House Ways and Means Chair Camp's measure is a full tax reform document that touches on transportation as a small piece of that reform. In his bill, the HTF would receive $126.5 billion through the repatriation of corporate tax income, enough to keep the HTF solvent for approximately eight years at current funding levels. Camp's proposal would also generate about $200 million between 2014-2023 through a 6cent-per-gallon fee for ships traveling the inland waterways. Tonnage of Asphalt by Fiscal Year FISCAL YEAR 2009 2010 2011 2012 2013 Grand Total TONS 5,677,537 4,200,894 4,983,238 4,113,287 5,043,524 24,018,480 TOTAL AMOUNT LET $339,772,747 $247,532,090 $317,459,153 $272,955,644 $355,222,731 $1,532,942,365 Questions ?