Results for the European PHS potential. A GIS based study Marcos Gimeno-Gutiérrez Roberto Lacal-Arántegui Source: www.lasprovincias.es Background RE goals (20% by 2020) require interconnections, energy storage, flexible generation and demand-side management. Pumped hydropower storage (PHS) is the only storage that can contribute significantly to the 2020 goals. There were no other previous studies assessing the European PHS potential. 2 Objective ASSETS assessment of the European PHS potential. DEM Scenarios Political borders GIS-based model Dams/reservoirs Theoretical potential Define a GIS-based methodology (2011) Inhabited areas Apply restrictions UNESCO Environmental potential Grid infrastructure JRC Improvements Application to assess the European potential Transport infrastructure Human-use potential Natura 2000 Validate it with industry and academia (workshop April 2012) Apply restrictions Apply restrictions Realisable potential Costs Apply restrictions Economic potential 3 Improvements on the JRC/UCC model Description Original T1 Current T1 Original T2 Current T2 Maximum distance between two existing or one existing and any prospective reservoirs 1, 2, 3, 4, 5-km 1, 2, 3, 5, 10, 20-km 1, 2, 3, 4, 5-km 1, 2, 3, 5, 10, 20-km Minimum head 150 m 150 m 150 m 150m generally, 50m added at 5km Assumed minimum new reservoir capacity 1 000 000 m3 100 000 m3 1 000 000 m3 100 000 m3 Minimum distance to UNESCO site 5 km 500 m 5 km 500 m Maximum distance to electricity transmission network 50 km 20 km 50 km 20 km 4 How the model works Sites in 5-km scenario Sites with largest energy storage potential 5 How the model works Best sites within 5 km 6 Results Contains: Complete assessment of potential sites, for both T1 and T2 With results for 31 European countries from an improved model Support to decision making 7 Countries analysed EU Member States (EU) Austria (AT) Belgium (BE) Bulgaria (BG) Cyprus (CY) Sweden (SE) Czech Republic (CZ) Spain (ES) France (FR) Ireland (IE) Romania (RO) Poland (PL) Germany (DE) Hungary (HU) Italy (IT) Portugal (PT) Greece (GR) Slovakia (SK) Slovenia (SI) Finland (FI) United Kingdom (UK) Acceding country (AC) Croatia (HR) EFTA Members Norway (NO) Switzerland (CH) Candidate countries (CC) Iceland (IS) Serbia (RS) Turkey (TR) FYROM (MK) Montenegro (ME) Potential candidates (PC) Albania (AL) Bosnia and Herzegovina (BA) Kosovo* (XK) 8 Topology 1 Topology 1 T1 theoretical potential Scenario 20 km 10 km 5 km 3 km 2 km 1 km No. of sites 8 268 1 779 387 141 52 5 Potential energy storage (TWh) 54.31 8.00 0.83 0.31 0.10 0.004 TWh T1 theoretical potential 60 AC EFTA CC PC 37.12 30 EU 11.39 0 20 km 10 km 5 km 3 km 9 Topology 1 Topology 1 T1 realisable potential Scenario 20 km 10 km 5 km 3 km 2 km 1 km No. of sites 3 229 538 99 32 8 1 Potential energy storage (TWh) 28.63 1.32 0.20 0.07 0.03 0.003 T1 realisable potential TWh 30 19.90 15 EU AC EFTA CC PC 3.97 0 20 km 10 km 10 Topology 2 Topology 1 T2 theoretical potential Scenario 20 km 10 km 5 km 3 km 2 km 1 km No. of sites 4 883 4 067 2 737 1 595 776 82 Potential energy storage (TWh) 122.87 51.09 15.31 7.98 3.11 0.37 TWh T2 theoretical potential 125 42.97 100 75 EU AC EFTA CC PC 18.24 50 16.15 59.43 25 24.42 0 20 km 10 km 5 km 3 km 2 km 11 Topology 2 Topology 1 T2 realisable potential Scenario 20 km 10 km 5 km 3 km 2 km 1 km No. of sites 4,603 3,428 2,025 1,071 485 45 Potential energy storage (TWh) 79.76 33.32 10.21 4.72 1.89 0.18 T2 realisable potential TWh 80 30.47 60 EU AC EFTA CC PC 14.90 40 12.32 20 32.92 12.68 0 20 km 10 km 5 km 3 km 2 km 12 Existing vs. potential capacity Existing and T2 (20-km) potential pumped storage capacity TWh 20 19.13 Existing capacity T2 realisable potential T2 theoretical-only potential Total 16.60 15 10 6.30 6.15 5 3.04 2.01 1.85 1.94 1.58 1.33 0 ES NO FR UK AT CH GR BG PT DE 0.65 CZ 13 European PHS potential 14 European PHS potential 15 Eurostat data for 2011 Net electricity production Net production natural hydro Net production from PHS Net production from wind Net production from solar Total variable RES electricity PHS generation capacity (MW) Conventional hydro generation capacity (MW) GWh 3 114 669 330 389 28 803 177 792 46 012 223 804 42 566 146 537 EU-27 PHS realisable potential (T2) 4000 3500 3000 35000 No. of sites 30000 Total energy storage (GWh) 25000 2500 Total PHS energy storage No data capacity (Source: Eurelectric's Hydro in Europe: Powering renewables ) Reservoir data (ECRINS) No. of reservoirs Of which capacity is inc. 3 Total capacity (Hm ) No. of reservoirs selected Capacity of selected reservoirs (Hm3) 6 476 5 778 782 353 5 225 20000 2000 15000 1500 10000 1000 500 5000 0 No. of sites 0 GWh 782 350 JRC assessment T1 - theoretical potential No. of sites Average head (m) Average energy storage (GWh) Total energy storage (GWh) T1 - realisable potential No. of sites Average head (m) Average energy storage (GWh) Total energy storage (GWh) T2 - theoretical potential No. of sites Average head (m) Average energy storage (GWh) Total energy storage (GWh) T2 - realisable potential No. of sites Average head (m) Average energy storage (GWh) Total energy storage (GWh) 1 km 5 201 1 4 1 km 1 292 3 3 1 km 71 222 5 336 1 km 36 222 4 4 2 km 47 281 1 61 2 km 6 433 3 16 2 km 561 230 2 1 118 2 km 315 226 2 553 3 km 131 301 2 255 3 km 25 321 1 36 3 km 1 120 259 4 4 179 3 km 670 246 3 1 911 5 km 5 km/ 50m 10 km 20 km 1 581 319 2 2 874 7 317 363 2 11 387 10 km 20 km 421 316 2 798 2 553 426 2 3 967 5 km/ 50m 10 km 20 km 2 986 231 3 10 310 3 081 411 8 24 416 3 815 555 16 59 431 5 km/ 50m 10 km 20 km 2 499 342 5 12 678 3 551 470 9 32 922 344 307 2 709 5 km 5 km/ 50m 77 322 2 141 5 km 1 972 308 4 7 430 5 km 1 330 278 3 3 982 2 264 200 2 5 425 16