School Funding Reforms Notional SEN: Elements 1, 2 and 3 Richard Shirley Children’s Services Finance Introduction • DSG funding reforms introduced the concept of ‘notional SEN’ in 2013-14 • This is the idea that within school budgets was an allocation for dealing with ‘expensive’ children, with higher needs than a child without SEN. Introduction Slide 2 Introduction • Manchester has always included and expected its schools to fund these children from within the delegated budget share; up to a maximum of £10,000. • This is because, although the Schools Block funding is allocated on an equal basis per pupil, the costs incurred by schools are not linear and there is an expectation that the less expensive children will contribute towards the more expensive children. Introduction Slide 3 Changes • Under the 2013-14 funding reforms the idea of notional SEN continues in Manchester, but is refined. Now schools are expected to contribute up to the basic entitlement + £6,000 per SEN child from their budget share. • This is also know as element 1 (core education funding) and element 2 (additional support funding) • Anything above this threshold is called element 3 – ‘top up’ funding. Top up funding is also known as individually assigned resources (IAR) and is for statemented or resource agreement children Changes Slide 4 Notional SEN per pupil £15,000 E3 E3 E3 £10,000 E2 E2 E2 £5,000 E1 E1 E1 KS3 KS4 £0 Primary Notional SEN per pupil What is the notional SEN? Slide 5 Notional SEN per pupil • The expected maximum school contribution to each child is set out below. Pupil age Element 1: core education funding (AWPU) Element 2: additional support funding Total school contribution per pupil (the ‘notional SEN’ to be found, per high needs child) Primary £3,101 £6,000 £9,101 KS3 £4,111 £6,000 £10,111 KS4 £4,476 £6,000 £10,476 Notional SEN per pupil What is the notional SEN? Slide 6 School Budget Shares • Reception – Y11 pupils are funded based on the October census and are funded through the schools block • Nurseries are funded based on numbers returned on each termly census School Budget Shares How schools are funded Slide 7 School Budget Shares DfE number 1234 FINAL School Budgets 2013-14 Manchester Primary School Total 2013-14 funding £1,470,351 Comprising of: Schools Block Primary Pupil Numbers Basic Entitlement (AWPU) Primary (including reception uplift) Key Stage 3 Key Stage 4 Total Deprivation Free Schools Meals (FSM6) IDACI Score 0.2 - 0.25 IDACI Score 0.25 - 0.3 IDACI Score 0.3 - 0.4 IDACI Score 0.4 - 0.5 IDACI Score 0.5 - 0.6 IDACI Score 0.6 - 1 Total Low Cost, High Incidence SEN Pupils who did not achieve an EYFSP score of 73 Secondary pupils with Level 3 or below in both KS2 Total English as an Additional Language (EAL) EAL for first 3 years in a school Mobility Secondary Pupil Numbers 200 Primary Unit Value £3,101 - Primary % of NOR Primary Pupils 58.79% 1.10% 1.65% 8.82% 8.82% 32.23% 46.28% Primary % of NOR Secondary % of NOR 117.58 2.20 3.31 17.63 17.63 64.46 92.56 Primary Pupils 14.07% Secondary Pupils - Secondary % of NOR Secondary Pupils 24.67% Primary % of NOR Pupils starting school outside normal entry dates School Budget Shares 17.58% Other Factors Lump SumWhere is my notional SEN? Teaching and learning / rental of temporary accommodation / split site funding Rates PFI funding Exceptional Circumstances Total 35.16 Secondary Unit Values £425 £50 £90 £105 £240 £320 £450 Secondary Unit Value £1,204 Secondary % of NOR 49.34 Primary Pupils £341 £30 £70 £80 £130 £200 £350 Primary Unit Value 28.14 Primary Pupils £4,111 £4,476 Primary Unit Values - - Primary % of NOR Secondary Unit Value - Secondary Pupils - Secondary % of NOR Primary Unit Value - Secondary Pupils - £5,000 £380 Primary Unit Value - £526 Secondary Unit Value £2,064 Secondary Unit Value £1,500 This is the AWPU – element 1 Total £620,200 £620,200 Total £40,095 £66 £231 £1,410 £2,292 £12,893 £32,397 £89,384 Total £33,881 £33,881 Total £18,750 Total £18,497 Total £155,000 £15,060 £16,897 - Slide 8 EAL for first 3 years in a school 24.67% Primary % of NOR Mobility Pupils starting school outside normal entry dates 49.34 Primary Pupils 17.58% - Secondary % of NOR 35.16 - Secondary Pupils - £380 Primary Unit Value - £2,064 Secondary Unit Value £526 £1,500 £18,750 Total £18,497 School Budget Shares Other Factors Lump Sum Teaching and learning / rental of temporary accommodation / split site funding Rates PFI funding Exceptional Circumstances Total Total £155,000 £15,060 £16,897 £186,957 Budget sub total MFG and De-Delegation £967,670 Schools Block Schools Block Funding 2012-13 Funding 2013-14 per pupil per pupil Funding £4,202 £3,916 less 2013-14 lump sum less lump sum, rates and 2012-13 rates, per and new delegation of pupil in October 2011 £29.35 per pupil Notes % Change -6.82% MFG @ -1.5% Gains capped @ 1.75% % adjustment required 5.32% MFG Adjustment De-delegated budgets (code to CFR I01) £81,374 £3,287 2013-14 Budget Share £1,045,756 % adjustment applied Budgets de-delegated by 2013-14 sub total budget this equates to £223.55 to 2012-13 budget and maintained schools: add MFG adjustment per pupil added to 2013-14 approx. £9.03 per pupil minus de-delegation budget FINAL Schools Block 2013-14 (CFR Code I01) Element 2 is contained within this total budget share £1,045,756 Early Years Block Funding Number of Pupils Hourly Base Rate Capacity Funding (950 hours) FSM Funding (950 hours) Total Early Years Funding 52 26 £2.35 £0.36 Hourly Quality Supplement £1.15 High Needs Block Pupils funded through the HNB SEN D/D+ (CFR Code I03) Resource Units (CFR Code I01) Total High Needs Funding - Hourly Grants £0.22 Funding - £183,768 £8,892 £192,660 Element 3 Code I01) comes (CFR through the High Needs Block - here CAPACITY Early Years Block 2013-14 Funding Average IDACI Deprivation Rate Amounts £192,660 £36,095 £36,095 INDICATIVE High Needs Block 2013-14 £36,095 Other Grants Number of Pupils Amount per pupil School Budget Shares 204 Where is my notional SEN? 1- Devolved Formula Capital (DFC) (CFR Code CI01) Pupil Premium: FSM (CFR Code I05) Pupil Premium: LAC (CFR Code I05) Pupil Premium: Service Children (CFR Code I05) Y7 Catch Up Premium (CFR Code I06) Music Grant (CFR Code I06) INDICATIVE Other Grants 2013-14 - £900 £900 £300 £500 Estimated grant amount £8,174 £183,600 £900 £3,166 Notes TBC for 2013-14 - 2012-13 allocation used for indicative TBC on Jan 13 census numbers - Jan 12 used for indicative TBC on 31 March 13 data - 31 March 12 used for indicative TBC on Jan 13 census numbers - Jan 12 used for indicative TBC on Oct 13 census numbers - Oct 12 used for indicative TBC on Jan 13 census - 80% of Jan 12 used for indicative Slide 9 £195,840 School Budget Shares • Notional SEN is paid with the school budget share – 13 payments from April to March, all approximately 7% of the total annual allocation • High needs (IAR) budgets are set at the start of the financial year and adjusted quarterly based on actual pupil intake and statemented need School Budget Shares When do I get my notional SEN? Slide 10 Central High Needs Budgets • £61 million total High Needs Block • £41 million delegated to special schools, special academies, named pupils and in year adjustments • £12.5 million centrally retained, of which £6.6m is to pay for ‘out of authority’ SEN children • Others including SEN transport, support for inclusion, independent special schools fees Central High Needs Budgets Slide 11 Challenges in Manchester’s DSG • Same pot of money as last year, but more children with statements and more expensive statements • Special schools have increased in size – no more money to fund this • Post-16 SEN funding has been based on 2011-12 data, Manchester’s population, costs and children with SEN has increased dramatically since then – estimated £2m+ shortfall in funding Challenges in DSG Slide 12 Statements and Resource Agreements - Trends Number and cost of children in mainstream schools with IAR £8,000,000 1,000 900 £7,000,000 Cost 700 £5,000,000 600 £4,000,000 500 400 £3,000,000 300 £2,000,000 200 £1,000,000 100 £- 2009/10 2010/11 Cost Statements - Trends Number of pupils 800 £6,000,000 2011/12 2012/13 to date Number of children Slide 13