Dutyholders 08-09 annual review

advertisement
Health
Healthand
andSafety
Safety
Executive
Executive
08-09 Annual review of
[Dutyholder’s name]
Management of major hazards and
compliance with relevant statutory
provisions
Agenda
•
•
•
•
•
•
•
Introductions
Purpose of review
HSE industry-wide feedback
HSE company-specific feedback
Company’s response and plans
Contributions from other attendees
Actions to be agreed
Industry-wide feedback
•
•
HSE’s key messages to the industry
•
OSD’s enforcement trends
•
Industry performance - lagging indicators
•
Significant legal changes and publications
•
(A reminder of what HSE does)
OSD’s key programmes and projects
OSD’s Priority Areas
Safety Culture
Leadership
Asset Integrity
Competency
HSE’s key messages to industry
•
Improvements required in:
 safety leadership by senior management
 asset integrity
 competence
 safety culture
•
Need to consider response to Step Change:
 vision of the safest oil and gas sector by 2010
 strategy to recognise and reduce hazards,
maintain and improve asset integrity, and
take personal ownership for safety
OSD programmes & projects
•
Verification inspection
•
Inspection of audit arrangements
•
External corrosion inspection
m
ai
n
Sa
fe
pl
SM
S
g
ica
ls
Li
fti
n
Ch
em
of
wo
rk
of
wo
rk
te
na
nc
e
ac
e
Sy
st
em
s
SC
E
In
te
gr
it y
OSD enforcement notices
April to November 08
6
5
4
3
2
1
0
Industry-wide hydrocarbon releases
200
180
160
140
120
100
80
60
40
20
0
'00/01
'01/02
'02/03
'03/04
Major
'04/05
Significant
'05/06
Minor
'06/07
'07/08
[08/09]
Industry-wide accidents
200
180
160
140
120
100
80
60
40
20
0
'00/01
'01/02
'02/03
'03/04
Fatal
'04/05
Major
'05/06
Over 3 day
'06/07
'07/08
[08/09]
Some points on lagging indicators
•
Hydrocarbon releases
– rising trend in >25kg releases
– compression systems & small-bore piping
significant contributors
– human factors a significant cause
•
•
•
No fatalities, major injury rate 10% up on last year
•
•
37% of all injuries from maintenance/construction
Over-3-day injury rate 10% down on last year
Dangerous occurrences 5% up, only 3.6% better
than 12 years ago
19% of all injuries from deck operations
Typical installation performance
HCR Major &
Significant
Good
0
Average
1–2
Poor
3
Major Injuries
0
1
2
Over 3 day
0
2–3
4
0
2–3
>5
Injuries
Dangerous
Occurrences
Significant legal changes and
publications
•
New AOGBO:
revised definitions
‘walk-to-work’ vessel excluded
•
Proposed revisions of safety case regulations
& other major hazard legislation:
dutyholder is person in control, not
operator or owner
[revised PFEER guidance on rescue?]
•
[others?]
[A reminder – what HSE does]
•
[Delivering health and safety outcomes
•
•
•
Enabling justice
Supporting Government
Demonstrating public accountability]
Your management of major hazards
•
Our high-level intervention findings suggest:
[include good as well as bad]




1
2
3
4
Your management of occupational
health and safety
•
Our high-level intervention findings suggest:
[include good as well as bad]




1
2
3
4
Dutyholder intervention plan
Currently we plan to:

Visit all your installations [twice ?] in the next
12 months

Undertake additional visits onshore and
offshore as part of OSD’s audit project

Investigate any major or significant
hydrocarbon releases, and other significant
incidents