Environment procedure

advertisement
Environment management procedure
THAI TOKO ENGINEERING CO.,LTD.
1
Environment management procedure
Thai toko have 5 procedure method for environment management system
•
•
•
•
•
Environment policy ( นโยบายด้ านสิ่ งแวดล้อม )
Planning ( การวางแผน )
Implement and operation ( การดาเนินการ )
Checking and corrective action ( การตรวจสอบและแก้ไข )
Management review ( การทบทวนระบบการจัดการ )
2
Environment management procedure
Continuous
improvement
Review
Policy
Checking and
correct
Planning
Implement
3
Environment management procedure
1.
Environment policy
-
comply with Thai regulation
control pollution, reduce environment impacts, encourage energy saving
use standard for waste reducing
always review and appraisal environment management system for
improvement system
environment management is duty of all staff
encourage and build a good mind for environment management to staff , sub
contactor.
4
Environment management procedure
2.
Planning ( Objective and target )
Objective and target for our company is environment impacts reducing
-
reduce air pollution
reduce water pollution
reduce sound pollution
We use any practice for our target
-
reject ( Avoid the use , avoid pollution )
reduce ( Reduce waste from operation processing and reduce natural resource usage )
reuse ( Reuse waste by recycle processing )
repair ( Always maintain equipment for a long time usage )
5
Environment management procedure
3.
Implement and operation
3.1 Organization chart
Main structure
Environment controlling Organization chart ( Thai staff )
k. prasarn
k. anon
k. surapong
section manager
Division manager
section manager
แผนกวิศวกรรม
k. mengkuang , k. chanchai
Asst. manager
Bangpakong,Rayong
k. piyathape, k. nopporn
Project manager
Navanakorn
k. thapenarin
Project manager
Prajinbure,chachengsao
k. prapon
Project manager
Bangkok
k. sittisak
Project manager
Site manager
engineer , supervisor
Site manager
engineer , supervisor
Site manager
engineer , supervisor
Site manager
engineer , supervisor
Subcontactor
Subcontactor
Subcontactor
Subcontactor
6
Environment management procedure
3.
Implement and operation
3.2 Duties and responsibilities
A. Division manager, Section manager, Assistant manger
responsibilities for
over all environment management system
initial set up new environment management policy
planning system
checking and management review
7
Environment management procedure
3.
Implement and operation
3.2 Duties and responsibilities
B. Project manager
responsibilities for
environment management system for project construction
quality control on environment management plan
checking and review plan to support customer policy
recommend operation and plan to staff and sub contactor
8
Environment management procedure
3.
Implement and operation
3.2 Duties and responsibilities
C. Site manger, engineer , supervisor
responsibilities for
morning talk meeting with staff and sub contactor
training and inform plan for operation
solve the environment problem
site checking
corrective action
9
Environment management procedure
3.
Implement and operation
3.2 Duties and responsibilities
D. Sub contactor
responsibilities for
morning talk meeting
follow up operation plan
machine checking and maintenance
inform the problem to site manager ,site engineer
Inform dangerous chemical data for using to site manager , site engineer
corrective action from engineer checking
10
Environment management procedure
3.
Implement and operation
3.3 Operation for site construction
A. reducing environmental impact of dust pollution
-
reduce welding process , cut process
sprinkle water on excavation process area and construction area 2 time per day
-
provide ventilation fan or vacuum to reduce the dust diffusion
site cleaning every day
provide scraps location
wheel cleaning before back from site construction
11
Environment management procedure
3.
Implement and operation
3.3 Operation for site construction
B. reducing environmental impact of noise pollution
-
Day working only for loudly job ( if need ,will have standard to control )
Checking the machine is in good condition, not exceed noise standards
Follow the maintenance tools and equipment manual continued
C. reducing environmental impact of wastewater
-
have toilet enough to support staff and worker
have preliminary waste water treatment system for toilet
have preliminary grease filter system for kitchen
12
Environment management procedure
3.
Implement and operation
3.3 Operation for site construction
D. reducing environmental impact of garbage
-
Sort of waste material as to the color receiver
Green bins for decompose waste that can not be
recycled such as toilet paper fraction
Red bins for hazardous waste such as contaminated
chemical clothes, Fluorescent Lamp, Color cans,
and battery.
13
Environment management procedure
3.
Implement and operation
3.3 Operation for site construction
D. reducing environmental impact of garbage
Blue bin for general waste that can not be recycled
such as plastic bag, foam
Yellow bins for recycling waste such as metal cans,
plastic water glass, bottle glass
14
Environment management procedure
3.
Implement and operation
3.3 Operation for site construction
D. reducing environmental impact of garbage
providing support garbage container with enough construction workers
not leaving garbage in the drainage and sewer water
not leave any remnants from work place in the disallowed area
not burn any garbage in construction area
providing workers responsible for collecting garbage in the proper area
trying to order materials to fit with the size of the closest size
collect materials properly to decrease the fragment of before-use-materials
15
Environment management procedure
3. Implement and operation
3.3 Operation for site construction
E. reducing environmental impact of dangerous chemical
-
-
Leading the hazardous chemicals to use , must notify the site manager before
every time
Arranged hazardous materials locations or storage any toxic, hazardous,
inflammable or explosives materials for security , leakage and contamination
training staff and worker for chemical using
-
study labels of any hazardous or poison materials before use
have prevention method when occur accident from chemical using
-
16
Environment management procedure
4.
Checking and corrective action
-
5.
Monitoring and measurement in the activities which cause environmental
impact
Corrective and preventive action in what is not follows the bound.
Monitoring the effectiveness of the corrective action and prevention
Management review
-
Review environmental management system by senior executives of the
organization
continuous updates to ensure effective environmental management of
organizations.
17
Environment management procedure
Continuous
improvement
Review
Policy
Checking and
correct
Planning
Implement
18
Download