ODS Banks Management and Destruction in Brazil Who are we? Essencis is the No 1 company in Brazilian environmental services Market Started in 2001 and operates nationwide 7 Landfills (hazardous and non-hazardous) 2 Co-processing facilities 1 High Temperaure incinerator 3 Environmental Engineering offices 4 WEE Demanufacturing facilities 2 Thermal Dessorption Units Final destination for about 2.8 million tonnes of waste/year 800 Direct employees Quality, Safety and Environmental certified Operations Flow of ODS in Brazil Refrigeration Servicing Sector Utility Energy Efficiency Programs (200,000 Units/yr) Federal Refrigerator Replacement Program (1,000,000 units/yr) National Waste Management Program (2,000,000 units/yr) Reverse Manufacturing Facilities Chiller Replacements Foam Processing Facilities Reclaim Centers Qualified ODS Destruction Facility (Hazardous Waste Incinerator) Flow of ODS in Brazil Refrigeration Servicing Sector Utility Energy Efficiency Programs (200,000 Units/yr) Federal Refrigerator Replacement Program (1,000,000 units/yr) National Waste Management Program (2,000,000 units/yr) Reverse Manufacturing Facilities Chiller Replacements Foam Processing Facilities Reclaim Centers Qualified ODS Destruction Facility (Hazardous Waste Incinerator) Essencis Actual Business Essencis Future Business National Initiatives Legislation and government actions: CONAMA* resolutions about ODS recovery and licensing system ANEEL** resolution that mandated funding (0.5% NOR) for “Energy Efficiency Programme”, creating conditions for fridge replacement initiatives. 200,000 fridges in past 3 years ABNT – Standard for Demanufacturing of Refrigeration equipment National Waste Policy – To be approved by end 2010 This legislation will create obligations for manufacturers and importers concerning collection and recycling WEEE “Old fridges replacement plan” - This program will replace about 10 million fridges over 5 to 10 years - Estimated total CFC collection about 3,000 to 5,000 tonnes *CONAMA – National Environmental Council ** ANEEL – National Electric Energy Agency *** ABNT – National Association for Standardization Step by Step Solution (Reverse Manufacturing) US$ 2 million $ - Investment - CFC Recovered US$ 25,000 $$$ US$ 5,000 $ Step 1 Step 2 + Oil degassing $ $$$$ $ $$$ $$$$ $$$ Step 3 Step 4 + Mechanized Dismantling + PU Panels Degassing + “All in one” equipment solution CFC from refrigeration circuit Manual Dismantling >200.000 /year >50.000 /year Up to 50.000 Fridges/Year US$ 10 milion Location of Facilities ESSENCIS AM (Starting Operation) (Boa Vista/RR , Rio Branco/AC & Porto Velho/RO) ESSENCIS MG (Opening October/2010) ESSENCIS RJ (Magé –RJ – Start 2011) Oxil (Paulínia/SP) Industria Fox (Cabreúva/SP – Under construction) ESSENCIS SP (Taboão da Serra/SP) ESSENCIS PR (Curitiba/PR) GTZ Bi-lateral Cooperation Underway Whirlpool (Joinville/SC) Introdution of Demanufacturing Technology: Status ESSENCIS AM (Step 1) ESSENCIS MG (Step 2) ESSENCIS RJ (Step 2) OXIL (Step 1) INDUSTRIA FOX (Step 4) ESSENCIS SP (Step 2) ESSENCIS PR (Step 3) GTZ Bi-lateral Cooperation Underway – Step 4 WHIRLPOOL (Step 1) ODS Destruction in Brazil Incineration at Hazardous waste incinerators 22 facilities in the country, Installed capacity about 75,000 tonnes/year 7 Capable to deal with CFC, with minor investment in specialized burners (US$ 500.000) UNDP is finalizing report on current destruction capacity in Brazil Potential Technology: Essencis Research on “Non Thermal destruction” Hazardous Waste Incinerators Cinal Cetrel Lumina (Mal. Deodoro - Haztec Tribel Servatis Basf Fonte: ABETRE – 2009 (Guaratinguetá (Cosmópolis - (Camaçari - BA) (Belford Roxo - RJ) (Resende – RJ) - SP) ESSENCIS ABL AL) (Taboão da Serra –SP) SP) ODS Destruction Export model not suitable for Brazil: •Why export given sufficient local destruction capacity? •Legal issues Challenges Cost : Initial Investment - Possible source of funding: MLF; GEF; bi-lateral cooperation Sustainable Operation - Possible sources of funding: Partnership with UNDP - MDG Carbon Facility Carbon Market Incineration in Brazil vs offsets under CAR and VCS Current Scenario Revenues Costs Recovered Materials CFC from Refrigeration circuit Demanufacturing Services (EE Law) Logistics Unsustainable Scenario Revenues Costs Sustainable Revenues CO2 US$ 3/ton CO2 US$ 15/ton (and desirable) Scenario Costs Local CFC destruction CFC from Foam degassing Recovered Materials CFC From Refrigeration circuit Demanufacturing Services Logistics Good carbon market revenue is essential to develop a sustainable business Conclusion Best way to start is “Step by Step” Export model not suitable for Brazil MLF; GEF; Bi-lateral cooperation: donor grant is crucial for start up activities / initial investment National Energy Efficiency Utilities Programme is an important catalyst for the market Government, Implementing agencies and private companies must join efforts to develop the national market Carbon financing is critical to sustainability of CFC collection from Foam and CFC destruction activities In the future, Compliance Carbon Market rather than Voluntary Carbon Market: better price levels and predictability Roberto Castillo Lopes rlopes@essencis.com.br www.essencis.com.br Special thanks to: UNDP Montreal Protocol and Chemicals Unit UNDP MDG Carbon Facility team UNEP Ozone Secretariat Brazil Minister of Environment, MMA