TENDER BRIEFING ON THE APPOINTMENT OF CONSULTANT TO STUDY AND PROPOSE POWER QUALITY UPGRADE AT MIMOS FAB MIMOS BERHAD MIMOS BERHAD 11th Feb 2011 www.mimos.my © 2006 MIMOS Berhad. All rights reserved. MIMOS CAMPUS : POWER DISTRIBUTION SYSTEM Fab TNB SUBSTATION HT ROOM – FAB 2 West Block HT ROOM - MIMOS East Block Public Block Cafe Block HT ROOM – FAB1 Entrance HT ROOM –INTEC www.mimos.my © 2006 MIMOS Berhad. All rights reserved. Version 2.0 2010 www.mimos.my © 2006 MIMOS Berhad. All rights reserved. Version 2.0 PROBLEM STATEMENT • PRESENT SYSTEM & LIMITATION -Electrical system - 2 x 11 kv feeders. Vulnerable to power quality incidents as 11 KV is not CLEAN -2 x 350KVA Diesel gen set for fab 1 and fab 2 , are to support emergency lightings, scrubber and other emergency system -Small UPSs to support some critical production equipment. NO back up power for production. -1800A Switch board for Chillers and other facilities equipment under capacity www.mimos.my © 2006 MIMOS Berhad. All rights reserved. Version 2.0 PRESENT POWER DISTRIBUTION AND UTILIZATION AT WAFER FAB 2 FACILITY SUPPORT 800KW 250KW 250KW MCC MAIN 250KW DB ESSETIAL DB UPW MSB 1 415V 2500A ACB Transformer 1 11KV/433V 2.5MVA 11KV 630A VCB DB WW PLANT Feeder 1 1.55MW Feeder 2 PRODUCTION 451KW DB ETCH 360KW DB DVR 250KW DB LITHO 430KW DB DIFFUSION 1 200KW DB DIFFUSION 2 500KW DB THIN FILM MSB 2 Transformer 2 11KV/208V 1.5MVA 11KV 630A VCB NOTE : WAFER FAB 1 HAS SIMILAR CONFIGURATION. THE CURRENT LOADING IS LOW DUE TO NO PRODUCTION 2.2MW www.mimos.my 208 2500A ACB © 2006 MIMOS Berhad. All rights reserved. Version 2.0 WHAT WE PLAN TO DO…. • Undertake study to improve the power quality for wafer fab. • To propose best option(s) with • technically feasible • cost effective measures • Best practical implementation plan www.mimos.my © 2006 MIMOS Berhad. All rights reserved. Version 2.0 PROPOSED UPGRADING OF THE POWER SYSTEM Incomer Feeder 1 11KV 630A VCB Feeder 2 11KV 630A VCB HT 11KV 630A VCB Step down Transformer 2 11KV/208V 1.5MVA 208V 2500A ACB Step down Transformer 1 11KV/433V 2.5MVA 415V 2500A ACB LT Gen set UPS Version 2.0 DB THIN FILM DB DIFFUSION 1 DB LITHO DB DVR DB DIFFUSION 2 © 2006 MIMOS Berhad. All rights reserved. DB ETCH MCC MAIN DB UPW DB WW PLANT www.mimos.my DB WW PLANT DB ESSETIAL Batteries SCOPE OF THE TENDER PROCESS Mandatory scope Optional scope Project management Preliminary Capacity study Proposals review Prepare tender document + drawings Tender evaluation www.mimos.my © 2006 MIMOS Berhad. All rights reserved. Version 2.0 SITE VISIT DATE TIME Friday 11th Feb 11 After tender briefing Monday 14th Feb 11 11.00am Wednesday 16th Feb 11 11.00am Thursday 17th Feb 11 11.00am Assemble at MIMOS Lobby: Contact person : Kufad/ Norazri www.mimos.my © 2006 MIMOS Berhad. All rights reserved. Version 2.0 FAB 1. The physical maintenance of system is carried out once every 2 years. In view of the current condition, it as recommend that the servicing an Thank you www.mimos.my © 2006 MIMOS Berhad. All rights reserved.