MIMOS BERHAD

TENDER BRIEFING ON THE APPOINTMENT OF
CONSULTANT TO STUDY AND PROPOSE POWER
QUALITY UPGRADE AT MIMOS FAB
MIMOS BERHAD
MIMOS BERHAD
11th Feb 2011
www.mimos.my
© 2006 MIMOS Berhad. All rights reserved.
MIMOS CAMPUS : POWER DISTRIBUTION SYSTEM
Fab
TNB SUBSTATION
HT ROOM – FAB 2
West Block
HT ROOM - MIMOS
East Block
Public Block
Cafe Block
HT ROOM – FAB1
Entrance
HT ROOM –INTEC
www.mimos.my
© 2006 MIMOS Berhad. All rights reserved.
Version 2.0
2010
www.mimos.my
© 2006 MIMOS Berhad. All rights reserved.
Version 2.0
PROBLEM STATEMENT
• PRESENT SYSTEM & LIMITATION
-Electrical system
- 2 x 11 kv feeders. Vulnerable to power quality incidents as 11 KV is
not CLEAN
-2 x 350KVA Diesel gen set for fab 1 and fab 2 , are to support
emergency lightings, scrubber and other emergency system
-Small UPSs to support some critical production equipment. NO back up
power for production.
-1800A Switch board for Chillers and other facilities equipment
under capacity
www.mimos.my
© 2006 MIMOS Berhad. All rights reserved.
Version 2.0
PRESENT POWER DISTRIBUTION AND UTILIZATION AT
WAFER FAB 2
FACILITY SUPPORT
800KW
250KW
250KW
MCC MAIN
250KW
DB ESSETIAL
DB UPW
MSB 1
415V
2500A
ACB
Transformer 1
11KV/433V
2.5MVA
11KV
630A
VCB
DB WW PLANT
Feeder 1
1.55MW
Feeder 2
PRODUCTION
451KW
DB ETCH
360KW
DB DVR
250KW
DB LITHO
430KW
DB DIFFUSION 1
200KW
DB DIFFUSION 2
500KW
DB THIN FILM
MSB 2
Transformer 2
11KV/208V
1.5MVA
11KV
630A
VCB
NOTE :
WAFER FAB 1 HAS SIMILAR CONFIGURATION.
THE CURRENT LOADING IS LOW DUE TO NO
PRODUCTION
2.2MW
www.mimos.my
208
2500A
ACB
© 2006 MIMOS Berhad. All rights reserved.
Version 2.0
WHAT WE PLAN TO DO….
• Undertake study to improve the power quality for wafer fab.
• To propose best option(s) with
• technically feasible
• cost effective measures
• Best practical implementation plan
www.mimos.my
© 2006 MIMOS Berhad. All rights reserved.
Version 2.0
PROPOSED UPGRADING OF THE POWER SYSTEM
Incomer
Feeder 1
11KV
630A
VCB Feeder 2
11KV
630A
VCB
HT
11KV
630A
VCB
Step down
Transformer 2
11KV/208V
1.5MVA
208V
2500A
ACB
Step down
Transformer 1
11KV/433V
2.5MVA
415V
2500A
ACB
LT
Gen set
UPS
Version 2.0
DB THIN FILM
DB DIFFUSION 1
DB LITHO
DB DVR
DB DIFFUSION 2
© 2006 MIMOS Berhad. All rights reserved.
DB ETCH
MCC
MAIN
DB UPW
DB WW PLANT
www.mimos.my
DB WW PLANT
DB ESSETIAL
Batteries
SCOPE OF THE TENDER PROCESS
Mandatory scope
Optional scope
Project management
Preliminary
Capacity study
Proposals review
Prepare tender document +
drawings
Tender evaluation
www.mimos.my
© 2006 MIMOS Berhad. All rights reserved.
Version 2.0
SITE VISIT
DATE
TIME
Friday 11th Feb 11
After tender briefing
Monday 14th Feb 11
11.00am
Wednesday 16th Feb 11
11.00am
Thursday 17th Feb 11
11.00am
Assemble at MIMOS Lobby:
Contact person : Kufad/ Norazri
www.mimos.my
© 2006 MIMOS Berhad. All rights reserved.
Version 2.0
FAB 1.
The physical maintenance of system is carried out once every 2 years. In view of the current condition, it as recommend that the servicing an
Thank you