The Downer Energy and Emissions Measure Energy Efficiency Opportunities Workshop 2011 Lionel Pero 80 3400 850 50 6 $ 7.5 billion Delivering Sustainable Value (Idemitsu) Delivering Whole-of-Lifecycle Mining Solutions Delivering Sustainable Value “You Can’t Manage What You Can’t Measure” Litres / Bank Cubic Metre does not take into account: • Differences between mine sites • Changes within individual mines • Changing haul routes, inclines & distances • Increasing dump heights or pit/underground depths Key Performance Indicator Litres / Bank Cubic Metre Coal Mine Hard Rock Mine Factor Difference 4.85 29.18 6.0 Delivering Sustainable Value The Downer Energy & Emissions Measure Indicators: GJ & tCO2-e 1. GJ/tonne-km for haul trucks, water trucks & graders TM _ tonnage moved x equivalent flat haul 2. GJ/tonne material moved for excavators, dozers & ancillary plant Dump Location Considers: • Fuel types • Plant types, models & fuel burn • Material type, volume & mass • Source & destination locations • Distance moved & elevation change Dig Location Key Performance Indicator Coal Mine Hard Rock Mine Factor Difference Truck = litres / (tonnage moved x equivalent flat haul) 0.054 0.058 1.1 Excavator and ancillary = litres / total tonnage moved 0.235 0.386 1.6 Dig Location Delivering Sustainable Value Delivering Sustainable Value Tracking Project Energy Performance Increase in digger and truck shifts to catch up on coal & O/B losses after floods 0.00600 0.0060 0.00500 0.0050 0.00400 0.0040 0.00300 0.0030 0.00200 0.0020 Non-haul GJ/tonne 0.00100 During power plant shut-down period, focussed on moving waste over short distances to the in-pit dumps 0.0010 Haul GJ/tonne.km 0.00000 0.0000 Month 12 Month 11 Month 10 Month 9 Month 8 Month 7 Month 6 Month 5 Month 4 Month 3 Month 2 Month 1 Low utilisation of dozer push & excavator production. Delivering Sustainable Value 0.00490 Haul Trucks, Water Trucks & Graders (GJ/tonne-km) 0.00420 GJ / tonne.km 0.00350 0.00280 0.00210 0.00140 0.00070 0.00000 Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Excavators, Dozers & Ancillary Plant (GJ/tonne material moved) 0.01500 GJ / tonne 0.01200 0.00900 0.00600 0.00300 0.00000 Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Delivering Sustainable Value Factors Influencing Energy Intensity • Rock hardness & fragmentation • Density of material excavated & hauled • Material moved by blasting • Fleet selection, including size of equipment • Mine planning, production scheduling, pit design & dump design • Haul road optimisation (length, gradients, design & materials) • Haul road & dump configuration optimisation • Plant & equipment operator behaviour • Plant & equipment technical efficiencies Delivering Sustainable Value Delivering SustainableValue Greenhouse Gas Efficiency at Commodore Mine 0.00050 0.00040 0.00045 0.00035 0.00040 0.00030 0.00035 0.00025 0.00030 0.00020 Non-haul GHG tCO2-e/tonne 0.00025 0.00015 Haul GHG tCO2-e/tonne.km 0.00020 0.00010 FY 05/06 FY 06/07 FY 07/08 FY 08/09 FY 09/10 FY 10/11