CSZ Exercise 2016
Map : Cascadia Subduction Zone Fault Line
The CSZ 2016 Exercise is a progressive exercise series commencing in early 2014 with building block training and exercise ramp-up events culminating in a comprehensive four day EOC-to-
EOC functional exercise in the
Spring 2016.
Focus on coastal jurisdictions and tribes along with select I-5 corridor and Eastern
WA jurisdictions.
2
CSZ Exercise 2016
Scenario Overview
Magnitude 9.0 earthquake.
Direct impacts to States of Oregon and
Washington.
Complete rupture of the 800-mile fault line.
Impacts affecting over 140,000 square miles.
Severe ground shaking lasting up to 5 minutes.
20’ to 80’ tsunami impacting the entire coastline within 15-30 minutes.
Numerous aftershocks with several of
M7.0+.
Washington
Oregon
California
Crescent City
Simulation of a M9.0 CSZ earthquake. Graphic provided by Pacific Northwest Seismic Network
3
CSZ Exercise 2016
CSZ Earthquake/Tsunami Impacts
15,000 deaths; tens-of-thousands injured throughout three coastal states.
3 million households impacted.
800,000 requiring shelter.
Extreme transportation impacts to I-5 corridor west to coastline. Coastal communities isolated.
Major extended disruptions to critical infrastructure lifelines (electricity, refined fuels, water supply, etc.)
Tremendous need for critical life-saving and life-sustaining resources – extensive mutual aid needed.
Map : Highway Road Segments in the Cascadia Region with
Expected Damages ranging from Slight to Complete under the
90 th -Percentile Case Scenario.
4
CSZ Exercise 2016
Strategic Goals:
Enhance Joint Operations – Success in managing the consequences of a wide-area catastrophic disaster hinges on how well local, state, tribal, and federal actions and the whole community are integrated and synchronized.
The desire is for all exercise players at all levels to gain an appreciation of the sheer necessity of joint unified action.
Instill an operational mindset shift to ‘catastrophic’ – Our elasticity and ability to stretch to handle the impacts of a catastrophic disaster is a daunting challenge. We need to plan and exercise for the worse.
Planning Springboard – The lessons learned in the CSZ 2016 Exercise will be used to develop and/or update CSZ and related catastrophic disaster response plans at all levels and to inform future exercise design.
5
CSZ Exercise 2016
Exercise Mission Statement:
Collaboratively plan, design, and conduct a comprehensive functional exercise that tests local, state, tribal, and federal catastrophic earthquake plans to improve our joint-interagency and whole community ability to effectively respond to a widearea, catastrophic earthquake and tsunami caused by a rupture of the Cascadia Subduction Zone (CSZ) fault along the Northwest coast of the United States.
Draft-proposed
6
CSZ Exercise 2016
Exercise Participants (Anticipated)
WA Coastal counties, cities, and tribes
Select WA I-5 Corridor and East-ofthe-Cascades Counties (TBD)
WA EMD
WA state agency ESFs
Supporting States (AK and ID)
FEMA Region X and federal agency
ESFs
FEMA National Response
Coordination Center (NRCC)
Department of Defense
NORTHCOM, NRNW, NGB, etc.
Nongovernmental Organizations
(VOAD)
Major private sector partners
Private and public critical infrastructure lifeline providers
International partners (e.g. British
Columbia)
Public (e.g., Tsunami Evacuation
Drills - TBD)
7
CSZ Exercise 2016
The CSZ 2016 Functional Exercise will test EOC-to-EOC ability to perform tasks and objectives (TBD) associated with all Response Core Capabilities:
Critical Transportation
Environmental Response / Health and Safety
Fatality Management
Infrastructure Systems
Mass Care Services
Mass Search and Rescue Operations
On-Scene Security and Protection
Operational Communications
Operational Coordination
Planning
Public Health and Medical Services
Public Information and Warning
Public and Private Services and
Resources
Situational Assessment
8
CSZ Exercise 2016
Exercise Planning Timeline
Socialize
Concept
Scenario
Document
Extent of
Play
Agreements
2013 2014
EXPLAN
‘Ground Truth’
Document
EEGs
C&E
Training
CSZ 2016
Exercise
2015 2016 2017
Exercise
Series ‘Kick
Off’ Meeting
Concept and
Objectives
Meeting
Initial
Planning
Meeting
Mid-Term
Planning
Meeting
MSEL
Synchronization
Meetings
Final
Planning
Meeting
After Action
Report
Published
Please note: A number of ramp-up events to include training courses, seminars, workshops, tabletops (all TBD) will be conducted prior to the culminating functional exercise.
9
CSZ Exercise 2016
Why an Exercise in 2016?
Culminating point to many recent CSZ and catastrophic earthquake planning efforts at the local, state, tribal, and federal level.
Allows adequate time to update plans, policies and procedures; also allows time to build and design a complex exercise with many participants.
Implement a building block approach to train and exercise staffs on EOCspecific plans and procedures and joint-operations.
Significant amount of ‘areas for improvement’ identified in previous local and larger exercises (e.g., Evergreen Quake Exercise Series).
10
CSZ Exercise 2016
Exercise Parameters – the concept as it stands now:
A four-day response functional exercise (FE).
Focus on WA coastal communities with select communities along I-5 corridor and Eastern WA.
EOCs at all levels playing and activated to highest level – city, county, state, tribes, feds, private sector.
All field-play simulated (with possibility of some actual field elements TBD) via
Injects-MSEL distributed via Control/Simulation cell.
Date: late May or early June 2016 (exact days TBD).
Goal of 24-hour play. Options of 12-hour or 8-hour play each day (TBD).
Local level of participation each day is objectives driven.
Plenty of TBD based on partner input
11
CSZ Exercise 2016
Considerations
The following are some of the major issues that will need to be determined in designing the CSZ 2016 Functional Exercise:
Include components of Continuity of Operations into the exercise?
Duration of EOC play each day (24hrs, 12hrs, 8hrs)?
Telecommunications outage play during the exercise or in a separate drill?
Exercise length > 4 days?
Type of ramp-up events (trainings, seminars, etc.)?
Jurisdictions not playing in the exercise will be highly encouraged to serve on the Exercise Design Team and to assist neighboring communities that are playing
12
CSZ Exercise 2016
The Risk:
Need to recognize funding and staff limitations and other constraints in the design and conduct of this exercise and associated events.
13
CSZ Exercise 2016
The path forward over next several months:
Socialize concept to local, state, tribal, federal, and other partners.
Gather comments from exercise participants.
Conduct “Kick-off” meeting in January/February 2014.
Brief and discuss the exercise concept with whole community
Discuss the exercise planning/design governance structure
Solicit candidates to serve as exercise design team leaders
Discuss Extent-of-Play Agreement (XPA) parameters
Solicit and then vote on the exercise name and logo
14
CSZ Exercise 2016
For More Information Contact:
WA EMD
Name: Brittany Ginn
Position: State Exercise Program Manager
Email: brittany.ginn@mil.wa.gov
FEMA Region 10
Name: Stephen Simerly
Position: Regional Exercise Officer
Email: stephen.simerly@fema.dhs.gov
15
CSZ Exercise 2016
i
16