CONTENTS 1 About HUST 5 Pilot Scheme Content 2 Main Theme of Pilot Scheme 6 Schedule Arrangement 3 Existing Foundation 7 Protective Measures 4 Pilot Scheme Objectives 8 Expected Results 2 1. About HUST The Harbin University of Science and Technology (HUST) is the largest polytechnic university in Heilongjiang. HUST is also one of the top ten key universities in the province. The university places great emphasis on the specialty of engineering and a combination of engineering and science, with coordinated development of disciplines of economics, management, philosophy, literature, law and education. HUST delivers the finest teaching-research performance cultivating tens of thousands of talents every year. Implementation of Informatization Pilot Scheme (1st Batch) 2012 Implementation of Excellent Engineers Training Scheme (2nd Batch) 2011 Typically Experienced University For National College Graduates’ Employment (awarded among 50 national universities) 2011 Excellent University in Undergraduate Teaching Evaluation by the Ministry of Education 2003 3 2. Main Theme of Pilot Scheme To Construct a Service-Centric Digital Campus HUST has proposed the above main theme leveraging the current technology development features and the existing facilities in the campus. We strike to explore and construct a service-centric digital campus, which will promote the development of university. 4 3. Existing Foundation Approved Implementation of Informatization Pilot Scheme (1st Batch by Ministry of Education) Elected China Higher Education Information Academy Committee Unit Served as Heilongjiang Education Information Academy Director Unit from 2003 - 2011 5 3. Existing Foundation 1. HUST puts great emphasis on education informatization implementation 1. Professional team for informatization 2. Basic facilities for informatization implementation ready 2. Ensured sufficient budget 1.Comprehensive hardware ready for implementation of education informatization 2.Abundant digital teaching resources 3.1st in the province with full-feature OneCardPass system 6 3. Existing Foundation 1. Bandwidth and Information Point Status Total Bandwidth of HUST: 5300Mbps (1)Campus Exit Bandwidth: 3300Mbps (Unicom 1000M, China Telecom 500M, Education Net 500M, IPv6 1000M, China Mobile 300M) (2)Unicom Exit Bandwidth: 2000M Unicom Exit Bandwidth 2000M China Telecom 500M China Mobile 300M 7 Unicom 1000M Education Net 500M IPv6 1000M 3. Existing Foundation 71 Local & Overseas Renowned Universities 300+ Open Courses Accumulated 3600+ Lecture Hours • Electromechnics Lecture Series is awarded National Excellent Resource Sharing and is available on iCourse website • Lectures such as Basic Principles of Marxism and Basis of Computer Engineering are available online • 3 excellent lectures and several micro lectures have also gone online • The University has owned up to 31,000 clips for use within the campus • Daily view reaches 10,000+ and accumulated 10 million views • 6370GB E-books storage, 140,000 local and foreign periodic volumes, 22 literature databases, 2 self-established databases 8 3. Existing Foundation Campus Card Application System Canteen Payment Management Entrance & Attendance Library Loan System Web Touch Screen & Mobile Lost & Found Bath Management & Power Supply 4th & 6th Grade Examination Bank Saving System Self-Service Water Selling & Results Printout Auditorium Payment & ID Management Hospital Interface Self-Service Payment Campus Bus Payment Campus Storehouse & Network Payment Auto & Self-Service Transfer Terminal Hospital Medical Check Management Auditorium & Laundry Payment Student Medical Check Monitoring Computer Room Payment Management Union Gym Management Payment Management Applications Authentication Applications 9 Interface Applications Integrated Self-Service Applications 3. Existing Foundation 1. Great emphasis is put on education informatization construction 2. Comprehensive basic facilities ready 3. A wide range of informatization applications 1.Digital campus applications support teaching, research, management, etc. 4. Completion unified data platform construction 2.Operation of of online teaching platform for experience accumulation 3.Cooperative office system in use enhances management informatization 10 3. Existing Foundation 4. Completion of unified data platform construction Unified Information Portal Basic Campus Analysis System • Campus OneCardPass System • Undergraduate Management System • Library System • Research Management System • Email System • Postgraduate Management System • Cooperative Office System • HR Management System • Property Management System • Student Employment System • Finance Management System ……. Sharing Database Unified Authentication System Information Standardization 11 3. Existing Foundation 1. Great emphasis is put on education informatization construction 2. Comprehensive basic facilities ready 3. A wide range of informatization applications 1.Red website as vehicle gives full play to network education 2.Set up online TV to enhance influence of HUST in the society 4. Completion of production unified“I data • Student’s MV Believe”platform reaches moreconstruction than 20 million views nationwide • Broadcast of 2 student DV works on China Central Television • Abundant high-quality clips are highly recommended on major video-sharing websites 5. Cloud computing construction has got primary success 3. Establishment of online school history database 6. Active promotion of campus network culture 12 4. Pilot Scheme Objectives Focus on building service-centric digital campus by constructing the campus network, management information system and personalized self-learning platform to assist the university in improving the level of engineering talent cultivation for the society. Provide information services and improve service quality to offer better services Implement management informatization and improve management efficiency for better management service 13 5. Pilot Scheme Content In the next phase of the digital campus project, our university strives to build a service-centric digital campus with online education service and core integrated services such as teaching, management, research, logistics, industries and community life, based on the network resources, integration and sharing of educational information and resources service platform. 14 5. Pilot Scheme Content (1) Promote the comprehensive campus wireless network construction (2) Initiate the Mobile Campus Project 15 Launch the Application 5. Pilot Scheme Content (2) Initiate the Mobile Campus Project Click the application and enter the public interface. In the public interface, every user can view the following University News, University Impression, information: Announcements, University Map, Alumni’s Lives, University Online (school activities, school themes and campus news videos). Student ID number is required for login into more university applications. 16 Login Authentication 5. Pilot Scheme Content (2) Initiate the Mobile Campus Project Click the login button on the previous page to enter the login page. Users can use their student numbers passwords for authentication. 17 and 4 Application Categories 5. Pilot Scheme Content (2) Initiate the Mobile Campus Project After authentication, 4 application categories are shown: Learning, Living, Work and Entertainment. Users can view more detailed information by clicking the icons. 18 5. Pilot Scheme Content (1) Promote the comprehensive campus wireless network construction (2) Initiate the Mobile Campus Project Data sharing with the provincial Heilongjiang Learning Network (3) Digital Resources Sharing System 1.Collaborative learning management system upgrade (4) Management System 2.Collaborative student management and service system construction 3.Construction of a social evaluation system of teaching quality 4.Research and collaborative innovation platform construction (5) Integrate the informatization pilot scheme of the Ministry of Education and initiate the independent learning platform construction (6) Network Cultural Platform Construction 1.Student online education platform construction 2.Create the network culture of encouraging innovation 19 6. Schedule Arrangement (1) Initialization Stage(2013.12—2014.3) (2) Comprehensive Implementation Stage (2014.3 —2015.10) (3) Summary and Acceptance Stage (2015.11—2015.12) 20 7. Protective Measures (1) Organizational Protection (2) Investment Protection (3) System Protection 21 (4) Team Protection (5) Indubitable Responsibility 8. Expected Results 1.Design and implement the service-centric digital campus. 2 . Implement the wireless network construction, Mobile Campus Project, digital resources sharing system and self-learning platform, and enhance the school management information system to promote the overall development of the service-centric digital campus. 3.Promote the concept transformation of education and enhance teachers’ information literacy. 4.Publish reports, papers and other research achievements of the pilot scheme. 22 23