Scandpower AS P.O. Box 3, N-2027 Kjeller, Norway Risk management in the Scandinavian railway industry Karl Ove Ingebrigtsen Vice president Denmark Sweden Norway What is risk management? “The systematic application of management policies, procedures and practices to the tasks of communicating, establishing the context, identifying, analysing, evaluating, treating, monitoring and reviewing risk” RISK MANAGEMENT GUIDELINES Companion to AS/NZS 4360:2004 • Risk management is the human activity which integrates – – – recognition of risk, risk assessment developing strategies to manage risk mitigation of risk using managerial resources Why risk management • Risk management is a guide to ensure use of knowledge, experience, understanding, common interest, contribution from all to obtain the common goal of the success… • The success is due to the following benefits of risk management: – – – fewer surprises due to identifying all unwanted events involvement of all parties give access to experience improved information for all decision making Risk management in Scandinavia • Motivation and foundation – – – – • Experience with risk management – – • The Oil & Gas experience Authority requirements General safety awareness Learned by accidents Formal requirement in Norway since the 90’ Applied on all railway systems Bad risk management in several railway projects – – – – Loss of production Loss of reputation Economical losses Loss of assets From Ad-hoc operations to integrated risk management Comprehensive and integrated Proactive Reactive Ad-hoc • Occasional focus on different mishaps • Treat symptoms as they occurs • Less lessons learned from operational experience • Identifies causes to mishaps • Corrections made on experienced problems • Proactive strategy for risk management • Extensive risk analysis of the operation • Judge risk according to strategies and targets • risk management integrated in the business management processes in the company • Establishment of riskindicators in critical processes of the operation • Continuos surveillance and risk management for changes and improvement in the organisation Risk management requirements • Railway System Signaling system EN 50126 (RAMS) • • EN 50159 (Communication) Sub-system Component EN 50128 EN 50129 (Software) (System safety) • • • • The specification and demonstration of Reliability, Availability, Maintainability and Safety (EN-50126 RAMS) Risk Management AS/NZS 4360 E&P Forum, Guidelines for the Development and Application of Health, Safety and Environmental Management Systems. SAMRAIL EN 50128 Software EN 50129 System safety EN 50159 Communication The risk management models The RAMS standard Concept (1) Modification and retro-fit (13) System definition & application Conditions (2) System Acceptance (10) Operation and maintenance (11) Risk Analysis (3) Performance Monitoring (12) System requirement (4) Apportionment of system requirements (5) Design and implementation (6) Manufacture (7) System Validation (Including safety acceptance and commissioning) (9) Installation (8) De-commissioning and disposal (14) The risk management models E&P model policy and strategic objectives organisation, resources and documentation review leadership and commitment implementation and monitoring planning audit evaluation and risk analysis The main model applied ANALYSE RISKS EVALUATE RISKS TREAT RISKS MONITOR AND REVIEW IDENTIFY RISKS RISK ASSESSMENT COMMUNICATE AND CONSULT ESTABLISH THE CONTEXT COMMUNICATION AND COOPERATION WITH ALL INVOLVED PARTIES ESTABLISH THE CONTEXT · · · · · The internal Context The external Context The Risk Management Context Develop Criteria Define the Structure IDENTIFY RISKS · · · What can happen? When and where? How and why? Determine consequences Determine likelihood Determine Level of Risk EVALUATE RISKS · · Compare against criteria Set priorities Treat Risks MONITOR AND REVIEW COMMUNICATE AND CONSULT ANALYSE RISKS Identify exsisting controls • Internal Management Train operation control Marked department Internal bodies, safety office Planning department Engineer Conductor • External handicapped Labour union Authorities Maintainers Press Travellers No Yes TREAT RISKS · · · · Identify options Assess options Prepare and implement treatment plans Analyse and evaluate residual risk Belated wisdom is not allowed Establish the context ESTABLISH THE CONTEXT · · · · · The internal Context The external Context The Risk Management Context Develop Criteria Define the Structure IDENTIFY RISKS · · · What can happen? When and where? How and why? Identify exsisting controls Determine consequences Determine likelihood Determine Level of Risk EVALUATE RISKS · · Compare against criteria Set priorities Treat Risks No Yes TREAT RISKS · · · · Identify options Assess options Prepare and implement treatment plans Analyse and evaluate residual risk MONITOR AND REVIEW COMMUNICATE AND CONSULT ANALYSE RISKS Identification of risk by identification of barriers Barriers Cause Event ESTABLISH THE CONTEXT · · · · · Cause 1 The internal Context The external Context The Risk Management Context Develop Criteria Define the Structure Accident Cause 2 Cause 3 IDENTIFY RISKS · · · Consequence 1 Consequence 2 Consequence 3 What can happen? When and where? How and why? Cause 4 Consequence 4 Identify exsisting controls Determine consequences Determine likelihood Determine Level of Risk EVALUATE RISKS · · MONITOR AND REVIEW COMMUNICATE AND CONSULT ANALYSE RISKS Fault tree analysis Event tree analysis Consequence 1 Loss of critical function Technical or operational failure/fault Accident Consequence 2 Compare against criteria Set priorities Treat Risks No Yes Reduce the probability of failure Reduce the consequence of failure Reduce loss TREAT RISKS · · · · Identify options Assess options Prepare and implement treatment plans Analyse and evaluate residual risk Analysis of safety barriers Barriers: Design Maintenance procedures Operational procedures Risk analysis and evaluation – the strength of the barriers · · · · · The internal Context The external Context The Risk Management Context Develop Criteria Define the Structure IDENTIFY RISKS · · · What can happen? When and where? How and why? Determine consequences Determine likelihood Determine Level of Risk EVALUATE RISKS · · MONITOR AND REVIEW COMMUNICATE AND CONSULT ANALYSE RISKS Identify exsisting controls Frequency of occurrence of a hazardous event ESTABLISH THE CONTEXT No barriers present One organizational barrier Several independent organizational barrier One physical and one or several organizational barriers Several independent physical barriers Insignificant No • Physical barrier • Functional barrier • Symbolic barrier • Immaterially barrier Yes TREAT RISKS · · · · Identify options Assess options Prepare and implement treatment plans Analyse and evaluate residual risk Critical Catastrophic Physical / Technical barrier Compare against criteria Set priorities Treat Risks Marginal Severity Levels of Hazard Consequence The results and follow up ESTABLISH THE CONTEXT · · · · · The internal Context The external Context The Risk Management Context Develop Criteria Define the Structure IDENTIFY RISKS · · · What can happen? When and where? How and why? Determine consequences Determine likelihood Determine Level of Risk EVALUATE RISKS · · Compare against criteria Set priorities Treat Risks No Yes TREAT RISKS · · · · Identify options Assess options Prepare and implement treatment plans Analyse and evaluate residual risk MONITOR AND REVIEW COMMUNICATE AND CONSULT ANALYSE RISKS Identify exsisting controls HAZARD log (Database / Excel) • Railway system • Hazard • Risk reduction • Influence on RAMS • Reference document for treating risk • Responsible for closing action • Verification of closing action Monitoring and review ESTABLISH THE CONTEXT · · · · · The internal Context The external Context The Risk Management Context Develop Criteria Define the Structure Notice IDENTIFY RISKS · · · Client What can happen? When and where? How and why? Determine consequences Determine likelihood Determine Level of Risk MONITOR AND REVIEW COMMUNICATE AND CONSULT ANALYSE RISKS Identify exsisting controls Preparation Opening meeting EVALUATE RISKS · · Compare against criteria Set priorities Treat Risks No Yes Collecting facts TREAT RISKS · · · · Closing meeting Identify options Assess options Prepare and implement treatment plans Analyse and evaluate residual risk Preparing report Follow-up The helpful tools Concept (1) Modification and retro-fit (13) System definition & application Conditions (2) System Acceptance (10) Operation and maintenance (11) De-commissioning and disposal (14) Risk Analysis (3) policy and strategic objectives Performance Monitoring (12) System requirement (4) Apportionment of system requirements (5) organisation, resources and documentation review System Validation (Including safety acceptance and commissioning) (9) leadership and commitment Design and implementation (6) Installation (8) implementation and monitoring Manufacture (7) planning IDENTIFY RISKS ANALYSE RISKS EVALUATE RISKS TREAT RISKS MONITORANDREVIEW audit RISKASSESSMENT COMMUNICATEANDCONSULT ESTABLISH THE CONTEXT evaluation and risk analysis