The Thermal Technologies Centre A Collaboration between CPI and Tata Steel. Presentation to the NEPIC Innovation Day 15th November 2011 Gareth Fletcher ©Copyright CPI 2010. All rights reserved Content • Tata RD&T and CPI. Background to our partnership. • The Thermal Technologies Centre • The Innovation Offer. • Opportunity for Questions. From innovation to commercialisation Copyright CPI 2010. All rights reserved Content • Tata RD&T and CPI. Background to our partnership. • The Thermal Technologies Centre • The Innovation Offer. • Opportunity for Questions. From innovation to commercialisation Copyright CPI 2010. All rights reserved Background to the Thermal Technologies Centre? The Thermal Technologies Centre is a Collaboration between CPI and Tata Steel. • To deliver a joint Project to create an open access demonstration and technology facility on the Tata Steel TTC Site. • Which makes available two demonstration facilities/- • FULLY FLEXIBLE GASIFIER • PYROLYSIS UNIT. • Which complement and enhance existing CPI capabilities. • And support the existing Tata Steel Technology Facilities on Teesside. From innovation to commercialisation Copyright CPI 2010. All rights reserved A Linked Skill Set CPI • Process Industry • Background. • Experience/expertise. • Innovation centre model now. • Commercial functions/capabilities. Tata Steel RD&T • Existing High Temperature Pilot Plant Operations •Experience •Services •Space (for more). • H.T. Process Expertise • H.T. Process Technology. From innovation to commercialisation Copyright CPI 2010. All rights reserved Thermal Technologies Centre Inside Tata Steel RD&T From innovation to commercialisation The Tata RD&T Operating Model TRL 2 - 8 High Temperature Process Expertise Measurement and monitoring Modelling Pilot Plant Facilities and Operating Experience Project Management. Skills & Systems Engineering Team of Engineers and Scientists From innovation to commercialisation Tata Steel The Thermal Technologies Centre Operating Model TRL 4 - 7 Tata Steel RD&T High Temperature Process Expertise Client Measurement and monitoring Modelling Pilot Plant Facilities and Operating Experience Project Management. Skills & Systems Engineering Team of Engineers and Scientists From innovation to commercialisation Content • Tata RD&T and CPI. Background to our partnership. • The Thermal Technologies Centre • The Innovation Offer. • Opportunity for Questions. From innovation to commercialisation Copyright CPI 2010. All rights reserved What does the Thermal Technologies Centre do? • Provides expertise and experience in Thermal Process Technology in support of UK competitiveness. • Owns and operates demonstration assets which are available an Open Access Basis; current emphasis is Gasification and Pyrolysis. • Supports the development of high temperature process skills in the NE of England - both Tata Steel and CPI - and enables delivery of these skills where required. • Provides a site that can accommodate additional assets - where these meet specific customer needs that augment the existing capabilities or align with strategic direction. • Generates sufficient income to ensure long term sustainability From innovation to commercialisation Copyright CPI 2010. All rights reserved Project Scope Project covers construction of two demonstration scale assets. Fully Flexible Gasifier. Slow Pyrolysis Facility. Plus supporting analytical laboratory. These are owned by CPI and operated by Tata Steel RD&T. Funding is 50% Public and 50% Tata Steel. Access matches funding. Project also covers the creation of the Thermal Technologies Centre organisation as a new business unit with CPI. Combines CPI and Tata people into one team. From innovation to commercialisation Copyright CPI 2010. All rights reserved The Demonstration Scale Assets – Details. 500 kW Demonstration Gasifier • Operating temperature 800 – 1500 deg.C • Updraft, Downdraft and Fluidised bed operation. • Tuyere mode – Blast Furnace simulation. • Extensive gas sampling and process monitoring. • Top feed fuel / feedstock's at rates up to 500Kg/hr. • Designed for a wide range of Feedstock's, typically to include biomass, plastics, RDF, wastes, etc. • Gas cleaning plant. • Downstream skid space for client equipment. From innovation to commercialisation Copyright CPI 2010. All rights reserved The Demonstration Scale Assets – Details. 500 kW Demonstration Gasifier • Operating temperature 800 – 1500 deg.C • Updraft, Downdraft and Fluidised bed operation. • Tuyere mode – Blast Furnace simulation. • Extensive gas sampling and process monitoring. • Top feed fuel / feedstock's at rates up to 500Kg/hr. • Designed for a wide range of Feedstock's. Interest to date includes. • Coal Injection – 1st Order Booking. Work Program is currently being agreed. • Production of Syngas from novel fuels and demonstration of combustion. • Possible fast pyrolysis capability? From innovation to commercialisation Copyright CPI 2010. All rights reserved Thermal Technologies Centre - Gasifier Facility From innovation to commercialisation Copyright CPI 2010. All rights reserved The Demonstration Scale Assets – Details. 350Kg Demonstration Slow Pyrolysis Unit • Max temp 1250 deg.C • Lining is suitable for a wide range of feedstock. • ‘Top’ and ‘end’ charged feed options. • In process temperature/pressure measurement. • Feedstock handling system. From innovation to commercialisation Copyright CPI 2010. All rights reserved The Demonstration Scale Assets – Details. 350Kg Demonstration Slow Pyrolysis Unit • Max temp 1250 deg.C • Lining is suitable for a wide range of feedstock. • ‘Top’ and ‘end’ charged feed options. • In process temperature/pressure measurement. • Feedstock handling system. Interests to Date includes. • Torrification of wood. • Combination of wastes into Steel Industry carbon supply chain. From innovation to commercialisation Copyright CPI 2010. All rights reserved Tata Steel RD&T Teesside Technology Centre From innovation to commercialisation Project Status – Gasifier. • Cold commissioning. End March 2012 • Hot commissioning. April 2012 - basic proof of functionality, BF mode on coke. Fluidised bed and Fixed bed down draft using woodchip. • First project work BF Mode – April/May 2012. • First gasifier case study work – May/July 2012. • Engaging with potential clients NOW. • Case Studies Completed – August 2012. • Knowledge development – continuous from inception! • Whole project is on time and within budget. From innovation to commercialisation Copyright CPI 2010. All rights reserved TTC August on handover. From innovation to commercialisation Copyright CPI 2010. All rights reserved Late September From innovation to commercialisation Copyright CPI 2010. All rights reserved Late October. From innovation to commercialisation Copyright CPI 2010. All rights reserved Content • Tata RD&T and CPI. Background to our partnership. • The Thermal Technologies Centre • The Innovation Offer. • Opportunity for Questions. From innovation to commercialisation Copyright CPI 2010. All rights reserved The Innovation Offer • Provision of access to demonstration scale facilities. • Opportunity to add to existing units. • Provision of access to small scale pilot facilities elsewhere within CPI and possibly outside of CPI/Tata RD&T. • High Temperature technology support is available, experience and expertise, generally sourced from Tata Steel RD&T. From innovation to commercialisation Copyright CPI 2010. All rights reserved And To Conclude… • We have an Innovative Project • Which will provide a tool which can drive Innovation through; •Access to assets. •Access to expertise and experience. From innovation to commercialisation Copyright CPI 2010. All rights reserved Content • Tata RD&T and CPI. Background to our partnership. • The Thermal Technologies Centre • The Innovation Offer. • Opportunity for Questions. From innovation to commercialisation Copyright CPI 2010. All rights reserved Close – Opportunity for Questions. From innovation to commercialisation Copyright CPI 2010. All rights reserved Innovation: Technology Readiness Levels (NASA) ECONOMIC SUPPORT BUSINESS DEVELOPMENT TRL 9 System Test, Launch and Operation System/Sub-System Development TRL 8 TRL 7 TRL 6 TECHNOLOGY DEVELOPMENT Technology Demonstration TRL 5 Technology Development Research to Prove Feasibility RESEARCH Basic Technology Research TRL 4 TRL 3 TRL 2 TRL 1 CPI Works at Technology Readiness Level 4 - 7 From innovation to commercialisation