Overview UCAIUG AND THE sgip

advertisement
DNP/UCAIug Joint Meeting 2011
• Greetings – Erich Gunther, Enernex
– UCAIug Board Chair
• UCAIug Update – Kay Clinard, UCAIug President
• CIMug Update – Greg Robinson, Xtensible
• IEC61850ug Update – Christoph Brunner, it4power
• OSGug Update – Erich Gunther, Enernex
• Testing Update – Bruce Muschlitz, Enernex
• UCAIug IOP 2011 – Herb Falk, SISCO
Update on Organizational Issues
• OSGug has just completed elections for two open TC
seats…Marty Burns, and John Simmins are the two
new members
• EC has just completed elections for three open seats
for OSG representation…Aaron Snyder, Gary
Stubbing, Klaus Bender are the three new members
• Will be seeking nominations for three more EC
members.
UCAIug 2011 Plan
• 2011 we will focus on member recruitment
– Being in contact with existing members
– Customer Satisfaction Survey
– Revising membership structure
– Tightening document access
– Increasing meeting costs for non-members
– Complete IPR and put in place
UCAIug 2011 Plan, cont..
• Last year we started acquiring equipment required
for meeting support…projectors, phones, room sound
systems.
• For 2011 the goal is to:
– Streamline meeting planning process
– Minimize charges where possible
– Use hotel staff to install and manage UCAIug supplied
equipment
– Use additional technical support where needed for
A/V.
UCAIug 2011 Plan, cont…
• 2011 Daily Operations
– Continuing support of SGIP
– Identify tasks that where additional/other
resources can be used
– Use proceeds from Meetings to pay for additional
resources as available
– Streamline credit card collections accounting
process
• Now Using PayPal for all cards
• Automating Data Collection & Reporting
– Meeting registration process
• Now using RegOnLine…evaluate using Cvent
UCAIug
Budget
Where the Budget Goes
Projected Expense
Professional Fees
$17,500
Customer Relations
Web
Presence
$8,000
$98,200
Marketing
$24,000
Meetings
$315,988
Testing Committee
$90,000
Expansion Plan to Establish Utiliy Forum
$30,000
Daily Operations
Bank and Credit Card Fees
Total Projected Proposed Budget Expenditures
Projected 2009 Income Less Expenditures
Balance brought forward from 2010 operations
Projected Balance at end of 2011 operations
$235,930
$15,400
$835,018
$30,382
-$30,000
$382
Greg Robinson, Xtensible Solutions
CIMUG UPDATE
IEC 61850 update
Christoph Brunner
Christoph.brunner@it4power.com
New parts
• Domain specific object models
– IEC 61850-7-4, Ed 2: Basic communication structure –
Compatible logical node classes and data object classes
– IEC 61850-7-410: Hydroelectric power plants –
Communication for monitoring and control
– IEC 61850-7-420: Communications Systems for Distributed
Energy Resources (DER)
Documents in preparation
• IEC 61850-7-5 – Use of the basic elements of IEC 61850
models
• IEC 61850-7-500 – Use of logical nodes to model the functions
of a substation automation system
• IEC 61850-7-510 – Use of logical nodes to model the functions
of a hydro power plant
Mappings for gateways
DNP Master
• IEC 61850-80-1 – Guideline to
exchange information from a CDC
based data model using IEC 608705-101 / -104
• IEEE 1815.1 – Exchanging
Information between networks
IEC
Implementing IEC 61850 and
61850
IEEE1815 (DNP3)
Device
– Intended to become a IEC dual
logo standard (IEC 61850-80-2)
DNP Outstation
Gateway
IEC 61580 Client
IEC
61850
Device
IEC
61850
Device
IEC
61850
Device
How to address new areas?
• Prepare technical reports "how to use IEC 61850 for... "
• Technical reports describing
– The use cases considered
– The impact on the communication
– The impact on the modeling
– The impact on the engineering
• Results will be used to update the standards (Amendment /
new Edition)
WG10 technical reports
• IEC 61850-90-1: Using IEC 61850 for communication between
substations (published)
• IEC 61850-90-2: Using IEC 61850 for communication between
substations and control center
• IEC 61850-90-3: Using IEC 61850 for condition monitoring
• IEC 61850-90-4: Network engineering guidelines
• IEC 61850-90-5: Using IEC 61850 to transmit synchrophasor
information according to IEEE C37.118
WG17 technical reports
• IEC 61850-90-6: Using IEC 61850 for distribution automation
• IEC 61850-90-7: IEC 61850 object models for photovoltaic,
storage and other DER inverters
• IEC 61850-90-8: IEC 61850 object models for electrical
vehicles
• IEC 61850-90-9: IEC 61850 object models for battery storage
systems
 Provide a "fast track" for urgently needed models for
SmartGrid applications
 Supported by the name space concept of IEC 61850
Other activities
• Develop methodologies for testing of functions in IEC 61850
based systems
• Define aspects of modeling distributed logic
• Prepare UML model of IEC 61850
• Prepare webbased access to IEC 61850 models
Status Edition 2
•
•
•
•
•
•
Published: Parts 6, 7-2, 7-3, 7-4
FDIS: Parts 4, 7-1, 8-1, 9-2
CDV: Part 5, 10
CD: Part 3
Circulated as DC – in preparation for DTR: Part 1
Withdrawn: Part 9-1
Open Smart Grid
(OpenSG)
Observers
EEI, UTC
Technical Committee
SG Communications
SG Conformity
SG Security
Working Group
Working Group
Working Group
SG Network
Task Force
Network Interop
Task Force
SG Simulations
Working Group
SG Systems
Working Group
Edge
Conformance
AMI-Security
AMI-Enterprise
Task Force
Task Force
Enterprise
Conformance
CyberSec-Interop
Security
Conformance
Usability Analysis
Task Force
Ent Info Mgmt
Task Force
OpenADE
Task Force
Task Force
OpenADR
Task Force
OpenHAN
Task Force
http://osgug.ucaiug.org/
UtilityAMI
Interest Group
2010 OpenSG WG Specific Objectives





SG Simulation – NEW for 2010! – Establish WG, chairman, charter
SG Systems

OpenADR

Build CIM into OpenADR specifications

Harmonize OpenADR with other TFs (OpenHAN, OpenADE, Conformance, etc.)

OpenADE

OpenADE 1.0 SRS: February 2010

OpenADE 2.0: User Requirements Q2 2010

OpenADE 2.0: System Requirements / Service Definitions Q4 2010

OpenHAN

OpenHAN 2.0 SRS ratified by OpenSG
SG Communications

Finalize the PAP 2 Task 1 and 3 OpenSG Interim Report #2

Meet with NIST and IEEE 802 to begin work on PAP 2 Task 4 (mapping of OpenSG application
requirements to the inventory of wireless standards)

Agree to high level statement on Network Interoperability Scope and Charter and begin work
SG Conformance

Agree upon (simple) definitions for Conformance and Interoperability and “Abstract Test Cases” and
“Concrete Test Cases”

Agree upon a language (framework, taxomomy) upon which to build abstract test cases

Edge Conformance

Complete Certification Process Reference Manual
SG Security

Establish coordinated support for other OpenSG working groups & task forces

Revise the AMI Security Profile

Address additional security profiles as produced by ASAP-SG

Next Meeting
South San Francisco
– Embassy Suites SFO
 March 7: OpenSG
Boot Camp Sessions
 March 8 – 10: User Group General
and Work Group Sessions

Bruce Muschlitz
Committee co-chair
www.ucaiug.org
UCA TESTING
PAST, PRESENT, AND FUTURE
UCAI MEETING
SAN DIEGO, CA
FEBRUARY 1, 2011
February 1, 2010
UCA IUG Testing Past, Present, and Future
Testing Committee Background



Group created during UCA IUG creation
Began work 2005
Technical Tasks




Test Procedures
Quality Assurance Program
Tester Accreditation
Administrative Tasks


Maintain Conformance Certificates
Maintain testing documents
UCA IUG Testing Past, Present,
and Future
22
February 1, 2010
Testing Subcommittee Charter



Single point focus for UCA IUG
Arbitrates technical issues
Coordinates groups within UCA




61850 Testing
Open Smart Grid Conformity
CIM Interoperability
Requires utility rep as co-chair

Now technically in violation (volunteers?)
UCA IUG Testing Past, Present,
and Future
23
February 1, 2010
NIST SmartGrid Developments




NIST is an international collaboration
Smart Grid Interoperability Panel
SG Testing and Certification Committee
InterOp Process Reference Manual





Best practices
InterOp Testing and Certification Authority
Mandates CB adhere to ISO/IEC Guide 65
Mandates Tester adhere to ISO/IEC 17025
NIST needs organization(s) to pilot IPRM
UCA IUG Testing Past, Present,
and Future
24
February 1, 2010
UCA Pilot of NIST IPRM

UCA has volunteered to pilot IPRM



UCA procedures almost meet IPRM
UCA status will be improved
Some changes needed: UCAS and testers

UCA to become Guide 65 Certification Body



UCA must adopt formal quality management sys
UCA will issue (sign off on) certificates
Testers to become 17025 certified/compliant


Tester will not have final say on certificate issue
UCA will review the “tester file” before cert issued
UCA IUG Testing Past, Present,
and Future
25
February 1, 2010
UCA Pilot of NIST IPRM (cont.)

2011 is transition year for IPRM



User Group need to declare ITCA intent
Lack of progress nullifies that declaration
Changes needed





Create quality manual for UCA testing
Have testers upgrade 9001 -> 17025
Remove tester authority to issue certificates
Significant per-test UCA work(review all tests)
Testing fees might be considered
UCA IUG Testing Past, Present,
and Future
26
February 1, 2010
Questions
UCA IUG Testing Past, Present,
and Future
27
February 1, 2010
The Standards Based Integration
Company
Systems Integration Specialists Company, Inc.
Report on UCA User Group
IOPs 2011
28
© Copyright 2011 SISCO, Inc.
What’s being tested
UCA
IEC 61850
29
CIM
© Copyright 2011 SISCO, Inc.
Rules of engagement
 IOPs are closed except to:

Participants

Witnesses
 Each IOP team develops their own use cases, test procedures, and
expected results.
 Testing will occur in a distributed or centralized fashion and will be
closed to team members only (week of March 28th).
 Test reports will be generated by each team and made available to
UCA User Group members.
30
© Copyright 2011 SISCO, Inc.
61850 Tests
61850
GOOSE
31
SV
SCL
(CID and SCD)
Client/Server
Infrastructure
© Copyright 2011 SISCO, Inc.
Witnesses





32
EDF
eRDF
KEMA
Prosoft
Red Electrica de Espanma
© Copyright 2011 SISCO, Inc.
61850 - Infrastructure
 Test objectives: To test Rapid Spanning Tree Protocol (RSTP) as a
recovery mechanism for Ethernet within a substation. Test will
include performance as well as interoperability.
 Test Participants:
33

Hirschmann

RuggedCom

Siemens

Schweitzer Engineering Laboratories

ZIV
© Copyright 2011 SISCO, Inc.
61850 IOP – SV Testing
Publishers
Subscribers
Alstom
SEL
Both
SEL
RTDS
34
© Copyright 2011 SISCO, Inc.
IEC 61850 Client/Server Tests
 Purpose: To test Reads, Direct Control, un-buffered reporting,
buffered reporting, and COMTRADE file transfer.
 Participant Matrix:
One more participant may be joining.
35
© Copyright 2011 SISCO, Inc.
IEC 61850 – GOOSE Testing
 Test purpose: Interoperability of DataSet member types.
36
© Copyright 2011 SISCO, Inc.
CIM Testing
CIM
IEC 61970
Part 4 and 13
Topology
37
Equipment
Assets
IEC 61968
GIS
Part 3
Part 9
Middleware
© Copyright 2011 SISCO, Inc.
61968 – Part 4 & Part 13
 Test objectives: To test the exchange of full and incremental network
models that contain sufficient information to allow a DMS to produce a
Power Flow. Test will include interoperability of multiple systems including
GIS and DMS systems from several vendors.
 Test Participants:









38
GE
Telvent
Siemens
EDF
EPRI
Alstom
ABB
TIBCO
SISCO
© Copyright 2011 SISCO, Inc.
Witnesses




39
Oncor
SunGard
Tenet
ERDF
© Copyright 2011 SISCO, Inc.
61968 – Part 3
 Test objectives: To test the exchange of an Outage Notification message
between an OMS and other Backoffice Systems. Test will include
interoperability of multiple systems including OMS, AMI and MDM systems
from several vendors.
 Test Participants:









40
GE
Telvent
Grid-Net
Siemens
Alstom
AEP
Consumers Energy
TIBCO
Oracle
© Copyright 2011 SISCO, Inc.
Witnesses





41
Oncor
SunGard
Tenet
AEP
Consumers Energy
© Copyright 2011 SISCO, Inc.
61968 – Part 9
 Test objectives: To test the exchange of at least 7 Meter Reading and
Control messages between metering systems and other Backoffice
Systems. Test will include interoperability of multiple systems including
AMI, MDM, OMS systems from several vendors.
 Messages that will be Tested:
42

Meter Readings

EndDeviceEvents

EndDeviceControls

PanDeviceEvents

PanDeviceControls

PanDeviceAssets

MeterAssetConfig

CoincidentMeterReadings
© Copyright 2011 SISCO, Inc.
61968 – Part 9
 Test Participants:














43
GE
Telvent
Grid-Net
Ecologic Analytics
Landis & Gyr
AEP
Consumers Energy
TIBCO
Oracle
eMeter
Elster
Aclara
Itron
UISOL
© Copyright 2011 SISCO, Inc.
Witnesses







44
Oncor
SunGard
Tenet
AEP
Consumers Energy
Kema
EDF
© Copyright 2011 SISCO, Inc.
Middleware/Integration Tests
 Tests will include the use of Web Services and JMS Topics and
Queues
 Integration patterns will include those found in 61968-1-1 and
61968-1-2
 Middleware Vendors include:
45

TIBCO

IBM WebSphere

Oracle WebLogic
© Copyright 2011 SISCO, Inc.
Questions
Download