BRAKE POWER

CERTIFICATE

BRAKE POWER CERTIFICATE

- RULES

• BPC RULES – FRAMED BY

• RAILWAY BOARD

• COMON FOR ENTIRE INDIAN RAILWAY.

• REVISED LATEST DURING 1982.

• CHIEF MECHANICAL ENGINEER –

AUTHORISED OFFICER TO GIVE SPECIAL

INSTRUCTIONS CONNECTED TO LOCAL

WORKING OF TRAINS WITH IN THE ZONE.

BPC – PRIOR TO 1982.

• MOSTLY VACUUM BRAKE STOCK –

• BPC FORM No – VB 5

• COMON FOR BOTH COACHING AND

GOODS TRAINS.

• BPC NORMALLY VALID UP TO NEXT

TRAIN EXAMINATION YARD.

• COACHING TRAINS FRESH BPC ISSUED

WHEN EVER LOCO CHANGED OR ANY

SHUNTING PERFORMED ON THE TRAIN

NEED TO REVISE THE BPC

RULES

• CHANGE IN THE PATTERN OF GOODS

TRAIN OPERATION.

• TO SPEED UP THE MOVEMENT OF

GOODS.

• TO COPE UP WITH LATEST

DEVELOPMENTS OF TRAIN

OPERATION.

DOVELOPEMENTS IN

ROLLING STOCK

 INTRODUCTION OF AUTOMATIC SLACK ADJUSTER

IN BRAKE RIGGING.

 INTRODUCTION OF ROLLER BEARINGS.

 INTRODUCTION OF AIR BRAKE SYSTEM.

 INTRODUCTION OF NEW DESIGN OF TRACK

FRIENDLY WAGONS.

 INTRODUCTION OF COMPOSITE BRAKE BLOCKS.

 PHASING OUT OF 4 WHEELERS AND LAMINATED

BEARING SPRINGS.

REVISED BPC RULES

• SEPARATE RULES GOVERNING FOR

• COACHING TRAINS –

• GOODS TRAINS-

• REVISED FORM NO FOR BPC.

• RS 6 – COACHING.

• RS 6 – GOODS.

COACHING BPC

• ANY COACHING TRAIN MOVEMENT IS A PRE

PROGRAMMED MOVEMENT.

• ALL COACHING TRAINS HAVING ITS

NOMINATED RAKES WITH ITS PRE

DETERMINED SET OF COMPOSITION OF

COACHES – RAKE COMPOSITION – ITS

DETERMINED MOVEMENT - RAKE LINK –

AND EACH RAKE IS BASED TO A COACHING

DEPOT FOR ITS PRIMARY MAINTENENCE.

• COACHING RAKES ARE BASED TO A

NOMINATED COACHING DEPOT FOR ITS

ATTENTION – PRIMARY MAINTENANCE.

COACHING BPC

• STANDARDS ARE FIXED FOR PRIMARY

MAINTENANCE BY RAILWAY BOARD.

• AFTER P M ATTENTION THE RAKE IS SUPPOSED

TO COVER 2500 KMS OF RUN.

• ACCORDINGLY COACHING BPCS ARE ISSUED IN

THREE DIFFERENT GROUPS.

1. SINGLE BPC FOR LONG DISTANCE TRAINS

2. RETURN BPC FOR SHORT DISTANCE

TRAIN LINKS

3. ROUND BPC FOR PASSENGER RAKES.

COACHING BPC OTHER

IMPORTANT CONDITIONS

• AN ENDORSEMENT TO BE MADE IN THE

BPC WHERE EVER LOCOMOTIVE CHANGED or ANY SHUNTING PERFORMED TO ENSURE

BRAKE CONTINUITY AND MINIMUM

REQUIRED PRESSURE LEVELS IN BRAKE

SYSTEM .

• IN THE ABSENCE OF MECHANICAL STAFF IT

IS THE RESPONSIBILITY OF GUARD AND

LOCO PILOT TO ENSURE THIS ASPECT.

• A SEPARATE AIR CONTINUITY CERTIFICATE

IS BEING ISSUED BY MECHNICAL DEPT. FOR

THIS IN OTHER ZONES.

• THERE IS NO LIMIT FOR ATTACHING /

DETACHING OF COACHES ENROUTE FOR

PRE PROGRAMMED MOVEMENT AS PER

LINK.

• FOR UN PROGRAMMED OR OCCASIONAL

MOVEMENTS OF ATTACHING COACHES

ENROUTE IF NUMBER OF COACHES

ATTACHED IS MORE THAN TWO A FRESH

BPC SHOULD BE ISSUED.

• IN ANY SUCH CIRCUMSTANCES IT IS VERY

IMPORTANT TO ENSURE BRAKE

CONTINUITY AND MINIMUM REQUIRED

PRESSURE LEVELS IN LOCOMOTIVE AND

REAR BRAKE VAN

BPC RULES FOR GOODS TRAINS

• IN THE COMPETITIVE WORLD FOR

MRAKETTING THE PRODUCTS QUICK

TRANSPORTION MODE PLAYS VERY

IMPORTANT ROLE

• AS FAR AS GOODS TRAIN MOVEMENTS ARE

CONCERNED IT IS VERY DIFFICULT TO

PREDICT THE LOADING, MOVEMENT,

DESTINATION AND OTHER FACTORS.

• WITH ALL THE FACTORS, IT IS OUR PRIME

RESPONSIBILITY TO MOVE THE LOADS AS

QUICK AS POSSIBLE TO THEIR

DESTINATIONS.

• KEEPING THIS IN MIND MAJOR CHANGES WERE

MADE IN GOODS LOADING AND TRANSPORTING.

GOODS BPC RULES FRAMED ACCORDINGLY ,

BALANCING THE SAFETY ASPECTS AND MOVING

THE LOADS BY QUICKEST POSSIBLE MEANS.

• STUDYING THE VARIOUS ASPECTS OF SOURCES OF

TRAFFIC, FUTURE POTENTIALS, INDUSTRIAL

DEVELOPMENTS , OTHER CONNECTED FACTORS

DIFFERENT POLICY DECISIONS WERE TAKEN

FROM TIME TO TIME.

• ALL THE GOODSHED AT INTERMEDIATE

STATIONS WERE CLOSED.

• NOW RAILWAY ACCEPTS FULL RAKE LOADING OR

A MINIMUM OF HALF RAKE LOADING.

• PEACEMEAL LOADING IS RESTRICTED.

GOODS BPC – GENERAL

• WITH DEVELOPED SYSTEM OF AIR BRAKE

WAGONS THE MECHANICAL DEPARTMENT

SHOULD CERTIFY THE WAGONS / TRAINS

TO ANY FAR AWAY DESTINATION OVER

INDIAN RAILWAY ON ONE EXAMINATION.

• AIR BRAKE STOCK ON INTENSIVE

EXAMINATION SHOULD BE CERTIFIED FOR

4500 Kms RUN.

• BASED ON THE TRAFFIC REQUIRMENTS ON

ONE HAND AND CONSIDERING THE

SAFETY ON THE OTHER HAND BPC RULES

FRAMED.

• STANDARDS WERE LAID DOWN FOR

INTENSIVE EXAMINATION OF GOODS

TRAINS AT NOMINATED GOODS YARDS IN

EACH DIVISION / ZONES.

• STANDARDS FOR EXAMIONATION/

ATTENTION / TESTING / REQUIREMENT OF

BASIC FACILITIES FOR ATTENTION ARE TO

BE AVAILABLE IN NOMINATED YARDS

• 40 MAN HOURS TIME GIVEN FOR THIS TASK.

• THE WAGONS ARE TO BE THOROUGHLY

EXAMINED AND ATTENDED IN ALL

RESPECTS AND TESTED FOR BRAKE POWER

AND TO BE CERTIFIED FOR 4500 Kms RUN.

DIFFERENT GOODS BPCs

• INTENSIVE BPC – EXAMINATION OF

WAGONS IN EMPTY CONDITION AND

CERTIFYING THEM.

• END TO END BPC – EXAMINATION OF

LOADED WAGONS AND CERTIFYING THEM

TO ITS DESTINATION ON ONE

EXAMINATION.

• CLOSED CIRCUIT RAKES – GOODS TRAINS

OPERATED ON CLOSED CIRCUITS –

COMMITED GOODS TRAFFIC.

INTENSIVE BPC

INTENSIVE BPC : AS PER THE POLICY

DECISION AS FAR AS POSSIBLE THE WAGONS

ARE TO BE OFFERED FOR TRAIN

EXAMINATION IN EMPTY CONDITION.

• THIS WILL AVOID –

• DETENTION OF LOADS FOR EXAMINATION

PURPOSE.

• LOADED WAGONS MARKED SICK AND

DETAINED AT YARDS DISTURBING THE

RAKE INTEGRITY.

• EVEN IF MORE TIME IS TAKEN FOR

EXAMINATION / ATTENTION OR ANY

WAGONS MARKED SICK WILL NOT AFFECT

THE CUSTOMER DIRECTLY .

• AFTER EXAMINING ONE FULL RAKE, BPC

TO BE ISSUED, THEN OFER THE WAGONS

FOR LOADING THEREBY LOADS MAY BE

MOVED TO THEIR DESTINATION

ANYWHERE IN THE INDIAN RAILWAY

WITHOUT WAITING FOR ANY TRAIN

EXAMINATION / ATTENTION.

PREMIUM BPC

• Further development in Intensive BPC – Air Brake formations examined in Empty condition and certified for

4500 kms or 12 days duration up to which the rakes can be loaded / unloaded twice or thrice.

• A grace period of 3 days is also given if the rake is in loaded condition on the way towards its destination.

• Rake integrity should be maintained. For which individual wagons numbers list attached with BPC as Annexure A

• Kilometers earned from the date of issue of BPC is also recorded in Annexure B of the BPC .

• Correct setting of Load / Empty box is the responsibility of Traffic staff.

TO ENSURE SAFETY THE

FOLLOWING CONDITIONS ARE

GIVEN IN BPC RULES

• WHILE ISSUING THE BPC DESTINATION

COLUMN TO BE LEFT BLANK.

• WAGONS TO BE LOADED WITH IN 4 DAYS OF

THE DATE OF ISSUE OF BPC.

• AS SOON AS THE WAGONS ARE LOADED,

STATION MASTER OF THE LOADING

STATION TO FILL UP THE DESTINATION

COLUMN OF THE BPC CORRECTLY.

• NO OVER WRITING / ALTERATIONS IN THE

OTHER PARTICULARS OF BPC IS PERMITTED

• SETTING OF LOAD / EMPTY BOX LEVER TO

CORRECT POSITION LIES WITH STAFF OF TRAFFIC

DEPARTMENT.

• STABLING OF THE RAKE ENROUTE MORE THAN

THE STIPULATED PERIOD IS NOT PERMITTED.

• THE INTEGRITY OF THE RAKE SHOULD BE

MAINTAINED.

• WHENEVER STABLED ENROUTE BPC TO BE

HANDEDOVER TO STATION MASTER BY LOCO

PILOT.

• WHILE CLEARING THE STOCK THE TRAIN

SHOULD BY JOINTLY CHECKED BY GUARD AND

LOCO PILOT – GDR CHECK. – CONTINUITY CHECK.

• CLEARING OF STOCK WITH GDR

CHECK

• EVEN IF VALID BPC IS AVAILABLE FOR A

TRAIN AT ENROUTE THE GDR SHOULD

CHECK THE FORMATION AND ENSURE

MINIMUM SAFETY REQUIREMENTS OF

THE TRAIN AND THEN ADVISE SM BY

WRITTEN MEMO.

• ON GETTING THE MEMO, SM SHOULD

HANDOVER THE BPC TO LOCO PILOT,

START THE TRAIN AND CLEAR THE

STOCK.

• IMPORTANT POINTS TO BE CHECKED BY GDR

• CONTINUITY AND MINIMUM REQIIRED AIR

PRESSURE / VACUUM LEVEL.

• CORRECT CONNECTION OF VAC/AIR PIPE AND ITS

FITTINGS, LEVEL OF VAC/AIR PRESSURE.

• CONDITION OF COUPLINGS AND ITS LOCKING

ETC.

• ANY BREAKAGE / DISLOCATION OF

COMPONENTS.

• ANY HANGING PART OF WAGON COMPONENTS

INFRINGING THE FREE MOVEMENT OF AXLE AND

WHEEL.

• CORRECT SETTING OF LOAD/EMPTY BOX

HANDLE.

• LIMITATIONS

• ON GDR CHECK IF ANY SICK WAGON IS

NOTICED IT SHOULD BE DETACHED

FOR ATTENTION .

• IF THEY ARE NOT SATISFIED OF THE

IMPORTANT SAFETY CONDITIONS,

THAT HAS TO BE ADVISED TO SM AND

CONTROL IN DETAIL AND ACT

ACCORDING TO THE GUIDANCE OF

CONTROL.

CONTUNUITY TEST

IMPORTANCE OF

CONTINUITY TEST

IN

AIR BRAKE SYSTEM

VACUUM BRAKE SYSTEM

In vacuum brake system availability of vacuum at rear B.V. itself is enough to say that the brake system of the whole train from

T.E. to last is connected through hence there is no valve / cock arrangement in the Train pipe

.

In case of Air Brake system it is not so. There are possibilities for the presence of compressed air inside the Brake pipe or Feed pipe even if there is no loco motive available on the formation. Hence to ensure

Brake continuity more attention is required. A very simple and common test is to be followed by GDR before starting train to ensure brake continuity.

AIR BRAKE SYSTEM

• IN A B S ALL THE ANGLE COCKS FROM TE

TO LAST B.V TO BE KEPT IN OPEN

CONDITION TO HAVE BRAKE FOR ALL

COACHES / WAGONS IN THE TRAIN.

• THERE ARE POSSIBILITIES OF WRONG

CONECTION OF PIPES IN SERVICE, (i.e)

• FP OF LOCO CONNECTED TO BP OF

WAGONS IN CASE OF GOODS S.P.ABS.

• FP AND BP INTERCHANGED AT ANGLE

COCK LEVEL THERE BY CONECTING BP TO

FP AND FP TO BP BETWEEN LOCO AND

COACH.

AREA OF CHECK

• AIM OF CONTINUITY TEST IS TO

ENSURE ALL THE BRAKE PIPE ANGLE

COCKS FROM LOCOMOTIVE TILL LAST

WAGON ARE IN OPEN CONDITION.

APART FROM THIS TO DETECT WRONG

CONNECTION OF BP / FP.

• A VERY SIMPLE TEST IS TO BE

CONDUCTED BY BOTH LOCO PILOTS

AND GUARDS AT THE STARTING

POINTS AND WHEREEVER LOCO

CHANGED OR ANY SHUNTING

PERFORMED IN THE TRAIN

THIS CAN OTHERWISE TERMED AS TO ENSURE

BRAKE CYLINDER APPLYING BRAKE WHEN

DRIVER ACTUATED BRAKING DULY REDUCING

BP PRESSURE FROM LOCOMOTIVE AND

RELEASING OF BRAKES WHEN ACTUATED FROM

LOCOMOTIVE.

GUARD TO CHECK BRAKE CYLINDER APPLYING

BRAKE AND RELEASING FOR FEW WAGONS /

COACHES FROM REAR PART.

ASSISTANT LOCO PILOT TO CHECK FEW IN

FRONT PORTION OF THE TRAIN.

BY THIS SIMPLE TEST ALL THE ABOVE MANUAL

FAILURES CAN BE DETECTED.