gas fired equipment field approvals

advertisement

Energy Efficiency Engineering

Ltd.

GAS FIRED EQUIPMENT FIELD

APPROVALS

Jozef Jachniak, P.Eng.

Who is ENEFEN?

• Small engineering consulting company

• 2 mechanical + 1 electrical engineers

• Registered in Alberta, BC, and Saskatchewan

• Offices in Leduc AB, Delta BC

• 29 years in combustion and BMS business

• Experienced in design and commissioning

• Member od CSA Standards, B149.1 and B149.3

• Working for major oil and gas companies

What do we do?

• Compliance evaluations

• Energy efficiency evaluations

• Design / re-design of existing equipment

• Troubleshooting of combustion systems

• Standards development (clients and national)

• Publications

• Education

• FIELD APPROVALS OF GAS FIRED

EQUIPMENT

Why Field Approvals?

• Because EVERY province in Canada has safety legislation

• Because EVERY legislation requires some sort of APPROVAL

• Because there are penalties for non-compliance

• Because provincial governments can shut the operation down for non-compliance

• Because there is a liability in case of an accident

Safety Legislation?

Code?

CSA B149.1 Installation Code?

What else is required?

Approval of Appliances

Responsibilities

Responsibilities

Responsibilities

Responsibilities of the installer

More responsibilities 1

More responsibilities 2

More responsibilities 3

Province Wide Variance

Province Wide Variance

Prohibitions

Penalties

INSPECTION AND APPROVAL

REQUIRED

Administration

ENEFEN Approvals Accepted by AMA

CSA B149.3

Download