Guide to the Smarter Balanced IT Architecture Connecticut Assessment Forum August 14, 2012 Measured Progress ©2011 Agenda • • • • • • • Smarter Balanced Update IT Architecture Project Overview Defining the Architecture – Period A Governance and Implementation – Period B Architecture Summary Report Technical Standards for Interoperability Q&A 2012 Smarter Balanced Update Measured Progress ©2011 IT Architecture Project Overview Measured Progress ©2011 Overview of Smarter Balanced Architecture Initiative • The Approach: This is larger than any single company agenda; it requires an open and collaborative approach • The Team: We have assembled a Collaborative with: o The thought leadership (industry, academia, industry associations & individual contributors) to ensure the vision is grounded in assessment and education best practices o The technical capability to deliver • The Process: Experienced and Agile; sustainability via a community approach • The Goals: Open, Flexible, Standards Based, and Componentized 2012 • Planning & blueprinting • Item types • Content development & universal design • Learning standard alignment • • • • • Content and data reviews Test form construction Field testing Item banking & statistics Content exchange / interoperability Assessment Lifecycle Content Development • • • • Psychometric analysis Equating Score tables - scaling, norming Performance levels / cut scores • Field test analysis Post-Test • Aligning results with Administration curriculum / instruction • Program and teacher effectiveness • Individual reporting • Diagnostic reporting • Informing & personalizing instruction • Performance on standards • Dashboard / summary reporting • Aggregation / disaggregation • Exchanging results / data Pre-Test Administration Assessment Life Cycle Test Administration Reporting Scoring • • • • • Computer scoring Professional scoring Algorithmic (AI) scoring Portfolio scoring Sub test / strand scoring • • • • • Attemptedness Performance levels Scaling / norming Growth scores Range finding • Administration planning & scheduling • Registration, assignment, • Form sampling • Online infrastructure readiness assessment • Pre-session planning (paper / online) & setup • Alternate form assignment • Test form delivery • Platform (paper, online, mobile) presentation • Item content & tools • Adaptive testing • Response collection • Proctoring controls • Form content security • Desktop security • Accessibility • Testing anomalies 2012 Project Approach Analysis Envisioning and Decomposition Validation and Documentation Governance and OSS Strategy Execution Drivers and Tradeoffs Scenario Mapping Execute Architecture Governance Model Goals and Capabilities Conceptual Models Consolidate Library Define Arch Review Process Assist Vendor Selection and Oversight User Personas Logical Models Validate Architecture Define OSS Mgmt Process Monitor OSS Development Activities Scenarios Detailed Architecture Reqs Coordinate QA Activities Technology Models 0-3 Weeks 3-7 Weeks 7-10 Weeks 10-12 Weeks Jan 2012 -> Ongoing 2012 Team 2012 Defining the Architecture – Period A Measured Progress ©2011 Process • Workshops • Showcases • Reviews • Final Deliverables 2012 Governance and Implementation– Period B Measured Progress ©2011 Governance Structure • Executive Committee • Architecture Review Board • Architecture Core Team • Extended Architecture Team 2012 Governance Processes 2012 Architecture Summary Report Measured Progress ©2011 Architecture Overview Architecture Summary Report available at: http://www.smarterbalanced.org/smarter-balancedassessments/technology/ Title: Assessment System Architecture and Technology Phase 1 Report 2012 Technical Standards for Interoperability Measured Progress ©2011 Standards Groups • CEDS • IMS Global • SIFA • AIF 2012 Assessment Interoperability Framework 2012 Question and Answer Measured Progress ©2011