The University of Cooperative Education Industrial Engineering Medical Engineering Electrical Engineering Financial Management Computer Science Public Management Bautzen twinned with Jelenia Góra www.ba-bautzen.de 1 Conference and Exhibition on E-Mobility More information: http://verein.ba-bautzen.de www.ba-bautzen.de 2 Student Project on E-Mobility www.ba-bautzen.de 3 Implementation of a Practical Charging Technique for E-Bikes Florian Hempel (11E-A) and Dr Daniel Raabe BA-Bautzen www.ba-bautzen.de Agenda I. Introduction to E-Mobility II. Bike Hire Scheme ‚Oberlausitz per Rad‘ III. Current charging technology IV. Our concept for a practical charging technology for E-Bikes within the rental network www.ba-bautzen.de 5 E-Car (Renault Twizy), BEV E-Mobility Charging tower > E-Mobility = the use of electric vehicles for transportation > E-Mobility combined with renewable energies could be one answer to global climate change, increased global population & limited resources > Aim of the German Federal Gov. is to put 1Mio Electric Vehicles on the road by 2020. > This seems to be unlikely considering current registration figures of E-cars (2012 only 3,000; Source: KBA). > With respect to E-Bikes incl. Pedelecs we have already hit the 1Mio threshold according to the bike association ADFC (sales of EBikes 2011–200,000, Sr: Derby Cycles) Number of E-cars on the road Source: zsw.bw.de www.ba-bautzen.de 6 Pedelec and E-Bike Pedelec Pedelec (Pedal Electric Cycle) supports the user during cycling (max. power 250 Watts and max. velocity 25km/h E-Bike (Electric Bike) supports the user even without cycling (using the pedals) (max. power 500 Watts and max. velocity 20km/h National Development Plan E-Mobility Main objectives of the plan: I. Improvement of energy storage/ battery technology (for increased range) II. New vehicle technology (e.g. more efficient drive technology) III. Development of an area wide charging grid Quelle: Nationaler Entwicklungsplan Elektromobilität der Bundesregierung – BMBF, 2009 http://www.elektromobilitaet-verbindet.de Various initiatives to support this plan such as Although the use of E-Bikes has several advantages in terms of sustainability and local development e.g. through toursim the further development of E-Bikes and its infrastructure is not support by current initiatives such as BAYERN-SACHSEN ELEKTROMOBILITÄT VERBINDET one example www.ba-bautzen.de 8 Bike Hire Scheme ‚Oberlausitz per Rad‘ Network Facts: > An expanding cross-border network of 20 bike rental points supporting bike toursim > Bikes can be picked at one rental point & returned at a different rental point with no additional charge > Rental points are independently managed by hotels, bike shops, tourist information points or local park administrations > Complete technical service by Little John Bikes > Opening of a new int. bike rental station in Krásna Lípa (Czech Republic) in April 2014 > More int. partners wanted! > Unfortunetely, the scheme currently supports no EMobility and in particular no E-Bikes due to the lack of a practical bike charging infrastructure > www.ba-bautzen.de 9 E-Bike charging system Pedelec E-Bike Essensial for an E-Bike or Pedelec is a sufficient battery providing sufficient range. Unfortuenetely, these batteries have to be charged! How do we do this? www.ba-bautzen.de 10 E-Bike charging system The battery of an E-Bike can be charged removed from the bike Drawbacks of the current system: > Charging E-Bikes/ Pedelecs requires the use of external battery chargers that are either carried by the user to the charging st. or supplied at the charging st. > Batteries and battery chargers are not standardized > Charging E-Bikes during long distance rides requires also a safe environment such as a dedicated room because the charging system of an E-Bike is currently not lockable > in a separate charging station to 230V socket Battery in the bike Battery removed charger docking station > or without moving the battery from the bike to 230V socket www.ba-bautzen.de 11 What companies offer for bike users… No battery charger available at the charging point Open access charging pillar with 230V power sockets (CEE 7/5) Not a safe environment Quelle: Belectric Drive GmbH, Kitzingen No network www.ba-bautzen.de 12 Our solution > Charging tower for partners of the bike scheme ‚Oberlausitz per Rad‘ > Having drawers for standardized and none standardized charging > Using renewable energy > Drawers are lockable www.ba-bautzen.de 13 Thank you Florian Hempel (11E-A) and Dr Daniel Raabe BA-Bautzen raabe@ba-bautzen.de www.ba-bautzen.de 15