APSC 150 Engineering Case Studies Case Study 3: Sustainable Mining Part III: Automation in Mining Lecture 3.8 Autonomous Haulage Trucks John A. Meech Professor and Director of CERM3 The Centre for Environmental Research in Minerals, Metals, and Materials The University of British Columbia Email: jameech@dccnet.com How does Automation relate to Sustainability? Automation Removes workers from positions of danger Improves the operating efficiency of mining Reduces carbon emissions (better fuel use) Decreases stripping ratio Increases recovery of the orebody Provides consistency and eliminates error Makes a mine more competitive Makes the work easier and more intelligent Is Automation Obvious? Mining operations are often chaotic Complex systems are not easy to automate Too many heuristic issues (environment) Unions don’t take kindly to labour replacement Industry is conservative (who has done` it?) Failure in high risk situations is unacceptable Who does the installation and maintenance? What about back-up systems? Equipment being Automated Underground digging and hauling (LHD) Underground communication systems Underground drilling Underground surveying Open Pit drilling Slope stability monitoring Truck Hauling and Dumping Autonomous Vehicles DARPA Grand and Urban Challenges 2004, 2005, and 2007 Vehicles drove by themselves autonomously UBC Thunderbird Robotics Formed in 2004 to enter the DGC Over 450 students have participated in numerous mobile robotic projects DARPA Grand and Urban Challenges UBC Thunderbird Robotics Formed in 2004 to enter the DGC Over 450 students have participated in numerous mobile robotic projects DARPA Grand and Urban Challenges Robot Racing Competition UBC Thunderbird Robotics Formed in 2004 to enter the DGC Over 450 students have participated in numerous mobile robotic projects DARPA Grand and Urban Challenges Robot Racing Competition NASA Moon Regolith Excavator Competition UBC Thunderbird Robotics Formed in 2004 to enter the DGC Over 450 students have participated in numerous mobile robotic projects DARPA Grand and Urban Challenges Robot Racing Competition NASA Moon Regolith Excavator Competition Thunderbots RoboCup Soccer UBC Thunderbird Robotics At the Vancouver Auto Show Formed in 2004 to enter the DGC Over 450 students have participated in numerous mobile robotic projects DARPA Grand and Urban Challenges Robot Racing Competition NASA Moon Regolith Excavator Competition Thunderbots RoboCup Soccer E-Beetle Electric Car http://www.ubcecc.com/blog/ Snowstorm CAT797F Mining Truck Accidents Komatsu’s AHS Open Pit Mining Costs ($/t) Operating Cost Breakdown for CAT793 Operating Cost Breakdown for CAT789 Evolution of Mining Truck Capacities Key Components System Requirements • • • • • • • Communication network Sensors for navigation and object- avoidance GPS system accurate to 10cm (D-GPS) Computer hardware on-board Central processing system Controller devices Supervisory Software GPS-based navigation Autonomous Control Cabinet Hydraulic controls sealed on left side, electronic controls and truck interface on the right side for ease of access. Group includes PLM III. Autonomous Status Lights Mounted on all sides of the truck to safely display truck operating status Road Edge Guidance (REG) A mounted laser guidance system measures the distance to the road berm to provide additional navigation accuracy PLM III is a payload monitoring system that gives the operator accurate weight of payload, gross vehicle weight, cycle times and empty vehicle weight. Wheel Speed Sensors Wheel speed sensors and laser-ring gyro are combined to produce accurate navigation control (IMU). Steering Angle Sensors The steering angle of the wheels is measured at the control arm Autonomous Status Lights Mounted on all sides of the truck to safely display truck operating status GPS GPS technology is combined with Modular Mining’s Masterlink system to accurately track location of vehicles Masterlink Modular Mining’s Masterlink system monitors every vehicle in the system. Obstacle Detection System System focuses only on the route. Perceivable target: a human 100 m distance Millimeter wave radar Komatsu 930E-AT First two units were field tested by Komatsu at the Twin Butte mine near Tucson. Tests show no major problems with radar and GPS navigation. The system is also examining other equipment - bulldozer, front-end loader and several smaller ancillary vehicles. ASI’s Obstacle Avoidance System Radomiro Tomic Mine in Chile Tonnage Hauled 2006 = 8,222,000t - 32,000 tpd for 256 days Mechanical Availability = 90.5% AHS vs. 80.2% total fleet Effective Utilization = 84.2% Daily Haulage Time = 24 x 0.905 x 0.842 = 18.2 hrs - percentage gain = 25.4% - potential to 20.5 hours Accidents = none (2 in 2007) Cost per tonne = U.S.$1.36/t >>>> U.S.$0.58/t Maintenance Reduction = 7% Depreciation Decrease = 3% Impact on Mine Design - increased slope angle - decreased road width Significant increase in safety Software / Sensor Features Localization Navigation Obstacle Recognition Obstacle Avoidance Lane Following (where am I?) (where do I want to go?) (what is in the way?) (how do I avoid it?) (what is best route?) Shovel-Truck Modeling ExtendSim software to model discrete event processes Probability of failures (maintenance) Model based on First-Principles Rimpull and speed Fuel consumption Fuzzy model of road conditions Tire wear based on empirical data Manual versus Autonomous operation Truck Operation The basic truck cycle considers ore/waste being loaded at a shovel and delivered to a surface stockpile/Crusher. 31 Http://ssabh188.blogspot.com Pit Layout Dump link5 extension extension link6 Waste link1 link7 link2 Maintenance Parking Ore Shovel extension link4 Ore Waste Shovel link3 Crusher Http://ssabh188.blogspot.com Traffic Management Speed limits 2 way traffic No passing Minimum separation between vehicles(50m) Http://ssabh188.blogspot.com Batching of Resources – trucks & drivers Digging and Loading Module ExtendSim Blocks for Discrete-Event Modeling Maintenance and Delay Module Driver Attributes Work Period = 14 days Breaks Shift Change Lunch Bathroom Total Attribute Shift Duration = 12 hours Shift Time (hr) Duration (hr) 0/12 0.25 6 0.75 3 and 9 0.17 1.34 (11%) Efficiency short term long term learner experienced tired (shift start) tired (shift end) tired (start work period) tired (end of work period) time since trained (short) time since trained (long) personality (aggressive) personality (conservative) 80 85 85 80 85 80 85 75 80 85 90 95 90 85 90 85 95 80 90 95 In addition, variance will be higher for negative attributes. Components Two Shovel Eight Trucks One dump area One Crusher Auxiliary equipment such as graders, dozers, water trucks, fuel trucks, drills and light vehicles Breakdown and maintenance events Http://ssabh188.blogspot.com Manual & AHT Model Output The model outputs Benchmarking KPIs*: Productivity Safety Breakdowns Cycle times Maintenance costs Labour costs Fuel Consumption Tire Wear Truck Costs ( annualized) Reduced GHGs * KPI = Key Performance Index Rimpull vs. Speed in the Research Key Sub-Questions Performance Indicators - Targets AHS AHS AHS AHS AHS + 30% +8% -7% Manual Manual Investment cost Truck haulage per truck speeds -10% -12% Manual Manual Manual Fuel consumption Mechanical Availability Tire Wear in the Research Key Sub-Questions Performance Indicators - Targets AHS AHS AHS AHS 12% + 5% -15% -14% Manual Increased Productivity -80% Manual Manual Maintenance costs Increased Truck life Manual Labour costs Labour savings depend on current mine circumstances – union and turnover issues Potential Labour Savings Current Situation: Drivers per truck = 4 (2 on / 2 off) Total = 55 trucks x 4 = 220 plus vacation subs (20) Drivers retrained every 6 months Annual turnover = 40% Annual Labour cost = $36,000,000 + O/H Annual training costs = $10,000,000 + O/H Future Situation: No drivers and no training Increased maintenance personnel (3 trucks/person) Annual costs = 48 x $150,000 = $7,200,000 + O/H Potential Labour Savings Care must be taken when introducing automation into a union operation Labour replacement must be done by attrition, not by lay-offs Sabotage will result otherwise Time to implement will increase System may fail ultimately Mine Design Issues Steepen pit slopes to reduce stripping ratio Reduce haulage road width Select smaller trucks to increase flexibility Haul Road Width One-way straights and corners: 2.5 – 3 widths Two-way traffic: In straights, 3 – 3.5 truck widths Two-way traffic: In corners, 3.5 – 4 truck widths One-way (straights/corners) Two-way (In straights) Two-way (In corners) Komatsu’s Autonomous Haulage System Autonomous Solutions Applications ASI’s Remote Dozer Control Fuzzy Control of an Autonomous Vehicle Snowbots – Robot Racing 2009 Tele-robotic Drilling Underground