Support to the Establishment of Single Window for Export, Import and Transit Procedures in the Republic of Tajikistan Project Steering Committee Meeting No. 2 30 November 2012 Intrasoft International Project Team Presentation Project Steering Committee Meeting No. 2 (30 November 2012) 1 Overall Expected Project Results 1. SW IS Development and Testing • • • • Project Plan Detailed specification (SRS) System software developed Training Plan 2. SW IS Pilot Implementation • • At SUE SW office and two SW agencies Including the same two SW agencies in two regional centres 3. Replication of SW IS • • Roll out to all planned regional centres All involved SW agencies at all those regional centres 4. Warranty and Support Services • • Support, training and correction of faults and bugs in the SWIS 6 months after system goes live Project Steering Committee Meeting No. 2 (30 November 2012) 2 Structure Project Steering Committee Meeting No. 2 (30 November 2012) 3 Project Phases(RUP) • • • • Inception Elaboration Construction Transition – Pilot – Complete – Warranty Tue 12 June 12 Mon 16 July 12 Mon 3 Sept 12 Mon 22 Apr 13 Fri 11 July 12 Fri 28 Sept 12 Fri 10 May 13 Fri 11 Apr 14 Mon 22 Apr 13 Mon 26 Aug 13 Mon 14 Oct 13 Fri 23 Aug 13 Fri 11 Oct 13 Fri 11 Apr 14 Project Steering Committee Meeting No. 2 (30 November 2012) 4 On Deliverables • Review cycle (i.e. values of T1/T2/T3); • SfR (i.e. document version, contractual, foreseen and actual dates, delay between contractual and actual dates, if any); • Review comments receipt (i.e. due date and receipt date); • SfA (i.e. contractual, foreseen and actual dates, document version and delay between contractual and actual dates, if any); • Acceptance notification (i.e., due date, actual date and delay between these dates, if any); Project Steering Committee Meeting No. 2 (30 November 2012) 5 The Elaboration Phase Deliverables The following documents were produced and delivered to EU Delegation: • Software Requirements Specification (SRS) • Draft Template of the Service Level Agreement between the SUE SW and SW Agencies • Infrastructure Requirements Document (incl. technical design of server equipment at the Data Centre) (IRD) • Detailed Technical Design (DTD) • SWIS-UAIS INTEGRATION Technical Proposal Project Steering Committee Meeting No. 2 (30 November 2012) 6 The Elaboration Phase.. (DTD) A special mention to Data analysis and Harmonization activities. • Detailed analysis of all permit data • Encoding of permit messages (Request, Response) • All finished except one. • Harmonization (WCO data model) • XSD Construction Project Steering Committee Meeting No. 2 (30 November 2012) 7 Other Elaboration Phase Activities • 3 Management missions • Quality Manager visit and training for Project Team and SUE SW staff • 4 additional technical specialist visits to Dushanbe • Project website constructed • SRS Consultation Events with Stakeholder Groups • Productive collaboration with the all project stakeholders ( New person is the Project monitoring technical expert V. Abramytchev) • Development partner collaboration (GIZ, ADB) • Presentation to BIG at EU Delegation (23 August 2012) • Presentation to DataProject Harmonisation Working Group (28 Steering Committee Meeting No. 2 (30 November 2012) November 2012) 8 Update on Main Open Issues • • • • Delay in stakeholder comments on SRS Most Stakeholders have not yet replied Delay in SRS acceptance Payment Integration. • Work further on UAIS Interface proposal • BRIS interface • Equipment tender (Server room location). • Business Process Optimisation – Select 3 Agencies . Project Steering Committee Meeting No. 2 (30 November 2012) 9 Next Steps • SRS Approval • DTD Approval (Depended on SRS) • Project plan Update • SW Construction. Project Steering Committee Meeting No. 2 (30 November 2012) 10 Assistance Needed • Support for SRS approval procedure – Collect and consolidate all comments – Analyze and reply – Present Position to Coordination Committee – Resolve at least all non trivial or minor open issues • UAIS Integration • BRIS Integration Project Steering Committee Meeting No. 2 (30 November 2012) 11 The Construction Phase • Development of the SWIS Application Software • Documentation of SWIS Application Software • Supervision of the Installation of Equipment Project Steering Committee Meeting No. 2 (30 November 2012) 12 Construction Phase 180 days Mon 3 Sept 12 - Fri 10 May 2013 • Initial stage Mon 3 Sept 12 • Development Mon 1 Oct 12 • Test SWIS (FAT) Wed 20 Mar 13 • Package/Deliver Wed 8 May 13 • Documentation Mon 1 Oct 12 • Supervision of the Mon 11 Mar 13 installation of equipment Project Steering Committee Meeting No. 2 (30 November 2012) Fri 28 Sept 12 Tue 19 Mar13 Tue 7 May 13 Thu 9 May 13 Tue 7 May 13 Wed 24 Apr 13 13 The Development Activities Develop the Application software . Execute/Pass Factory acceptance Tests and Deliver FAT report.. Produce test data. Deliver deployable package. Project Steering Committee Meeting No. 2 (30 November 2012) 14 The Development Activities (Cont.) • • • • • • Progress Infrastructure Interface (UI) Prototype Database Design Workflow demo Web applications with UI Service Implementation Project Steering Committee Meeting No. 2 (30 November 2012) (Completed) (Completed) (In progress) (Completed) (Started) (Started) 15 The Documentation Deliverables 1. 2. 3. Service Desk and Fallback Procedures (Submitted) Acceptance Testing Plan (Submitted) Development of Training Strategy, Methodology and Environment (Submitted) 4. Pilot Implementation Plan (Due today 30.11.2012) 5. Maintenance and Support Implementation Plan (Due today 30.11.2012) 6. System Replication (Due today 30.11.2012) 7. Training Plan (Due 28.12.2012) 8. Installation Procedures (Due 19.03.2013) 9. Administrator Manual (Due 30.04.2013) 10. Training Material (Due 06.05.2013) 11. User Manual (Due 07.05.2013) Project Steering Committee Meeting No. 2 (30 November 2012) 16 The Supervision Activities • Supervised supply and installation of Central Servers Mon 11/3/13 Fri 5/4/13 • Supervised supply and installation of workstations and network equipment Mon 11/3/13 Fri 19/4/13 • Full load testing. Acceptance and commissioning Tue 9/4/13 • Infrastructure Installation Report Tue 23/4/13 Project Steering Committee Meeting No. 2 (30 November 2012) Mon 22/4/13 Wed 24/4/13 17 Summary • SRS now completed (pending Coordination Committee approval on 4th December 2012) • Equipment tender about to commence • Service Level Agreement prepared • Working Groups will have delivered their reports • Construction Phase has commenced Project Steering Committee Meeting No. 2 (30 November 2012) 18 Thank you for you attention Project Steering Committee Meeting No. 2 (30 November 2012) 19