Headway Technology Co., Ltd. Contents: I. Company Profile II. OceanGuardTM BWMS I. Company Profile Group Members Techical Team BSH & DNV ISO9001 Products and Service Plant Group Members North Ship & Ocean Engineering Co., Ltd. (NSO) Headway Technology Co., Ltd. Qingdao Dasheng Titanium Industry Co., Ltd. Shanghai Baway Technology Co., Ltd. Zhoushan IN Marine Engineering Co., Ltd. Advanced Optronic Devices (China) Co., Ltd. Bio Enterprise Co., Ltd. Qingdao Baway Real Estate Management Co., Ltd. Technical Team Headway 150 employees; Including 108 engineers with bachelor or doctor’s degree, from fields of biology, environment, software, hardware, mechanical design, ship engineering, etc. Related R&D Institution Institute of Oceanography Chinese Academy of Sciences Changchun Institute of Applied Chemistry Chinese Academy of Sciences Headway General Research Institute for Nonferrous Metals Harbin Industry University Wuhan University of Technology Harbin Engineering University Headway Approval BSH ISO 9001 Quality Management System DNV ISO 9001 Quality Management System Products and Service Products Global Service Network Products Communication & Navigation Environment Protection Automatic Equipment Communication & Navigation ECDIS VDR/SVDR ECDIS BNWAS Speed Log Radar Echo Sounder GPS/GPS GYRO COMPASS VDR/SVDR BNWAS Environment Protection Ballast Water Management System LED Lighting Sewage Water Management System ODME Exhaust Gas Treatment Device OceanGuardTM BWMS LED Lighting Automatic Equipment Water Ingress Detect & Alarm System Dewatering Control System Water Ingress Detect & Alarm System Dewatering Control System Global Service Network ——Headway has subsidary company in Shanghai, and has set up 15 offices at main port-cities in China, including, Guangzhou, Shenzhen, Dalian, Zhoushan, Shanhaiguan, Nantong, with additional expansion being planned; ——120 service bases in 56 countries and regions, forming a complete global service system, guaranteeing the after-sales service and technical support. Part of our partners Plant Headway ----Professional Manufacturer of High-Tech Marine Equipment VDR/SVDR Plant OceanGuardTM BWMS Plant Test Base of OceanGuardTM BWMS Test Base of OceanGuardTM BWMS II OceanGuard TM BWMS Background & Regulations AEOP Technology OceanGuard TM BWMS System Description Distinct Advantages Approval & Reference Background & Regulations Shipping moves over 80% of the world's commodities and transfers approximately 3 to 5 billion tonnes of ballast water internationally each year. The introduction of invasive marine species into new environments by ships' ballast water, attached to ships' hulls and via other vectors has been identified as one of the four greatest threats to the world's oceans. In 2004, IMO adopted the International Convention for the Control and Management of Ships' Ballast Water and Sediments, which will phase in requirements for ballast water treatment over the coming years. Qingdao, China. July, 2008. IMO D-2 Regulation/USCG Requirement & California Requirement Organism IMO D-2 Regulation /USCG Requirement California Law >50µm <10 viable organisms/m3 0 detectable living organisms 10-50µm <10 viable organisms/ml <0.01 living organisms/ml <10µm No limit <103bacteria/100ml <104 virus/100ml Toxicogenic Cholerae <1cfu/100ml or <1cfu/1g wet weight zooplankton sample <1cfu/100ml or <1cfu/1g wet weight zooplankton sample E coli <250cfu/100ml <126cfu/100ml Intestinal Enterococci <100cfu/100ml <33cfu/100ml Excerpt from Report of California State Lands Commission International Convention for the Control and Management of Ship’s Ballast Water and Sediments (2004) Timeline Built Time Capacity of Ballast Tank (V, M3) Time to Fulfill D-2 Regulation Before 2009 1500≤V≤5000 2015 V<1,500 or V>5,000 2017 V<5,000 Upon Delivery V≥5,000 2017 All ships Upon Delivery 2009-2011 2012 and After 2012 Ships built in 2009 should fulfill D-2 Regulation by second annual survey, not later than 2011.(A.1005(25)) Conditions for Entry-into-Force Conditions •No less than 30%states ratified; and •No less than 35%of the world total merchant shipping gross tonnage. •The Convention will enter into force 12 months after the date on which the above conditions have met Status of Ratification (by March, 2012) •33 States; •26.46%of the world total merchant shipping gross tonnage. USCG Requirement Timeline New Building Retrofit Built Time Capacity of Ballast Tank(V, M3) Time to Fulfill USCG Requirement Dec. 1st, 2013 and After All ships Upon Delivery V<1,500 First drydocking after Jan. 1st, 2016 1500≤V≤5000 First drydocking after Jan. 1st, 2014 V﹥5,000 First drydocking after Jan. 1st, 2016 Before Dec. 1st, 2013 Proposed the concept of AMS (alternative management system); BWMS should be tested in an independent laboratory; Additional requirements, including cleaning ballast tanks regularly to remove sediments, removing fouling from the hull, piping and tanks on a regular basis, etc. Background & Regulations AEOP Technology OceanGuard TM BWMS System Description Distinct Advantages Approval & Reference Technologies • Filtration(screen or disc type) Solid-liquid separation • Hydro cyclone • Coagulation + Chemical Disinfection and dechlorination Ballast Water Treatment Technologies Disinfection Physical Disinfection Microagtation • Ozone • Chlorination • Electrochlorination/Electrolysis • Seakleen (Menadione based) • Residual chlorine neutralization • Ultraviolet(UV) irradiation • De-oxygenation • Heat (thermal treatment) • Magnetic treatment (mix of physical and chemical) • Cavitation • Ultrasound 6+ Advanced Oxidation • Using Tio2, OH, Fe and others History of Headway R&D 2002, cooperation with Harbin Industry University, using UV technology to treat ballast water; 2004, developed O3+UV technology for BWT; 2005, R&D for APOP (Advanced Photocatalysis Oxidization Prcess ) technology; 2006, cooperation with Changchun Institute of Applied Chemistry Chinese Academy of Sciences, using Plasma Discharge for BWT; 2007, cooperation with China Ocean University, on R&D for the test and measurement methods for BWT; 2007, cooperation with Harbin Engineering University, fixed the method for BWT, using AEOP (Advanced Electrocatalysis Oxdization Process) technology; 2007, OceanGuardTM BWMS is listed as the National Torch Project; 2008, OceanGuardTM BWMS is financed by Ministry of Industry and Information Technology of P.R.C.; 2008~2010, OceanGuardTM BWMS is tested in NIVA Facility, Norway; March, 2010, IMO Basic Approval; Oct., 2010, IMO Final Approval; March, 2011, CCS Type Approval; Nov., 2011, DNV Type Approval AEOP Advanced Electrocatalysis Oxidation Process, is to kill the microbes, bacteria and viruses in the water and reduce other organics through destroying the cell membrane of the microbe by using the special semiconductor materials under electron excitation and the hydroxyl radicals (·OH) formed by water molecules. Advantage of ·OH Less energy is needed to destroy the cell membrane of bacteria -> Low Energy. Bacteria, after being destroyed by ·OH, will totally disappear -> Single Treatment Exist for 10-6 s -> No by products. Strong oxidizability, high electric potential -> Fast sterilization speed. No influence by chromaticity, turbidity, speed, temperature, PH, or salinity of the water, etc -> Can work in Fresh water. Difference between from Electrcatalysis and Electrolysis Item Electrocatalysis Electrolysis Principle To kill the microbes, bacteria and viruses in the water and reduce other organics through destroying the cell membrane of the microbe by using the special semiconductor materials under electron excitation and the hydroxyl radicals (·OH) formed by water molecules. The electrolysis of NaCl solutions to form sodium hypochlorite, use hypochlorite to kill bacteria, viruses, etc. Medium Sea water, Brackish water, Fresh water Seawater and brackish water only Substance Hydroxyl radicals (•OH) Hypochlorite ion Treatment Performance Excellent performance, water treated can meet IMO as well as California regulation. Water treated can meet IMO regulations. Final product H2O and CO2 No corrosion to the hull , safe to the crew, ship and environment. Sodium hypochlorite may remain in ballast tank and pipes, cause corrosion to the coating of the hull. Hydrogen:Explosive, so need to be removed by exhauster OceanGuard TM BWMS Background & Regulation OceanGuard TM BWMS AEOP Technology System Description Distinct Advantages Approval & Reference OceanGuardTM BWMS Filter EUT Unit Control Center Necessity of Filtration Step International Convention for the Control and Management of Ship’s Ballast Water and Sediments OceanGuardTM Filter Automatic backflush, 50 micros. Test Base in Zhoushan: Headway Filter & Boll Filter Specification of Filter Model Flow rate range (m3/h) HMT-100F 50~160 HMT-200F Flange size Max working pressure (bar) Quantity of element Footprint (M2) Filter Area (CM2) 125 150 10 11(A2) 1.1 8195 80~260 150 200 10 20(A2) 1.3 14900 HMT-300F 100~350 200 10 28(A2) 1.5 20860 HMT-500F 150~550 250 6 16(A3) 1.6 27736 HMT-600F 300~900 300 6 24(A3) 1.9 41604 HMT-1000F 500~1200 350 400 6 32(A3) 2.1 55472 HMT-1500F 800~1700 400 6 50(A3) 2.4 86675 HMT-2000F 1000~2400 500 6 34(A4) 2.7 115260 HMT-3000F 1600~3200 600 6 44(A4) 2.8 149160) HMT-4000F 2000 ~4400 700 6 59A4)4 3.1 183060 EUT Unit Electro-Catalyst Unit Ultrasound Unit EUT Power Specification of EUT Unit Control Unit Control Center Sensors Power Distribution Unit Control Unit Control Record Display Alarm Interface of Sensors Interface of Pipes Interface of Alarm Interface of Log Salinity Meter Sensor Flow Meter TRO Unit Salinity Meter TRO Unit Flow Meter Salinity Meter Measure Salinity of water correctly. Suitable for any water quality, fresh water, brackish water, seawater, high salinity water. Box includes Salinity sensor, controller, cable. Flow Meter Magnetic Type. Measure instantaneous flow & total flow. Suitable for different water quality. TRO Unit Compact, reliable, precise detector for TRO. Easy to operate 225X215X125m IP 65 Power Distribution Unit Control equipment of power supply for Ocean Guard™ Ballast Water Management System; Junction Box input is marine AC three-phase AC440V/380V and AC single-phase AC220V, and the output is AC440V/380V , AC220V and DC24V AC440V/380V Electrocatalysis part of EUT Unit, Filter, TRO measuring pump AC220V Control unit, Ultrasonic part of EUT unit, TRO meter, Salinity meter DC24V TRO metering pump OceanGuard TM BWMS Background & Regulation AEOP Technology OceanGuard TM BWMS System Description Distinct Advantages Approval & Reference Advantages Perfect Sterilization Performance Small Size, Low Power Consumption Less Maintenance No Corrosion Compact Design, Full Intergration 6 Single Pass Perfect Sterilization Performance Data from Land-based testings of OceanGuardTM BWMS carried out in NIVA in Sep.2009 and Shipboard testings carried out in MV YOKOHAMA in Nov.2009 Test Project Landbased Testing Shipboard Testing Organism Unit Influent water Org.in treated water on Day 0 Org.in treated water on Day 5 IMO Reg. California (SB497) Reg. >50µm cells/m3 213304 0 0 <10 0 10-50µm cells/ml 2023 0 0 <10 <0.01 E-coli bacteria cfu/100 ml 2200 <1 <1 <250 <126 Entrococcus cfu/100 ml 91 <1 <1 <100 <33 >50µm cells/m3 158933 0 0 <10 0 10-50µm cells/ml 2230 0.0057 0.00067 <10 <0.01 E-coli bacteria cfu/100 ml 230±7 0 0 <250 <126 Entrococcus cfu/100 ml 42.3±21 .6 0 <1 <100 <33 Data from Landbased testings and Shipbboard testingd indicate the fulfillment of the California requirements (SB497). Small Size, Low Power Consumption (EUT Unit) Less Maintenance No Corrosion Report from JOTUN Report from Qingdao Research Institute for Marine Corrosion, CISRL Compact Design, Full Integration Single Pass Perfect sterilization performance, using of ·OH, ballast water treated by OceanGuard™ BWMS can meet the IMO D-2 Regulations as well as California Requirements by single treatment. No need to treat again during deballasting. OceanGuardTM BWMS can be used in vessels which use gravity discharge instead of ballast pump. OceanGuard TM BWMS Background & Regulation OceanGuard TM BWMS AEOP Technology System Description Distinct Advantages Approval & Reference Approvals IMO Basic Approval_ MEPC 60, March, 2010 IMO Final Approval_ MEPC 61, Oct., 2010 CCS Type Approval_ March, 2011 DNV Type Approval _Nov., 2011 California report _ 2011 Pilot and Landbased Testing in NIVA Facility Norwegian Institute for Water Research Tests of BWMS complete in NIVA, e.g. Alfa Laval, Sweden, 2007 OceanSaver, Norway, 2007 Optimarine, Norway, 2009 Headway, China, 2009 Reference OceanGuard™ BWMS carried out shipboard test in MV YOKOHAMA in 2009, with constant excellent performance; Reference list covers Container vsl, Multi-purpose vsl, Semisubmerged vsl, Off shore Supply vsl, Cruise vsl, Science & Investigation vsl, Bulk Carrier, Tanker etc. 33 orders till now. 8 sets of OceanGuard™ BWMS have been installed onboard. OceanGuard™ BWMS onboard MV SITC YOKOHAMA (Retrofit) Ship owner: SITC shipping MV SITC YOKOHAMA, 831 TEU Container Ship, built in 2004, ABS Seven engineers, taking only 4 days for the installation. OceanGuard™ BWMS Onboard VS465 (Newbuilding) Ship owner: Sartor Norway VS465: Multipurpose Vessel, BV OceanGuard™ BWMS onboard Costa Romantica (Retrofit) Ship owner: Costa Crociere S.p.A/Carnival Costa Romantica: Cruise Ship, RINA OceanGuard™ BWMS Onboard H2185 (Newbuilding) Ship owner: SITC shipping H2185: 76K Bulk Carrier, ABS Reference List of OceanGuardTM BWMS Hull No. / Ship Name Shipowner Ship Type Installation Place System Capacity(m3/h) Quantity (shipset) Class Delivery Time N/A HONG XIANG SHIPPING CORP.,LIMITED 64K Bulk Carrier YangFan Shipyard 2X1000 6 GL By 2013 SEAPIONNER 50k DWT Tanker Guangzhou Shipyard International Company Limited 2x800EX+300 1 DNV By Jan, 2013 2x600EX+300 4 DNV By Jan, 2014 06130023 08131014/ 15,111300 19/20 Tomasos Brothers 37.5k DWT Tanker Guangzhou Shipyard International Company Limited H964/965/ 966/967/9 68 Yang Ming Marine Transport corp., Taiwan 4,662 TEU Container Ship China Shipbuilding Corp., Taiwan 1X600 5 ABS By 2014 A286L Shanghai Salvage Bureau 16000kW Ocean Tug Wuchang Shipbuilding 1X200 1 CCS By Aug,2012 H2218/19/ 20/21 Qingdao SITC shipping 1100TEU Container YangFan Shipyard 2X300 4 ABS Delivered H2185/86/ 87/88 Qingdao SITC shipping 76K Bulk Carrier YangFan Shipyard 2X1250 4 ABS On Board Delivered Hull No. / Ship Name Shipowner Ship Type Installation Place System Capacity(m3/h) Quantity (shipset) Class Delivery Time H2185/86/ 87/88 Qingdao SITC shipping 76K Bulk Carrier YangFan Shipyard 2X1250 4 ABS Delivered Costa Romantic a Costa Crociere S.p. A. Cruise Vessel Genova, Italy 1X200 1 RINA on Board DONG FANG Hong Institute of Oceanology, Chinese Academy of Sciences Sience&Research Wuchang Shipbuilding 2X300 1 CCS on Board A943L SHANGHAI MARITIME BUREAU Sea Potral Vessel Wuchang Shipbuilding 1X200 1 CCS on Board SH015/016 CONSOLIDATED PIPE CARRIERS PTE LTD Offshore Supply Vessel Taizhou Senhe Shipyard 1X500 2 ABS Delivered Semi-submerged ship China Merchants Heavy Industry (Shenzhen) 2X300 1 CCS on Board Multi-Purpose Wison Heavy Industry (Nantong) 1X200 1 BV on Board Container Xi Xiakou Shipyard, Weihai 1X300 1 ABS on Board CMHI-903 Tianjin Marine Enginerring VS465 Sartor Norway MV SITC YOKOHA MA Qingdao SITC shipping Till May, 2012, Headway has got orders of 33 shipsets, i.e., 59 sets of OceanGuardTM BWMS; More than one hundred of projects under negotiation…… Hope for cooperation with you soon. Thanks for your attention! Headway Technology Co., Ltd. 4/F, Bldg# 5,Area A, Huite Industrial City, No.177,Zhuzhou Road, Qingdao, China. 266101 Tel: (86) 532 8870 2807 / 08 Fax: (86) 532 8310 7816 Email: sales@headwaytech.com Web: www.headwaytech.com