GSC16-PLEN-13 - GSC-16 Halifax Canada 2011

advertisement
Document No:
GSC16-PLEN-13
Source:
ETSI
Contact:
Joachim Koss
GSC Session:
PLENARY
Agenda Item:
6.9
ETSI Standardization Activities
on M2M communications
Joachim Koss,
ETSI Board Member
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
GSC16-PLEN-13
Highlight of Current Activities (1)
• ETSI is
– developing standards to support an M2M architecture
and a set of capabilities for M2M services
– promoting innovation across the industry by providing
an end-to-end generic vision of the M2M
communications and services
The multiple vertical applications will be easily deployed
in a general framework, allowing development of
services independently of the underlying network
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
2
GSC16-PLEN-13
Highlight of Current Activities (2)
• European Commission Mandates on
– Smart Metering (M/441) TC M2M is leading TC,
co-ordinates all ETSI
– Smart Grid (M/490)
TCs, which contribute
– Charging of Electrical Vehicles (M/468)
• Multi Vendor interoperability DEMO
based on Release 1 set of specifications
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
3
GSC16-PLEN-13
ETSI TC M2M (1)
• specifies the interconnection fabric:
– capillary technologies provide device-M2M network
communications
• has active delegates from Europe, North America, China,
Korea, and Japan and currently about 30% Operators,
60% Manufacturers and 10% others
• has initiated active liaisons and cooperation with many
other SDOs and consortia (e.g. TIA, OMA, BBF) and in
particular has close relationship to 3GPP
– processes an open approach:
• published and draft TR/TS are available on the public side of the ETSI server
http://docbox.etsi.org/M2M/Open/
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
4
GSC16-PLEN-13
ETSI TC M2M (2)
• Working Groups
1. Use Cases & Requirements
2. Architecture & Network Interworking
3. Protocols & Interfaces
4. Security Aspects
5. Management Aspects
• Release 1 set of specifications will be approved in
11/2011
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
5
GSC16-PLEN-13
ETSI TC M2M (3)
• 8 plenary meetings per year plus numerous ad-hoc
meetings
• several conference calls per week
• constantly increasing the number of documents per
meeting (250 +)
• constantly increasing plenary participation (70 +)
• growing membership in M2M email list (395+)
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
6
GSC16-PLEN-13
ETSI TC ERM
• TG28
– has specific work items in support of
additional spectrum designations for key M2M
market segments:
• Short Range Device standards essential for
efficient capillary network deployment
• Work items for wireless smart metering/smart grid
systems
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
7
GSC16-PLEN-13
Strategic Direction
• Identify gaps where existing standards do
not fulfil the requirements
• Avoid overlapping of standardization
• Involve representatives across vertical
market solutions and industry segments
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
8
GSC16-PLEN-13
Challenges
• Multitude of technical solutions and dispersed
standardization activities result in the slow development
of the global M2M market, consolidation required
• End-to-end view for a globally interoperable framework
to facilitate Machine-to-Machine (M2M) business, flexible
for enhancements
• Timely availability, M2M solution fragmentation and
dispersing standardization is permanently proceeding
• Way to engage representatives of vertical ICT and non
ICT market/industry segments (convince by benefits,
collect and include their specific needs/requirements)
• Create global applicable standards also meeting the
specific regional and vertical segment needs (e.g. by
adaptations)
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
9
GSC16-PLEN-13
Next Steps / Actions
• Attract further liaisons and co-operations
• Involve more M2M stakeholders
• ETSI TC M2M will open Release 2 set of
specifications in its October meeting
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
10
GSC16-PLEN-13
Proposed Resolution (changes)
• Modifications proposed to existing
Resolution GSC-15/30 Machine to Machine
– Editorial update to current meeting data
– Adaptation of text concerning M2M Standardization
Task Force (MSTF) since it is already established
– Further content enhancements
• see separate document
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
11
GSC16-PLEN-13
Supplementary Slides
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
12
GSC16-PLEN-13
ETSI TC M2M - Specifications Work
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
13
GSC16-PLEN-13
TC M2M – High Level Architecture
M2M Device
M2M Gateway
App. Client
(Device)
App. Client
(Gateway)
dIa
M2M
AREA
NETWORK
dIa
WIDE AREA NETWORK
M2M Service
Capabilities
WIRELESS
mId
M2M SCL
Layer (SCL)
mIa
MOBILE
M2M
Application
Server #2
M2M Device
App. Client
(Device)
  
Proprietary
M2M Device
M2M
Application
Server #1
FIXED
dIa
M2M SCL
mId
M2M
Application
Server #n
.. OTHER
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
14
GSC16-PLEN-13
ETSI M2M - Major industry events
• October 2010 : 1st ETSI M2M Workshop. Sophia Antipolis.
– More than 220 participants,
– Collected output fed into ETSI M2M requirements.
• April 2011 : 1st ETSI Smart Grid Workshop. Sophia Antipolis.
– More than 280 participants,
– Examining the architecture for Smart Grids,
– Presentations from EU (Commission), US (NIST), China (State
Grid) and Japan .
• 26 – 27 Oct 2011 : 2nd ETSI M2M Workshop. Sophia Antipolis.
– Presenting the M2M Release 1 package,
– Examining future requirements of M2M standardization,
– Feedback from early implementations of M2M solutions,
– Multi Vendor interoperability DEMO.
– Information on events
http://www.etsi.org/WebSite/NewsandEvents/events
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
15
GSC16-PLEN-13
TC M2M – Links and Collaborations
Halifax, 31 Oct – 3 Nov 2011
ICT Accessibility For All
16
Download