Teezle TMatics M2M Platform & Solutions Overview January 28th, 2014 Our Journey 2009 1999 Built M2M Applications 2013 2011 Platform Development Founded Teezle Platform Validation – Reference Solutions/ Customer Launched TMatics Platform Launched Commercial 2 Our Journey • Complex device integration Lessons Learned “Unrealized business value” Launch an application in 2 weeks “Delivering significant business value” • Deriving actionable intelligence is challenging • Launching new vertical took years • Full cycle device management • Advanced analytics and Intuitive user experience • Prebuilt solutions and application dev. environment 3 Teezle Overview • Deep machine to machine expertise • 1.1 million devices in the system • 8 Industry Verticals • 50+ device models integrated 4 Reference Customer/Partners “Increased oil productivity” “Managing environmental risk” “Increased device manufacturing throughput” “Ensuring regulatory compliance” “Increased device management efficiency” Large Water Utility Company “Increased labor efficiency” Leading Tier 1 System Integrator “Taking vertical solutions to leading companies” “Deployed complex industrial applications” Large Brewery “Reduced pilferage” 5 TMatics Platform Overview Notification Predictive KPI Profiling Real-Time Context LBS Events Rules Transactions Device Decoder Adapter Router Device NAT Communication Wired Wireless Satellite Cellular Application Development Kit Analytics Cloud/On-Premise Infrastructure Integration Operation Business Support Systems UI/UX Device Management Presentation 6 Case Study – Oil & Gas Challenge • • • Labor intensive - Well watcher manually monitors and operates the oil pumps on stripper wells Oil spills and leakage – Expensive environmental clean up Inefficient and dry pumping - Unnecessary wear and tear and productivity loss • Deployed in 4 weeks • Command & Control system Our Solution Value Delivered • Oil productivity metrics • • • Prevented number of oil spills and leakage – $50k+ saving per incident 12% Increase in oil productivity 10% reduction in equipment operating cost 7 Case Study – Water & Utilities Challenge • • • Large Water Utility Company Labor intensive – Utility technician monitors water tank level and regulates PRVs locates miles apart Identifying faults and pipe damage Inefficient and outdated SCADA systems • Deployed in 3 weeks • Automatic cloud based flow control Our Solution Value Delivered • Supply-Demand Analytics • • • 30% increase in labor efficiency 15% reduction in operation expenses Fault prevention & identification – equipment failure, potential pipe damage 8 Case Study – Device Management Challenge • • • Device quality issues and difficulty managing devices through device life cycle stages Difficulty in keeping the device firmware and configuration up to date Identifying and troubleshooting faulty devices Our Solution • Deployed in 3 months • Complete visibility of devices from manufacturing floor to installation • Cloud based OTA management and diagnostic tools Value Delivered • • • 75% increase in device manufacturing throughput 35% reduction in operating cost 15% increase in device quality 9 Case Study – Others Environmental Monitoring Large Brewery – Transportation and Security 10 Summary 11 Problem Statement 2009 1999 Built M2M Applications Platform Development Started Teezle and Defined Vision Lessons learned • Integrating a device takes long – Multiple protocol, XXX • Device explosion • M2M data is unique – Machine characteristics • Lack of adaption due to complex user experience “Businesses not realizing value” 2013 2011 Platform Validation – Reference Customer/Partner Launched TMatics Platform Launched Commercial Strategy Platform that enables wide range of connected devices and connected applications • Take cost & complexity out of building a m2m application • Exponential speed to market – launch complex application in 2 weeks • Advanced analytics addressing M2M data characteristics • Intuitive user experience “Delivering significant business value” 12