ROSATOM STATE ATOMIC ENERGY CORPORATION “ROSATOM” Rosatom Global Development, International Cooperation Perspective 27.02.2013 Key Facts & Figures www.rosatom.ru 2 Fully Integrated Nuclear Technology Company Anniversary of Russian Nuclear Industry 2010 Uranium production Uranium enrichment www.rosatom.ru Fuel Power equipment fabrication manufacturing NPP Design, Engineering and Construction Electricity generation Services and modernization The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 3 Rosatom offers complete solution from uranium supplies to NPP construction operation and decommissioning Key Activities of Rosatom* Guaranteed supply of complete life-cycle products and services Flexible capabilities of NPP supply from components and services to turn-key and BOO projects Fuel fabrication Mining Research and development TVEL ARMZ Conversion and enrichment Being a state corporation Rosatom is taking advantage of unique industry access to privilege resources TVEL Tenex Gas centrifuges manufacturing TVEL * Boxes include names of key Rosatom’s subsidiaries in the relevant sector www.rosatom.ru 15 research organizations Power equipment NPPs engineering and services & construction AEP ASE SPbAEP Gidropress NiAEP OKBM NUKEM Technologies Spent nuclear fuel treatment Nukem Technologies Mayak, GHK Atomenergomash Rusatom Service Power Generation Rosenergoatom The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. Boxes include names of key Rosatom’s subsidiaries in the relevant sector 4 Rosatom Global Operations #1 in key segments 5 continents. More than 40 countries. Europe Finland, Sweden, the Netherlands, Belgium, Germany, France, Spain, GB, Switzerland, Czech Republic, Slovakia, Hungary, Lithuania, Bulgaria, Slovenia in uranium enrichment CIS Russia, Ukraine, Kazakhstan, Belorussia, Armenia North America USA, Canada, Mexico in new NPPs construction Asia China, Japan, South Korea, Vietnam, India, Bangladesh, Mongolia MENA Turkey, Libya, Morocco, Algeria, Egypt, Iran, Jordan Latin America Russian electricity generation Venezuela, Argentina, company, 25,2 GWe installed capacity Brazil Australia Africa Namibia, South Africa, Tanzania www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 5 Nuclear Innovation – Variety of Applications Nuclear Icebreaker Fleet - #1 nuclear fleet in the world - Assures stable functioning of Northern Sea Route Fast Reactors (Gen IV) - #1 fast neutron reactor in the world - #1 operating fast neutron reactor in the world - Broad development programme Small and Medium Size Reactors - Variety of different designs with referent parameters - #1 floating NPP in the world is being built - #1 successful public-private partnership for developing SMR Radiation Technologies - Isotope production - Nuclear medicine - Irradiation facilities www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 6 Radiation Technologies – one of the most promising areas of nuclear applications Rosatom Radiation Technologies Business Nuclear medicine Origination and execution of Investment projects in fields of medical isotopes and equipment - Medical equipment sales and servicing - R&D management - www.rosatom.ru Irradiation facilities - Contract irradiation - Equipment production, engineering and maintenance - Production of radiation modified materials Ecology - Waste management - Water treatment Detection systems - Security and nondestructive testing solutions The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 7 Russian Experience in Design and Construction of Research Reactors in Foreign Countries Ukraine Ukraine Belarus IR-100, 0.2MW VVR-M, 10MW IRT-M, 4MW Uzbekistan Kazakhstan Kazakhstan VVR-K, 6MW IVG, 1.60MW VVR-SM, 10MW Latvia IRT-M, 5MW Kazakhstan IGR Georgia Czech Republic LVR-15, 10MW IRT-M, 8MW North Korea IRT, 8MW Germany RFR-10, 10MW Serbia China RFR-10, 10MW Iraq RA, 6.5MW IRT-5000, 5MW Vietnam Hungary DRR, 0.5MW BRR, 10MW Poland Romania VVR-S, 2MW EVA,10MW Libya Bulgaria IRT-1, 10MW IRT-2000, 2MW Egypt Poland MARIA, 30MW ETRR-1, 2MW Reactor Type: www.rosatom.ru - Tank - Heavy Water - Pool - Pulse - Channel in Pool The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 8 Rosatom in 2020 2020 Targets Rosatom is among Top 3 nuclear companies (by revenue in key segments) More than 50% of revenue comes from global operations More than 25% of revenue is generated by overseas assets Key Actions Localize all business segments operations in key markets Benefit from global talents and local workforce Establish multiple alliances and partnerships with global and local players Source, develop and transfer technologies to maintain global leadership Take full advantage of global capital market Ensure business transparency as a key operating standard Globalization of operations is the key priority www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 9 Promotion of Rosatom global development is implemented by Rusatom Overseas Key Activities of Rusatom Overseas Rosatom overseas NPP & RR new build projects development Rosatom global marketing management and marketing offices network development and operation Management of Rosatom Globalization program www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 10 Rosatom intends to open 21 foreign marketing offices all over the world by the year 2014 Rosatom marketing offices map 2012-2014 United Kingdom Canada Belorussia Netherlands USA China CEE Czech Republic Slovakia Hungary Bulgaria Mexico Kazakhstan Ukraine Jordan Egypt Korea India Japan Bangladesh Thailand Vietnam Philippines Malaysia MENA UAE Singapore Indonesia Saudi Arabia Brazil Rosatom marketing offices opened / adjusted according to the Policy (Amount) as of end year 2012 (10) as of end of year 2013 (7) as of end of year 2014 (4) Australia South Africa Chili Argentina Regional office Categories of marketing offices Country office *In italics are the countries included in zone of responsibility of a country office www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 11 Post Fukushima: responsible vendor approach www.rosatom.ru 12 Fukushima accident haven’t strongly affected the plans for nuclear energy development globally Eastern Europe North America 38 Western Europe 150 135 24 24 32 29 Russia 31 Korea 113 113 114 114 111 99 120 123 114 114 47 44 34 32 24 24 38 38 2012 2020 2030 30 31 2012 2020 2030 China 2012 2020 2030 120 124 21 21 74 2012 2020 2030 18 MENA 54 22 India 13 26 27 10 Installed capacity GW, reference scenario World 12 12 -12% 17 11 2012 2020 2030 South Africa 652 7 37 37 South-East Asia 2012 2020 2030 -11% 62 36 2012 2020 2030 19 19 Latin America Japan* 2012 2020 2030 66 34 2012 2020 2030 5 5 10 7 9,4 588 2012 2020 2030 2012 2020 2030 Rosatom’s portfolio 515 460 2012 2020 2030 21 365 365 12 2012 2020 2030 2010 2011 Rosatom’s scenario before Fukushima Rosatom’s scenario after Fukushima www.rosatom.ru Source: Rosatom * Does not include national nuclear power program potential strategy revision (to be revised shortly) The content of this preсоsentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 13 Rosatom safe and mature VVER technology is one of the most referenced… VVER Global Fleet Country Constructed Armenia 2 1 Bulgaria 6 2 China 2 2 Czech Republic 6 6 Finland 2 2 Germany 6 - Hungary 4 4 Iran 1 1 Russia 17 17 Slovakia Slovakia 6 4 Hungary Ukraine 15 15 TOTAL 67 54 Finland Russia Germany Ukraine Bulgaria Armenia China Iran Czech Republic In operation All Russian designed reactors, including 37 VVER units operating outside Russia, successfully passed stress-tests, among those - 18 VVER units in 5 EU countries Rosatom actively supported and is confident in the results www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 14 Rosatom operating NPP fleet in Russia Kola NPP Leningrad NPP Bilibino NPP Kalinin NPP Smolensk NPP Beloyarsk NPP Novovoronezh NPP - VVER - RBMK - BN - EGP Balakovo NPP Kursk NPP Rostov NPP Balakovo NPP Kola NPP Kursk NPP Leningrad NPP Beloyarsk NPP Units in operation: 4 Units in operation: 4 Units in operation: 4 Units in operation: 4 Units in operation: 1 Capacity: 4000 MW Capacity: 1760 MW Kalinin NPP Novovoronezh NPP Capacity: 4000 MW Rostov NPP Capacity: 4000 MW Smolensk NPP Capacity: 600 MW Bilibino NPP Units in operation: 4 Units in operation: 3 Units in operation: 2 Units in operation: 3 Units in operation: 4 Capacity: 4000 MW Capacity: 1880 MW www.rosatom.ru Capacity: 2000 MW Capacity: 3000 MW Capacity: 48 MW The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 15 Construction NPP in Russia Rostov NPP, unit 1: VVER-1000 First criticality: Jan2001. Grid connection: Mar2001 Kalinin NPP, unit 3: VVER-1000 First criticality: Okt2004. Grid connection: Dec2004 Rostov NPP, unit 2: VVER-1000 First criticality: Jan2010. Grid connection: Mar2010 Kalinin NPP, unit 4: VVER-1000 First criticality: Nov2011. Grid connection: Nov2011 9 Units under construction: Novo-Voronez NPP-2, unit 1: VVER-1200; unit 2: VVER-1200 Beloyarskaya NPP, unit 4: BN-800 (fast reactor, capasity 800 MW) Leningrad NPP-2, unit 1: VVER-1200; unit 2: VVER-1200 Rostov NPP, unit 3: VVER-1000; unit 4: VVER-1000 Baltic NPP, unit 1: VVER-1200; unit 2: VVER-1200 6 Units in license stage: Leningrad NPP-2/ 3&4; Nizhniy Novgorod NPP/ 1&2; Kursk NPP-2/ 1&2 www.rosatom.ru 16 Tianwan NPP, China Lianyungang, Jiansu province Key Parameters Reactor design: VVER-1000 Tianwan Total Gross Capacity: 2120 MW (2 x 1 2 1060 MW) First criticality: 20 Dec 2005 (unit 1) 01 May 2007 (unit 2) First grid connection: 12 May 2006 (unit 1) 14 May 2007 (unit 2) Commercial operation date: 17 May 2007 (unit 1) 16 Aug 2007 (unit 2) Legal basis: IGA (1992) www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 17 Busher NPP, Iran Key Parameters Reactor design: VVER-1000 Total Gross Capacity: 1000 MW (1 x 1000 MW) First criticality: 08 May 2011 First grid connection: 03 Sep 2011 Commercial Operation Date: 30 Jul 2012 (anticipated date) Legal basis: IGA (1992) Construction on the “turn-key” basis www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 18 Kudankulam NPP, India Key Parameters Reactor design: VVER-1000 Total Gross Capacity: 2000 MW (2 x 1000 MW) Fuel loading: nov 2012 First grid connection: febr 2013 (anticipated date) Legal basis: IGA (1998) www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 19 …and is highly welcomed worldwide… Czech Republic 2 Slovakia 1 Hungary 2 Bulgaria 1 Finland 1 Belorussia 2 Nigeria 2 Brazil 4 Argentina 2 Russia 9 Ukraine 2 Kazakhstan 2 9 Armenia China 1 Turkey 2 4 2 India Bangladesh 2 Vietnam 4 2 Jordan 12 2 Malaysia 2 Saudi Arabia Indonesia 2 2 South Africa 8 34 30 28 22 In progress Tendering process/ negotiations Potential Rosatom NPP construction perspective backlog – more than 80 units www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 20 … being a part of Rosatom unique integrated NPP construction solution Energy Solution Modern NPP design (Gen III+) NPP construction and life cycle management support (fuel, services, modernization) Operation & maintenance Regulation, Infrastructure and Public acceptance Industrial Solution Creation and development of regulatory base NFC facilities construction, SNF & RW management, Social-political programmes support Rosatom Integrated Solution NPP equipment manufacturing, service & works localization, Technology transfer, Certification of local suppliers, participation in Rosatom third countries projects Financial Solution Knowledge, skills, human capital Personnel education & training (incl. traineeship on NPP sites), BOO projects implementation; R&D base development, Partnership projects State credits, NPP operation experience exchange - basic principle www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 21 Rosatom Gen III+ NPP design What is VVER? Protection from outer impacts (Water-Water Power Reactor) Forefront of nuclear technology – Generation 3+ reactor Proven and mature solutions – 1400 reactor years of total operating time A high level of internal safety gained through evolution of design Most demanded capacity suitable for various grid conditions – 10001200 MWe Long – run facility – design lifetime of the main equipment: 60 years High performing source of supply – availability factor ≈ 92 % www.rosatom.ru Hurricanes, tornadoes Airplane crash Snow load Tsunamis, floods Outside explosions Earthquakes Meets all current Russian and international safety standards and the IAEA requirements Widely referenced by utilities EUR certified The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 17 Key NPP Construction Projects Overview www.rosatom.ru 23 Akkuyu NPP project profile Key parameters Akkuyu is the first Rosatom’ foreign NPP project configured on BOO principles • Project value – $ 20 bn. • Implementation period – 2011-2021 • Legal basis – Intergovernmental Agreement of May 12, 2010 • Reactor design – NPP-2006 (VVER-1200) • Total capacity – 4 800 MW (4 units) • PPA period –15 years, fixed price terms Project highlights • First NPP project in Turkey Turkey • Sound Russian and Turkish State encouragement • Strong support to Turkey with regulatory system establishment and personnel training Site – Akkuyu, province Mersin, Turkey • The project is implemented in close cooperation with Turkish partners, involvement of Turkish suppliers mainly in civil construction • International investors are welcome to join the project with up to 49% Akkuyu SPV stake www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 24 Baltic NPP project profile Key parameters Baltic is the first Rosatom homeland NPP construction project open for involvement of foreign investors • CAPEX– € 5 bn. • Construction period – 2010-2018 • Legal basis – Resolution of the Government of Russian Federation, № 1353-p, 25.09.2009. • Reactor design – NPP-2006 (VVER-1200) • Total capacity –2 units x 1184 MW Russia Project highlights • Unique exclave territorial location • Fully complies with EC energy policy and EC supported • Meets EUR requirements Site – Kaliningrad region, Russian Federation • Significant export potential due to expected deficit of generation in the region • Involvement of foreign investors is envisaged • Strong political support from the Russian government www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 20 Reinventing supply chain www.rosatom.ru 26 Construction of a nuclear power plant brings numerous opportunities to suppliers Potential for external sourcing Exclusive Russian supply NSSS** Civil construction & engineering* ~10-15% Other Equipment Examples of realized supplies ~50% • • • • • • ~35-40% Examples of projects Project Country Capacity Cost Akkuyu 1-4 Turkey 4 x 1200 MW 20 bil. USD Belene 1-2 Bulgaria 2 x 1050 MW 6.3 bil. Euro Valves, pumps and piping (6%) Other equipment (5%) Air cooling systems (3%) Turbine and generator equipment (6%) Electrical equipment (9%) I&C (6%) Rosatom is ready for and has extensive experience in localizing&sourcing production for new NPP projects * Including design, project management, erection and commissioning works, training , etc. **Nuclear steam supply system www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 27 Order volume for NPP construction for Rosatom global projects Orders volume for 2011-2030 ≈ $290 bln. NSSS (Russian suppliers) 43,4 17,4 Civil construction & engineering 17,4 145,0 Turbine and generator equipment Valves, pumps and piping 26,0 Electrical equipment 17,4 ~ 15% - Russian supply 14,5 8,7 I&C Air cooling systems ~ 30-40% - local content Other equipment ~ 45-50% - global sourcing Rosatom needs to re-invent its global supply chain and is open for cooperation www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 28