NETPDTC Hosting Support

advertisement
NETPDTC
AIM Enterprise
Centralization
Peg David, NETPDTC N621, AIM Tech PM
Roy Hoyt, NETC N74 Functional PM/Resource Sponsor
Bruce Bare, NETC N62
AIM Team: Tiffany Dombrowski, AIM PM
Ron Zinnato, Lead Engineer
18 Sep 2012
Overview
•
•
•
•
•
•
•
Enterprise Site AIM I/AIM II & CPM Rel 5.0
hosting
Authority to Operate (ATO)
Planning for eDMZ and SSC NOLA Transition
Issues Non-NETC Sites/Commands
AIM Content Repository RIS/Requirements
AIM IMI Library demos
AIM Central Site Hosting at NETPDTC
•
NETC N74, N6 and NETPDTC Enterprise Migration Plan
–
•
Nearly complete migrating AIM content and processing
to NETPDTC Citrix Metaframe-based servers
Benefits Include:
‒
Simultaneous access by geographically dispersed Center
and contractor personnel for collaborative development
and maintenance
‒
Support for future centralized enterprise data mining for
reuse, repurpose, and reference (R3)
‒
Significantly faster access to software updates
‒
Potential for automated workflow
CPM Hosting at NETPDTC
•
Benefits Include:
‒
Enterprise production hosting and support vs. current
contractor environment with limited server
configuration and bandwidth
‒
Leverages NETC domain sys admin, database
management, and information assurance expertise at
NETPDTC
‒
Co-located with rest of NETC enterprise IT applications
and off-site COOP support
‒
Secure access from both .mil and .com domains
Centers’ Transition Schedule
CENTER
POC
SCHEDULE
USER ACCTS
CNATT
ATC Hamilton
Oct 10 – Apr 11
500+
CSFE
Dave Donnelly
Mar – Jun 11
50
SSP
Len Randel
Sep 11
60
CID
Joe Pekarske
Apr - Jul 12
16 (50)
CSCS
Jessie Harris
Apr – Jun 12
75 (100)
CSS
Michael Buechel
Apr – Jun 12
23 (20)
CHAPS
Claire Olona
May – Jul 12
9 (12)
CPPD
Rick Bly
May – Jul 12
23 (30)
CSF
Roy Wilde
Jul – Sep 12
14 (20)
SWOS
D. Harrison-Youngs
Aug – Sep 12
8 (100)
CEODD
Marion Conley
Aug – Sep 12
5
SLC
Pedro Moore
Aug – Oct 12
5 (200)
AIM ATO Status
•
NETC/ODAA treating Central AIM as ‘new’ System
standing up inside eDMZ
•
As such, Interim Authority to Test (IATT) granted to
build servers/test: 16 May – 30 Nov 2012
•
C&A Package in NETPDTC IA review, NETPDTC IA
submission due to NETC IA 28 SEP
•
C&A reviews: NETC IA max 45 days/ODAA max 90
days
•
Deploying AIM Enterprise into PRODUCTION in
eDMZ dependent on ODAA-signed ATO
Risk & Risk Management
High
Medium
70
50
2
1
30
3
10
Probability
90
Low
1
2
3
Description:
1. NETPDTC Shared Services demand vs
capacity tenuous - competing high pri
projects, IA mandates, DCC TF NOLA
planning/support
2. Technical ‘gremlins’ & time to mitigate
3. ODAA 90 day review period
4
Impact
5
Mitigation Plan:
• PMs/Task Leads monitor project tasks,
schedules & technical mitigations closely;
weekly status reviews
• Use lead/lag times to advantage; advancing
schedule where feasible
• Continue liaison closely w/ IA review teams,
adjudicate STIGs/Scans
• Goal: complete internal LOE NLT end SEP
AIM Central Site – eDMZ standup
•
Benefits AIM when Application migrates to SSC NOLA eDMZ
(FY14); technical mtgs forthcoming; identify roles /
responsibilities
•
Upon ATO receipt, Central Site will migrate into eDMZ;
data/accounts/CPM
•
Comms and Functional Test Plans coordinated with Centers /
Users/AIM Team; identify downtime date; Production Release
Review
consensus ‘go live’
deploy into Production
•
‘ESS’ CITRIX accounts transition to ‘NTSS’ CITRIX accounts; no
new form required; Centers validate their users/info on
spreadsheet ; PM office to maintain SAAR repository
•
Remaining Centers/accounts or new commands will transition
directly into eDMZ
AIM Central Site – CPM eDMZ standup
•
Production CPM remains hosted by AIMEREON
until ODAA grants ATO for AIM eDMZ
‒
CPM Rel 5.0 server builds complete in eDMZ
‒
Conducted formal GAT working w/ AIM SSO
‒
CeTARS Web service, AIM enterprise data
environment Web service, and PPP Repository
integrated into CPM on NETPDTC server
‒
ATO allows .mil and .com access
Issue:
Privilege Levels
•
5 levels implemented in Central Site AIM II per
CNATT request
•
3 levels implemented in Central Site AIM I per
SSP request
•
CPM-style role/privilege structure tasked and
funded by NETC N74/NAWCTSD
–
Via AIMEREON Task Order 0011 Task 3.2.8
–
Scheduled be on-line Dec 2012
Issue:
Hosting Test Environment
•
NMCI AIM users needed to test ongoing system
enhancements as part of formal Govt Acceptance
Testing (GAT) process
•
Cannot install in-process AIM updates on local NMCI
PCs nor access contractor-hosted virtual server to
conduct tests
•
NETPDTC to establish test instances of AIM I and AIM
II to support ongoing requirement
Issue:
Blocking Word Macros
•
NMCI does not allow MS-Word macros to be
enabled on NMCI desktop PCs once Win 7/Office
2010 is installed
•
This poses crippling limitation on stand-alone
desktop installations of AIM under NMCI
•
Options for AIM Central site inside eDMZ?
Issue:
Software Release Process
•
CNATT Migration to AIM II Rel 5.0; currently using
AIM 4.0
•
CNATT requirement to maintain local NMCI AIM II
instances to support effective community-wide
business process
•
Discussion re NMCI certification process / schedule
•
Impact of NMCI certification delay / push of Rel 5.0
Issue: NOFORN NNPI
•
Affects primarily non-SWS undersea community –
NAVSEA 07TR, SLC, SLC learning sites
•
Stringent data handling controls re unclassified No Foreign
Dissemination Navy Nuclear Power Information, mandated
by NAVSEA 08
•
NETC/NETPDTC stood up SLC enclave on TRANET_C (NAS
PCOLA) to host: ref matl, e-library, IETMs, NNPI content,
course curriculum info, AIM content, NNPI/NOFORN, used
by SLC DETs
–
How does this fit into AIM program from enterprise view?
–
Rqmt to host AIM Application on TRANET_C? For SLC /
others?
–
Is TRANET_C interim option until NOLA data center
migration? – SSC NOLA is certified for NOFORN data
Non-NETC Sites Implementation
•
1 Oct 11 - SSP TRIDENT AIM I Central Site instance
transitioned from NAWCTSD to NETPDTC – fully
operational – AIM I and LO Module production work
•
NAVSEA 07TR AIM I Central Site instance TBD per
decision re support for NOFORN NNPI data
•
Other interested communities:






Navy Medicine
NAVSPECWARCEN (hosted by NAVSOC)
NAVRES
DANTES
Regional Maintenance Centers – Norfolk / San Diego
Naval Shipyards (hosted in Norfolk)
AIM Content Repository RIS
Enterprise Requirements’ RIS for Ancillary Data Storage Area
•
•
•
NETC needs Content Repository – store data/files – Configuration
Mgmt
Partner with existing ‘system’
Current link from NMCI seats to TRANET storage will be ‘broken’ – part of
network migration – no reach back
Notional Plan
•
•
•
•
Expand current centrally managed ‘AIM enterprise’ content repository –
accessible by CAC from .com/.mil with fully adequate storage space
AIM Enterprise has multiple components: AIM I, AIM II, CPM, LO and
ancillary file shares
Configuration management (could be COTS product) needed;
as well as business rules/governance
DRAFT RIS distro’d to all Centers for collating requirements/comments
AIM Central Site Implementation
•
•
Points of contact:
‒
NETC N74: Leslie Desenburg
‒
NETPDTC: Peg David; Christopher Stark/Charlie Odom
(Metaframe Sys Admins)
‒
AIM team: Ron Zinnato/Steve Wicinski/Jim Ferrall
Implementation resources including POC and
schedules, planning document templates, and narrated
help videos available on AIM information Web page:
http://aim.aimereon.com/aim/AIM-Central-Site-Hosting-atNETPDTC.ashx
CPM Hosting POCs
•
NETC N74: Leslie Desenburg
•
NETPDTC: Peg David / Bob Rayburn (Web
Apps BH)
•
AIM team: Ron Zinnato / Steve Wicinski /
Mike Coyle / Jim Ferrall
AIM IMI Library Demos
AIM I/II
• CPM
• Possible extension of Web-based PPP
Repository derived from CPM code
•
Questions?
Backup Slides
Center Transition Planning
•
Kick-Off Meeting with each Center POCs
•
Centers review/assist draft Transition Plan, roles and
responsibilities, POAM, Test Plan, Q/A’s
•
Identify data transfer method; data quantity
•
Review and understand ESS/CITRIX Account Creation
Process – Form, SAAR, Center IAM role
•
Review templates, lessons learned, forms, user
guides – all found at:
http://aim.aimereon.com/aim/AIM-Central-Site-Hosting-at-NETPDTC.ashx
Implementation Issue: Jobs Server
•
A number of processes in AIM I/II take a long time to
complete: e.g., Trainee Guide print preview, large course
export, large course import
•
Current NETPDTC implementation requires Central Site
user to remain logged into Citrix session with CAC inserted
in local workstation until process completed
•
Jobs Server concept developed by NETPDTC and AIM teams
would permit user to begin long-running process, transfer
process to Jobs Server, end Metaframe session, and then
log back into Metaframe later to retrieve product of longrunning process completed on Jobs Server
•
Functionality tasked/funded under new Task Order to
AIMEREON
Implementation Issue:
Job Server approach
(contd)
Metaframe Servers
Jobs Server
Job Request
File Share
Job Output
Check for Completion/
Retrieve Output
AIM Central Site Architecture