NETPDTC AIM Enterprise Centralization Peg David, NETPDTC N621, AIM Tech PM Roy Hoyt, NETC N74 Functional PM/Resource Sponsor Bruce Bare, NETC N62 AIM Team: Tiffany Dombrowski, AIM PM Ron Zinnato, Lead Engineer 18 Sep 2012 Overview • • • • • • • Enterprise Site AIM I/AIM II & CPM Rel 5.0 hosting Authority to Operate (ATO) Planning for eDMZ and SSC NOLA Transition Issues Non-NETC Sites/Commands AIM Content Repository RIS/Requirements AIM IMI Library demos AIM Central Site Hosting at NETPDTC • NETC N74, N6 and NETPDTC Enterprise Migration Plan – • Nearly complete migrating AIM content and processing to NETPDTC Citrix Metaframe-based servers Benefits Include: ‒ Simultaneous access by geographically dispersed Center and contractor personnel for collaborative development and maintenance ‒ Support for future centralized enterprise data mining for reuse, repurpose, and reference (R3) ‒ Significantly faster access to software updates ‒ Potential for automated workflow CPM Hosting at NETPDTC • Benefits Include: ‒ Enterprise production hosting and support vs. current contractor environment with limited server configuration and bandwidth ‒ Leverages NETC domain sys admin, database management, and information assurance expertise at NETPDTC ‒ Co-located with rest of NETC enterprise IT applications and off-site COOP support ‒ Secure access from both .mil and .com domains Centers’ Transition Schedule CENTER POC SCHEDULE USER ACCTS CNATT ATC Hamilton Oct 10 – Apr 11 500+ CSFE Dave Donnelly Mar – Jun 11 50 SSP Len Randel Sep 11 60 CID Joe Pekarske Apr - Jul 12 16 (50) CSCS Jessie Harris Apr – Jun 12 75 (100) CSS Michael Buechel Apr – Jun 12 23 (20) CHAPS Claire Olona May – Jul 12 9 (12) CPPD Rick Bly May – Jul 12 23 (30) CSF Roy Wilde Jul – Sep 12 14 (20) SWOS D. Harrison-Youngs Aug – Sep 12 8 (100) CEODD Marion Conley Aug – Sep 12 5 SLC Pedro Moore Aug – Oct 12 5 (200) AIM ATO Status • NETC/ODAA treating Central AIM as ‘new’ System standing up inside eDMZ • As such, Interim Authority to Test (IATT) granted to build servers/test: 16 May – 30 Nov 2012 • C&A Package in NETPDTC IA review, NETPDTC IA submission due to NETC IA 28 SEP • C&A reviews: NETC IA max 45 days/ODAA max 90 days • Deploying AIM Enterprise into PRODUCTION in eDMZ dependent on ODAA-signed ATO Risk & Risk Management High Medium 70 50 2 1 30 3 10 Probability 90 Low 1 2 3 Description: 1. NETPDTC Shared Services demand vs capacity tenuous - competing high pri projects, IA mandates, DCC TF NOLA planning/support 2. Technical ‘gremlins’ & time to mitigate 3. ODAA 90 day review period 4 Impact 5 Mitigation Plan: • PMs/Task Leads monitor project tasks, schedules & technical mitigations closely; weekly status reviews • Use lead/lag times to advantage; advancing schedule where feasible • Continue liaison closely w/ IA review teams, adjudicate STIGs/Scans • Goal: complete internal LOE NLT end SEP AIM Central Site – eDMZ standup • Benefits AIM when Application migrates to SSC NOLA eDMZ (FY14); technical mtgs forthcoming; identify roles / responsibilities • Upon ATO receipt, Central Site will migrate into eDMZ; data/accounts/CPM • Comms and Functional Test Plans coordinated with Centers / Users/AIM Team; identify downtime date; Production Release Review consensus ‘go live’ deploy into Production • ‘ESS’ CITRIX accounts transition to ‘NTSS’ CITRIX accounts; no new form required; Centers validate their users/info on spreadsheet ; PM office to maintain SAAR repository • Remaining Centers/accounts or new commands will transition directly into eDMZ AIM Central Site – CPM eDMZ standup • Production CPM remains hosted by AIMEREON until ODAA grants ATO for AIM eDMZ ‒ CPM Rel 5.0 server builds complete in eDMZ ‒ Conducted formal GAT working w/ AIM SSO ‒ CeTARS Web service, AIM enterprise data environment Web service, and PPP Repository integrated into CPM on NETPDTC server ‒ ATO allows .mil and .com access Issue: Privilege Levels • 5 levels implemented in Central Site AIM II per CNATT request • 3 levels implemented in Central Site AIM I per SSP request • CPM-style role/privilege structure tasked and funded by NETC N74/NAWCTSD – Via AIMEREON Task Order 0011 Task 3.2.8 – Scheduled be on-line Dec 2012 Issue: Hosting Test Environment • NMCI AIM users needed to test ongoing system enhancements as part of formal Govt Acceptance Testing (GAT) process • Cannot install in-process AIM updates on local NMCI PCs nor access contractor-hosted virtual server to conduct tests • NETPDTC to establish test instances of AIM I and AIM II to support ongoing requirement Issue: Blocking Word Macros • NMCI does not allow MS-Word macros to be enabled on NMCI desktop PCs once Win 7/Office 2010 is installed • This poses crippling limitation on stand-alone desktop installations of AIM under NMCI • Options for AIM Central site inside eDMZ? Issue: Software Release Process • CNATT Migration to AIM II Rel 5.0; currently using AIM 4.0 • CNATT requirement to maintain local NMCI AIM II instances to support effective community-wide business process • Discussion re NMCI certification process / schedule • Impact of NMCI certification delay / push of Rel 5.0 Issue: NOFORN NNPI • Affects primarily non-SWS undersea community – NAVSEA 07TR, SLC, SLC learning sites • Stringent data handling controls re unclassified No Foreign Dissemination Navy Nuclear Power Information, mandated by NAVSEA 08 • NETC/NETPDTC stood up SLC enclave on TRANET_C (NAS PCOLA) to host: ref matl, e-library, IETMs, NNPI content, course curriculum info, AIM content, NNPI/NOFORN, used by SLC DETs – How does this fit into AIM program from enterprise view? – Rqmt to host AIM Application on TRANET_C? For SLC / others? – Is TRANET_C interim option until NOLA data center migration? – SSC NOLA is certified for NOFORN data Non-NETC Sites Implementation • 1 Oct 11 - SSP TRIDENT AIM I Central Site instance transitioned from NAWCTSD to NETPDTC – fully operational – AIM I and LO Module production work • NAVSEA 07TR AIM I Central Site instance TBD per decision re support for NOFORN NNPI data • Other interested communities: Navy Medicine NAVSPECWARCEN (hosted by NAVSOC) NAVRES DANTES Regional Maintenance Centers – Norfolk / San Diego Naval Shipyards (hosted in Norfolk) AIM Content Repository RIS Enterprise Requirements’ RIS for Ancillary Data Storage Area • • • NETC needs Content Repository – store data/files – Configuration Mgmt Partner with existing ‘system’ Current link from NMCI seats to TRANET storage will be ‘broken’ – part of network migration – no reach back Notional Plan • • • • Expand current centrally managed ‘AIM enterprise’ content repository – accessible by CAC from .com/.mil with fully adequate storage space AIM Enterprise has multiple components: AIM I, AIM II, CPM, LO and ancillary file shares Configuration management (could be COTS product) needed; as well as business rules/governance DRAFT RIS distro’d to all Centers for collating requirements/comments AIM Central Site Implementation • • Points of contact: ‒ NETC N74: Leslie Desenburg ‒ NETPDTC: Peg David; Christopher Stark/Charlie Odom (Metaframe Sys Admins) ‒ AIM team: Ron Zinnato/Steve Wicinski/Jim Ferrall Implementation resources including POC and schedules, planning document templates, and narrated help videos available on AIM information Web page: http://aim.aimereon.com/aim/AIM-Central-Site-Hosting-atNETPDTC.ashx CPM Hosting POCs • NETC N74: Leslie Desenburg • NETPDTC: Peg David / Bob Rayburn (Web Apps BH) • AIM team: Ron Zinnato / Steve Wicinski / Mike Coyle / Jim Ferrall AIM IMI Library Demos AIM I/II • CPM • Possible extension of Web-based PPP Repository derived from CPM code • Questions? Backup Slides Center Transition Planning • Kick-Off Meeting with each Center POCs • Centers review/assist draft Transition Plan, roles and responsibilities, POAM, Test Plan, Q/A’s • Identify data transfer method; data quantity • Review and understand ESS/CITRIX Account Creation Process – Form, SAAR, Center IAM role • Review templates, lessons learned, forms, user guides – all found at: http://aim.aimereon.com/aim/AIM-Central-Site-Hosting-at-NETPDTC.ashx Implementation Issue: Jobs Server • A number of processes in AIM I/II take a long time to complete: e.g., Trainee Guide print preview, large course export, large course import • Current NETPDTC implementation requires Central Site user to remain logged into Citrix session with CAC inserted in local workstation until process completed • Jobs Server concept developed by NETPDTC and AIM teams would permit user to begin long-running process, transfer process to Jobs Server, end Metaframe session, and then log back into Metaframe later to retrieve product of longrunning process completed on Jobs Server • Functionality tasked/funded under new Task Order to AIMEREON Implementation Issue: Job Server approach (contd) Metaframe Servers Jobs Server Job Request File Share Job Output Check for Completion/ Retrieve Output AIM Central Site Architecture