Project Planning and Progress Michelle Page | Design Build Engineer August 2, 2011 Project Need • EIS initiated in 2004 • Utah County annual growth rate of 5.5% • Projected 2030 Utah County population: 907,210 (a 22-year growth rate of 75%) • Aging infrastructure 40+ years old Project Funding • EIS from 12300 South to South Payson completed August 2008 • 43-mile corridor estimated cost $5 billion • 2009 Legislature allocated $1.725 billion • Motto 1: Be Flexible • Motto 2: Stretch south Fixed-Price, Best-Design Approach • Bidders develop highest-value, creative solution for fixed construction budget • Proposals evaluated on meeting or exceeding defined criteria, based on project goals • Fosters competition, innovation • Best opportunity to achieve the most length, greatest number of improvements for set price Project Goals Project goals and values approved by Transportation Commission: Deliver I-15 CORE within the Budget Provide the Highest Value for the Budget Minimize Inconvenience to the Public Complete I-15 CORE by 2014 Uphold the Public Trust Fixed-Price Procurement Process Project Goals Values Statement DB Proposals Value-Based Selection More information at udot.utah.gov Instructions to Proposers Procurement Schedule Released RFQ: April 2009 Design-builders submitted SOQs: May 2009 Short listed design-builders: May 2009 Commission endorsed values statement: May 2009 Issued RFP: June 2009 Conducted industry outreach and technical proposal discussions: June – October 2009 Design-builders submitted proposals: November 19, 2009 Announced selected design builder: December 9, 2009 Issued NTP1: January 14, 2010 Issued NTP2: April 19, 2010 Selected Design-Build Team Provo River Constructors: • Fluor Enterprises • Ames Construction Company • Ralph L. Wadsworth Construction Company • Wadsworth Brothers Construction Company • Fluor/HDR Global Design Consultants • Michael Baker Jr. • Jacobs Engineering Group • H.W. Lochner • Kleinfelder West • Intermountain GeoEnvironmental Services • CRS Consulting Engineers • Raba-Kistner Consultants • TransCore IP • Stillwell & Associates • Applied Research Associates • Fehr & Peers Transportation Consultants • Psomas • CME Transportation Group Final Project Scope Subject to change Progress Update • • • • Project design completed Project approximately 50% complete On schedule for December 2012 completion Approximately $2 million of work every day during peak construction Materials • 5 million tons of fill placed • 30 miles of pipeline laid Concrete Paving • 1 million square yards of concrete placed to date • 2.7 million total for the project • Can place 10,00015,000 square yards per day Bridges • 3 reconstructed bridges open to traffic • 35 bridges currently under construction Sam White Bridge Move Labor • 3.2 million work-hours to date • Current crew, staff and management: 1,500 Phase-One Traffic Configuration Phase-Two Configuration Head-to-Head Configuration, Phase One Quality Program Design-Builder’s Role • Quality Control • Quality Assurance UDOT’s Role • Quality Oversight Independent Assurance Role • Certification and testing Public Involvement Approach • Owner responsible for all public communication and outreach – Team includes managers dedicated to media, social media, elected officials, and geographic project segments – Owner controls messaging and communication strategy • Design-builder responsible to provide accurate, up-to-date information to PI team Keeping the Public Informed Annual Survey How well do you think UDOT is doing on the following? 7.00 1=Very poor, 7=Excellent 6.00 5.18 5.00 4.91 5.27 4.00 3.00 2.00 1.00 Doing a quality job Managing traffic 2011 Communicating traffic delays, closures, other info Annual Survey Overall, do you think I-15 CORE is worth the investment? 100% 95% 93% 90% 80% 70% 60% 50% 40% 30% 20% 10% 4% 5% 0% Definitely or Probably Probably not or Definitely not 2010 2011 For More Information E-mail: i15core@utah.gov Website: udot.utah.gov/i15core Hotline: 1-888-i15core Text messaging: text "i15" to 53535 Facebook: facebook.com/i15core Twitter: twitter.com/i15core Weekly e-mail updates: sign up at udot.utah.gov/i15core Questions