Telescope Optical Units (TOUs) Overview of the TOU Team organization during PLATO 1.0 & TOU timeline and plans during phase B1/B2 TOU Team Meeting Catania 11 June 2014 Isabella Pagano (TOU PM) TOUs during PLATO 1.0 organization Payload Instrument System Coordinator P. Levacher PLATO Payload Management PIPM: P. Bodin Camera Management DPS Management D. Laubier B. Pontet TOU R. Ragazzoni Normal TOU R. Ragazzoni ICU R. Cosentino Normal DPU Ph. Plasson Fast TOU W. Benz FPA/FEE D. Walton/M. Mas Prototype & FM AIV P. Levacher AEU Catania, 11 June 2014 S. Fredon Hardware & boot software M. Mas Application software Ph. Plasson Fast DPU G. Peter Algorithms R. Samadi TOU Meeting TOUs during PLATO 1.0 organization N-TOU and F-TOU delivered by IT in the PLATO 2.0 plan TOUs during PLATO 1.0 Our mandate • Provide optical – mechanical design performing as required by Science • Compliant with the assigned budget • Feasible in the due time • Reliable in the given environments Catania, 11 June 2014 TOU Meeting TOUs during PLATO 1.0 How we managed A large team: • INAF – Padova – Catania – Milano • • • Univ. Bern Stockolms Obs. Univ. Firenze • Industrial Partners – – – – – Selex Medialario-Sagem Seso RUAG APCO Technologies Catania, 11 June 2014 TOU Meeting TOUs during PLATO 1.0 How we managed A large team: • INAF – Padova – Catania – Milano • • • • A huge number of meetings/telecons: Univ. Bern Stockolms Obs. Univ. Firenze • TOU Team • Bilateral TOU-System Teams Industrial Partners • TOU-FPA System Teams – Selex – – – – Medialario-Sagem Seso RUAG APCO Technologies Catania, 11 June 2014 TOU Meeting TOUs during PLATO 1.0 How we managed • Design (Optics, Mechanics, Thermal, ..) • Demonstration Activities – TOU AIV procedure – TOU Optical and Thermal Performances – TOU Optical Lenses Procurement Breadboard/ Prototype • Feasibility Studies – – – – TOU MAIT and Management Plan TOU optical coating plan TOU aspherical lens manufacturability & procurement plan TOU AlBeMet® Structure Procurement Plan Catania, 11 June 2014 TOU Meeting BreadBoard/Prototype • “pre-breadboard” the structure built with offthe-shelf lenses used to test GSE and procedures to be used with the breadboard. • “breadboard” the structure built to test alignment in warm and cold environment before the I-PRR • “prototype” the structure built after the IPRR, during the Phase B1 (in the PLATO 1.0 context) , obtained from the breadboard, replacing the L1 and L2 lenses. Catania, 11 June 2014 TOU Meeting TOUs during PLATO 1.0 What we delivered - Officially At I-PRR (deadline April 2011) • PMC TOU plans Source: TOU Team - Date: 4 May 2011 • PLATO TOU Project Management Plan: Source: Selex, 20 April 2011 • PLATO TOU MAIT Plan: Source: Selex, 20 April 2011 • PLATO aspherical lens (ref.11-6219 ed03): preliminary technical, management proposal – Source: Medialario/Sagem-Reosc, 3 May 2011 • PLATO Coating - Source: Selex, 22 April 2011 • PLATO TOU Design Report: Source: TOU Team, Date 18 April 2011 - included in the 02_Payload-design-report_draft11.pdf Catania, 11 June 2014 TOU Meeting TOUs during PLATO 1.0 What we delivered – Unofficially 1/2 Not included in any package to ESA but delivered to CNES and O. Piersanti (former ESA PM) between March and July 2011: • CaF2 lens blank: Thermal Vacuum Test Report - Filename: PLATO-CAMTOLE-RP-154-CNES, Issue 1, Rev. 0, Date: Jul 21st 2011, Prepared by: H. Pasquier - delivered to Piersanti • Vibration Test Report: L3 CaF2 Vibration Test Dummy Filename: Test_509_PLATO_dummy_lens_mount__report.pdf Authors: M. Greber, D. Piazza, K. Seiferlin, P. Christiansen, 20th Jun 2011 - delivered to CNES and Piersanti • PLATO TOU Breadboard/Prototype: Design and AIT Report filename: PLATO-INAF-TOU-RP-0013-issue02-rev0-2.pdfAuthors: J. Farinato, V. Viotto, D. Piazza et al., Issue 2, Rev. 0, Date: 13 Jul 2011 - delivered to CNES and Piersanti Catania, 11 June 2014 TOU Meeting TOUs during PLATO 1.0 What we delivered – Unofficially 2/2 • AlBeMet® Structure Procurement Report - author "APCO Technologies” – delivered to CNES on May 12 2011 • Study on the aspherical lens performed by RUAG - delivered to CNES oo 18 Jul 2011 Less relevant… • PLATO TOU - Letter of Interest - author: SAGEM/REOSC delivered to Osvaldo Piersanti (ESA) (March 2011) • PLATO TOU - Letter of Interest - author: SESO - delivered to Osvaldo Piersanti (ESA) (March 2011) Catania, 11 June 2014 TOU Meeting TOUs during PLATO 1.0 What we left open • Optical Design Consolidation • see Magrin presentation for details • Breadboard activities – see Farinato et al. presentation for details • Mechanical Design – Finite Element Model of the current mechanical design, including evaluation of the first eigenfrequency. • Interfaces – Verification of the interfaces of the finite element model with the lenses and their effects. • Filter design – Engineering consolidation Catania, 11 June 2014 TOU Meeting PLATO 2.0 TOU 2.0 Catania, 11 June 2014 TOU Meeting PLATO 2.0 timeline – Phase B2 Jul 2014-Jan 2016 – Phase B1 kick-off: Jul 2014 – Science Management Plan approval: Nov 2015 – Payload Development and Consolidation Review: March 2015 – SRR data package: 1 Nov 2015 – SRR: completed by Jan 2016 – Mission adoption & IPC approval: Feb-Mar 2016 Catania, 11 June 2014 TOU Meeting PLATO 2.0 timeline – Phase B2C/D/E1 Q1 2016-Q1 2024 – Industrial ITT for Phases B2/C/D/E1: Apr-Sep 2016 – Industrial Prime contractor kick-off: Oct 2016 – System PDR: by 2017 (tbc) – System CDR: by mid-2020 (tbc) • Payload CDR by 2018 (tbc) – Delivery of all Cameras: Q4 2021 – PLATO Launch: Q1 2024 Catania, 11 June 2014 TOU Meeting Phase B1: SRR Objectives 1/2 • PLATO Phase B1 objective is the adoption of the PLATO mission by SPC in Feb-March 2016. • The PLATO System Requirements Review (SRR) to be completed by January 2016 is a major input to PLATO mission adoption. • The SRR is a formal review (category 1 i.e organized by ESA inspector general, D/SRE is the chairman). • The primary objective of the SRR is to review in detail: – – – – The final payload and spacecraft system specifications, The payload and spacecraft design definition, The payload and spacecraft development and verification program, Mission programmatic and cost. Catania, 11 June 2014 TOU Meeting Phase B1: SRR Objectives 2/2 • The camera development schedule is critical, and is actually defining the schedule critical path for the spacecraft. Hence: – The camera detailed design activities (including AIV plans and Ground System Equipment design) shall be completed before the SRR, – The critical bread-boarding activities (e.g. electronics Demonstration Models, optics) shall be initiated during phase B1, – Consortium input to the SRR shall demonstrate that the camera Engineering Model - which is fully representative of the flight model except for some electronics parts - will be completed by early 2017, – A detailed development plan of the payload shall demonstrate by SRR that: ?? • serial production phase will start by mid-2017, • the first batch of 8 cameras will be delivered in November 2020, • the last batch of cameras will be delivered by November 2021. Catania, 11 June 2014 TOU Meeting TOUs during PLATO 2.0 Phase B1 goal Our proposal: deliver all ready but undelivered documents: • Design: – Consolidated TOU Design Report (Optical Design, Mechanical Design, Thermal Analysis, Stray-light Analysis, Optical Material Analysis and Coating Design, ..) • Breadboard: – Consolidated BreadBoard AIV report • NEW: including a critical review of results and assessment of some open issues • CaF2 tests • AIV Design: – Consolidated TOU MAIT and Management Plan – Consolidated AlBeMet® Mechanical Structure Procurement Assessment Study – NEW: F-TOU Filters Design Procurement Assessment Study TOUs during PLATO 2.0 Phase B2 goal • Design: – Engineering of TOU Design (Optical Design, Mechanical Design, Thermal Analysis, Stray-light Analysis, Optical Material Analysis and Coating Design, ..) • Breadboard Prototype – Lens set like the FM one (change of 2 lenses and replacement of one lens previously accepted with no conformance issue because short in time – optical quality test (in term of PSF shape and dimension) on the whole FoV. • AIV Design: – Finalized TOU MAIT and Management Plan – Finalized AlBeMet® Mechanical Structure Procurement Study – Consolidated: F-TOU Filters Design Procurement Assessment Study Catania, 11 June 2014 TOU Meeting When Industrial Prime Contractor? Our proposal: • During Phase B1, industry will deliver consult and services. • We’ll work to have ASI delivers a ITT for Phase B2/C contract, not later than March 2015. • Goal: – TOU Prime Contractor at work at beginning of Phase B2, but clearly identified before the SRR. Catania, 11 June 2014 TOU Meeting