PLATO : TOU PROGRESS MEETING 14-15/12/2010 S. Mellé (CNES, PLATO Instrument PA Manager) Outline 1- PLATO and TOU PA organization 2- CNES PA organization 3- PLATO PA specification 4- PA documentation to be produced 5- Remarks on the first proposed materials PLATO PA organization (1/2) PLATO Project Manager PLATO PA manager: ??? PLATO Project Team PLATO Payload Manager PLATO Instruments Manager PLATO instrument PA manager S. Mellé Instrument System coordinator P. Levacher P. Bodin RAIV R. Pérez CAMERAS/System team Manager P. Levacher (LAM) Thermal support CAMERAS D. Laubier Telescope Optical Unit R. Ragazzoni Proto Camera AIT F. Madec TOU Optical tests ??? PLATO : TOU progress meeting, 14-15/12/2010 Giacinto De Paris Management Thermal Optics OMT straylight Structure F-TOU W. Benz Filters PA manager: TOU PA manager: TOU structure PA manager: ??? N-TOU R. Ragazzoni AIV AIV GSE GSE Filters 2 PLATO PA organization (2/2) PLATO PA manager: ??? In charge of: - Satellite PA management PLATO instrument PA manager S. Mellé In charge of: - Instrument PA management - Interface/reporting with/to the ESA PLATO PA manager - Following of the respect of ESA PA specification at equipment level In charge of: - TOU PA management - Interface/reporting with/to S. Mellé - Following of the respect of ESA PA specification at subcontractors level TOU PA manager: Giacinto De Paris TOU Structure In charge of: - Filters PA management - Interface/reporting with/to TOU PA manager Filters PA manager: ??? PLATO : TOU progress meeting, 14-15/12/2010 Filters TOU structure PA manager: ??? In charge of: - Structure PA management - Interface/reporting with/to TOU PA manager 3 PA organization in CNES Patrick Saunier Gilles Dorléac Project Quality Jean-Paul Etienne Configuration and documentation Roland Laulheret Dependability Philippe Lay EEE Parts and Qualification Jean-Louis Venturin Environnement and new parts Christian Durin Technologies Materials and Processes Jean-Louis Pédron Ground and operations QA Software Francis Pressecq Laboratories and Expertises PLATO instrument QA Experts Samuel Mellé PA manager Roland Catala Integration QA Eric Verlet Documentation Gilles Codou Myriam Cournet Dependability EEE parts Configuration Guy Rolland Radiations Hélène Combes Materials and Grégory Navarro Sofware Delphine Faye (contamination) + ….. Expertises Processes QA Experts can provide a support in methodology (how to perform dependability analyses, MCP lists, radiaton analysis, etc…) and will analyse the provided documents EEE and materials qualification (DPA, outgassing characterization, radiation tests, etc… ) can be performed at the CNES laboratory PLATO : TOU progress meeting, 14-15/12/2010 4 Product Assurance Specification PA specification not yet provided by ESA CNES PA plan (under approval circuit) is applicable to cooperatings labs CNES PA specification based on ECSS tailoring to be written PA Plan: PA Management: - Risks management - Configuration and documentation management - Discrepancies management - Alerts management - Integration QA -… QA expertise : - Safety, Dependability, EEE parts, Radiations, Materials and Processes, Software, Contamination PLATO : TOU progress meeting, 14-15/12/2010 5 Documentation to be produced (1/2) Product assurance management PA spec compliance matrix Initialized: Provided in draft version: Provided in final version: Beginning of phase A End of phase A End of phase B (PDR) Product Assurance Plan Beginning of phase A End of phase A End of phase B (PDR) Materials and Processes Initialized: Provided in draft version: Provided in final version: DML Beginning of phase B End of phase B End of phase C (CDR) Risks management plan Beginning of phase A Risks portfolio Throughout the project End of phase B (PDR) Applicable to all equipement DPL Beginning of phase B End of phase B End of phase C (CDR) Critical Item Doc/Conf List Management Plan Throughout the project Throughout the project DMPL Beginning of phase B End of phase B End of phase C (CDR) Contamination Initialized: Provided in draft version: Provided in final version: Contamination Plan Beginning of phase B End of phase B (PDR) End of phase C (CDR) Radiations Initialized: Provided in draft version: Provided in final version: Radiations Analysis Beginning of phase B End of phase B End of phase C (CDR) Sector Analysis Beginning of phase B End of phase B End of phase C (CDR) PLATO : TOU progress meeting, 14-15/12/2010 6 Documentation to be produced (2/2) Dependability Initialized: Provided in draft version: Provided in final version: FMECA Beginning of phase B Mid of phase B End of phase C (CDR) Antenna Initialized: Provided in draft version: Antenna Pre-amplifier Provided in final version: MEB SCM SCM Pre-amplifier Point Failure No Single for mechanical Beginning of phase B Yes if electronic Mid Yes of phase B End Yes of phase C (CDR) Yes Yes EEE parts PSA Beginning of phase B Mid of phase B End of phase C (CDR) Safety Yes if EEE Beginning ofparts phase B Mid Yes of phase B End Yes of phase C (CDR) Yes if EEE parts Yes Radiations Analysis Sector Analysis Beginning of phase B Beginning of phase B End of phase B End of phase B End of phase C (CDR) End of phase C (CDR) Documents applicability Yes if EEE parts Yes if EEE parts Antenna Date code list Yes if EEE parts Part Approval Document Initialized:Pre-amplifier Beginning of EEE parts supplying Beginning of EEE parts supplying Antenna Yes Yes Yes Provided in draft version: Beginning of EEE parts supplying Beginning of EEE parts supplying MEB Yes Yes Yes Provided in final version: Before TRR Before TRR SCM Yes if EEE parts Yes if EEE parts Yes if EEE parts Documents applicability SCM Pre-amplifier Yes Yes Yes Yes if EEE parts Yes if EEE parts Antenna Antenna Pre-amplifier Yes Yes MEB Yes Yes HSIA SDP SCM Yes if EEE SPAP parts Yes if EEE parts Initialized: Beginning of phase B Beginning of phase B Beginning of phase B SCM Pre-amplifier Yes Yes Provided in draft version: Mid of phase B Mid of phase B Mid of phase B Provided in final version: End of phase B (PDR) End of phase C (CDR) End of phase B (PDR) Documents applicability No No No Antenna Antenna Pre-amplifier No No No PLATO : TOU progress meeting, 14-15/12/2010 MEB Yes Yes Yes Initialized: Provided in draft version: Provided in final version: DCL Beginning of phase B End of phase B End of phase C (CDR) WCA Beginning of phase B Mid of phase B End of phase C (CDR) Documents applicability Reliability Analysis No for mechanical Beginning of phase B Yes if electronic Mid Yes of phase B End Yes of phase C (CDR) Yes Yes NA for TOU Software 7 Remarks on the first proposed materials Albemet: Ok but not from Brush Wellman because of ITAR licence Al 7075: Ok but do not use OAN because of holding issue and prefer the use of T7351 thermal treatment instead of T6 (see ECSS recommandation). Al 6061: Ok (thermal treatment T6 ok) Ti6Al4V-STA: Ok but not from Western Titanium because of ESA alert file (ESA-EA-2009-Mat4). Dispal: Materials QA experts don’t know this material => provide the datasheet and the flight heritage PLATO : TOU progress meeting, 14-15/12/2010 8