PLATO PLATO TOU KO MEETING H. Rauer (DLR PF) H. Kinter/A. Salado (Kayser-Threde) Activities • Mission selection in Feb. 2014 • Payload industrial management is being assigned for “bridging period” and B1 Phase to Kayser-Threde • Status of payload teams, PDC, PSPM is reviewed • „Kick-off“ Phase B1: July 16/17 2 PLATO Camera Management Support Overview Image Copyright: Mark A. Garlick. Science Credit: Carole Haswell & Andrew Norton (The Open University) Agenda • KT Team Organization and responsibilities • Main Phase B1 Preparation Activities • B1 Schedule Overview: • KT Questions to TOU team PLATO Payload Management Key Personnel Name Function Richard Haarmann PIPM Bernd Schulz PA/QA Manager Alejandro Salado Payload Sys. Engineering (PTC) Hilda Kinter Camera Project Manager (CPM) PIPM Deputy Valery Mogulsky Camera Systems Engineering Roberto Montedori Payload AIV Manager (PAM) Gisbert Peter DPS Project Manager (DLR) Main Phase B1 Preparation Activities Phase B1 Planning • Detail roadmap until KO Phase B1 and beyond Synchronization of all partner activities • Major Milestones for the Phase B1 Date Event 15.-16. July 2014 Phase B1 Kick-Off March 2015 PLATO Design Consolidation Review (PDCR) October 2015 PLATO B1 data package delivery for SRR November - December 2015 PLATO System Requirements Review (SRR) March 2016 Mission Adoption & IPC approval April 2016 Kick-off Phase B2/C/D January 2024 PLATO Launch Main Phase B1 Preparation Activities Preparation B1 Kick-Off Data Package Establish an updated Specification Tree to define the interrelation between the single PLATO P/L component specifications Basis for the traceability of single requirements and interface management Definition of all required documents for the B1 Kick-Off Comparison with existing documentation to identify necessary inputs Completion / annotation of existing specifications Utilization as applicable documents for the B1 work upon PDCR Phase B1 • 1st P/L Meeting has been on 06./07.05.2014 – Bring P/L consortium together – Start to resume P/L teams • Phase B1 KO is scheduled for 16./17.07.2014 – Official Start of Phase B1 – All work packages are already defined – Tasks to be done between KO and 2nd P/L Consortium Meeting will be defined • 2nd P/L Meeting proposed Fall 2014 – All specifications and belonging annotations/supplements are available as basis for the B1 development work PLATO Phase B1 Schedule Overview of major Phase B1 Deliverables Meeting Date Deliverables KO 16.07.14 * Drafts of TOU Requirements Specification, Camera Development & Verification Plan, List of Deliverables, 2nd P/L Meeting 15.09.14 * First issue of above documents PM1 18.11.14 Progress report + specified deliverables PM2 20.01.15 Progress report + specified deliverables PDCR delivery 02.03.15 Progress report + specified deliverables PM3 12.05.15 Progress report + specified deliverables PM4 21.07.15 Progress report + specified deliverables PM5 22.09.15 Progress report + specified deliverables SRR delivery 02.11.15 Camera Reports, models, Camera URDs and I/F documents * drafts to be prepared by KT Specified deliverables defined in the List of Deliverables, which may include Camera Reports (design, budgets, performance, straylight, thermal, structural, risk assessment), MAIV plan, Management Plan, mathematical models Communication between TOU team and KT List of all deliverables to be defined and finalised by 2nd P/L Meeting PMs to be held at TOU site or by Webex. Required documents and Progress Reports including status of AIs to be delivered at least five working days before the meeting Regular bi-weekly telecons between TOU lead team and KT: brief discussion of working progress, identified problems, needed inputs etc the traceability of single requirements and interface management Meeting when necessary with other Camera/Payload/PLATO teams by Webex (organised by KT). For critical topics, like I/F discussions, face to face meeting are preferable Payload Camera Subsystem Status Summary: Goals Phase B1 • Goals Phase B1: To achieve a sufficient level of technical maturity to ensure a successful SRR. • • • system requirements for the selected architectures successfully validated • • • system requirements derived confidence on the readiness levels of various technologies. • • • consolidating the requirements on system and subsystem level and their traceability consolidating internal interfaces, assessing requirements for external interfaces consolidating performance models consolidating and defining operational modes of the payload and its various subsystems and components. validating the set of system and subsystem requirements Establish a verification strategy consistent with programmatic limitations and required scientific value. Develop technology maturation programs in order to achieve the required TRL levels at SRR Telescope Optical Unit (TOU) Status Summary: • Team? Several Institutions (INAF, Univ. Bern, Stockolm Obs., Univ. Firenze) + Industrial Partners (Selex , Medialario-Sagem, Seso, RUAG, APCO Technologies) led by INAF (Interface to Camera team) • Current Status? – Optical Design + options available – Breadboard/Prototypes: TOU AIV procedure already performed (TOU Optical and Thermal Performance) – Further Breadboard with AIV and thermal behavior identified AIV procedures under development with serial production in mind • Next Steps? – Answer MEMO questions Issues/questions to the TOU Team Image Copyright: Mark A. Garlick. Science Credit: Carole Haswell & Andrew Norton (The Open University) Main Phase B1 Preparation Activities Questions to/inputs from TOU team: – List of TOU team including percentage allocation for PLATO – Is there a Central point for Camera document collection? – List of available technical documents: – List of MEMO Questions • Component I/Fs • Operational modes, states, and transitions • Performance models or simulators • Behavioural models or simulators • Performance wrt requirements • Model philosophy • Assumptions employed in analyses • Requirement specification • Open issues and decisions • Current risks and their mitigation strategies