Valmet Mill Maintenance Outsourcing – Best Maintenance Practices in Pulp and Paper Mill to Improve Profitability Vijay Rathi Today’s challenges in Paper Making Rising raw material and energy costs 2 Global industrial competition Challenging global economic conditions Increasing environmental and safety requirements Skills shortages Paper mill operational cost distribution Variable costs dominate 0.0% 1.4% 4.3% 2.7% 0.8% 0.0% 0.0% Cost breakdown 9.9% Commission 0.0% Transportation 0.0% Variable costs 43.2 % Pulps 43.2% Chemicals 11.6% Energy 26.0% Water 9.9% Other variable costs 0.8% Fixed costs 26.0% Personnel 4.3% Maintenance mat. 2.7% Overhead 1.4% Other fixed costs 0.0% Total costs 11.6% © Valmet 100.0% 4 Four steps to Maintenance management For lower maintenance costs Maintenance costs Corrective maintenance Preventive maintenance Downtime & quality costs Predictive maintenance Unplanned repair costs Planned maintenance costs Maintenance effectiveness Performance management Maintenance efficiency Performance management compared to traditional concept Maintenance Hours / ton 0.6 Traditional maintenance concept • Higher costs 0.5 • More corrective maintenance • Lower technical availability 0.4 0.3 0.2 0.1 Valmet Mill Service performance management concept • Long-term cost optimization • Fewer failures and repairs • Highest efficiency and quality Years 5 3 July, 2014 © Valmet | Author / Title Valmet agreement services that help you to improve productivity Availability Efficiency Risk control Maximize availability while optimizing costs Optimize operations to reach set targets Control risks that would have an adverse effect on a plant and/or business • • • • • • • • • • • Intelligent maintenance Operational excellence Warehouse inventory Production Raw materials Energy Resources Asset value Safety Environment Competence Maintenance agreement − A systematic way to improve efficiency • Agreement is a systematic approach to reach the set targets • Cooperation starts with a thorough auditing phase, during which the development potential is studied and a development plan is prepared 7 Operational excellence through Agreement Management Energy opportunities Energy efficiency solutions to help minimize energy consumption Working environment opportunities Solutions for a safe and healthy workplace and improved usability to help increase productivity 8 Mill Improvements Water opportunities Water management solutions for decreased fresh water consumption and increased reuse of process waters with less effluent and lower costs Material opportunities Emissions opportunities Technologies to reduce the use of fiber and chemicals, minimize waste and lengthen the lifetime of machinery Solutions to help comply with legislation and achieve sustainability targets All these provide solutions to improve customer profitability Mill maintenance outsourcing - Cooperation concept Customer • No in-house maintenance personnel • Production personnel perform contractually agreed preventive maintenance tasks • Low and sustainable maintenance cost level • Focus on process upkeep and efficiency One contract Common targets Valmet Mill Service 9 Full maintenance responsibility • Preventive maintenance • Daily maintenance and shutdowns • Spare parts management Development focus • Personnel skills and working methods • Preventive maintenance and equipment lifecycle • Effective use of information systems (CMMS) Valmet • Roll maintenance • Specialist knowledge and services • Process development support Other suppliers • Supplier network management • Cost-effective long-term cooperation 3 July, 2014 © Valmet | Author / Title Results through a unique combination of knowhow Valmet’s combination of machinery, automation, process and maintenance know-how results in: Flexibility and experience to offer customized service 10 3 July, 2014 © Valmet | Author / Title The right maintenance decisions to optimize maintenance costs Highest efficiency of operations based on process knowhow Maintenance and production efficiently integrated Typical way Engineering Material mgmnt Purchasing Cleaning facilities Maintenance Production Logistics Purchasing Valmet way Cleaning facilities 11 3 July, 2014 Engineering Material mgmnt Purchasing © Valmet | Author / Title Maintenance Operate and maintain team Production Logistics Purchasing Full maintenance concept - Clear process creates results Maintenance audit Takeover and Change program Target operations Separate business operations 12 3 July, 2014 © Valmet | Author / Title Professional maintenance audit - Content supports the future actions We need to analyze – Maintenance practices – Production efficiency – Maintenance costs We will propose – Realistic targets – Action plan 13 3 July, 2014 © Valmet | Author / Title Practical Cases Approach Developing existing maintenance operations Phase II Tailor made scope and co-operation model 6-12 m Phase I Audit & analyze 1m Phase III Implementation 12 m Define savings & improvement Potential Scope of co-operation Agreement New way to operate Stabilizing operations Maintenance Audit Proposal Kick-off Implementation Continuous improvement Pre study Content and scope Audit Targets Teams establishment Analyses of data KPI’s Project manager Benchmarking Safety Action plan Summary of conclusions Maintenance strategy Communication to organizations Recommendations Maintenance resources Change program Presentation to mill management Trade union issues Maintenance management development (CMMS) Competence analyzes Training Motivation program 3 July, 2014 © Valmet | Author / Title Evaluation of new way of operations Process development Quality support Safety development New working methods Network development Efficiency measurement Analysis of results New annual targets RCM based analysis Partnership OEE development program 14 Phase IV Development Step by step execution plan Optimize Improve Maintain • Technology updates for improved efficiency • • • Predictable costs Best Practices • Guaranteed results with minimum life cycle cost • Valmet know how at the mill • • Risk sharing Technology updates for improved efficiency • • • Predictable costs Best Practices • Keep the existing machinery up and running • Valmet maintenance procedures • Valmet maintenance procedures • Valmet maintenance procedures • Follow-up and monitoring • Follow-up and monitoring • Follow-up and monitoring Availability Mill Improvements Keep the existing machinery up and running Efficiency Keep the existing machinery up and running Performance Paper machine profitability potential Values from an implemented project ( EXP.150 KT/Y) More production by EUR 2.1 million Savings per year EUR 1.2 million in total Mill Improvements 360°Rolls Agreement How Valmet see the rolls enviorment in a Mill Roll environment Doctoring Uhle boxes Shoe press belts Showers Press felts 17 On-site analyses and measurements Roll maintenance Spare parts Roll covers Dryer and forming fabrics New rolls Process conditions Logistics Valmet Mill Service Amcor Packaging Pty Ltd, Botany, Australia Greenfield 345 kton/year containerboard mill Agreement started on July 12, 2011 Multi-year agreement including maintenance establishment, mill maintenance and management of improvement 18 Areas of responsibility – Mechanical, electrical and automation maintenance – Roll maintenance – Management of civil works – Planning, management and implementation of improvement projects 19 Performance agreement Results through cooperation Case Mondi Swiecie PM 7, Poland Agreement period started: 2011 Agreement period: Active Targets – Improve time efficiency – Reduce specific energy consumption Results – Time effiiciency has improved by about 7.5% since the agreement started – Energy consumption has decreased by about 1% during 2012 Machine data • Liner/Fluting PM 7 • Production capacity 470,000 t/year • Grammage 75 – 145 g/m² • Design speed 1,800 m/min • Wire width 8,600 mm 20 Performance agreement Results through cooperation Case Sappi Kangas, Finland Agreement period: 2002-2010 Scope – Project management – Steering group – Working groups for focused development areas M-real image bank – Common database – Remote services for specific areas Machine data – Special maintenance packages • Coated fine paper, PM 4 • Production capacity 210,000 t/year • Grammage 65 – 90 g/m² • Design speed 1,300 m/min • Wire width 6,300 mm – Maintenance development and support Results – Percentage of unplanned shutdowns due to maintenance reasons dropped continuously from 2.4% to 0.5% in 2004 – The customer reduced the maintenance personnel by 50% during the agreement period Focus on Machine Performance and Productivity Key results from co-operation with Valmet Nordic Paper Greåker and Säffle “Maintenance costs lowered in Greåker 20% and in Säffle 25%.” Nordic Paper Greåker & Säffle “The mill’s daily production increased in Greåker 30% and in Säffle 25%.” “Energy usage lowered with 40% in Greåker and 20% in Säffle.” Öysten Vedahl Mill Manager for Nordic Paper Greåker ( 2001 – 2010) Säffle (2005 – 2010) 21 3 July, 2014 © Valmet | Author / Title Case Results and Discussion UPM, Plattling, Germany • MMS set up activities on schedule and recruited a very competent maintenance team.” - Caius Murtola, General Manager - • ”We could not have set up the maintenance better ourselves.” - Mika Kämpe, Operations Manager - • “Maintenance is a service function for the first time and not the main topic in the operations. I can concentrate on paper making.” - Olli Ylä-Jarkko, Production Manager PM 1 - 22 3 July, 2014 © Valmet | Author / Title Summary Key performance indicators Complete maintenance operations Sourcing Task force programs 23 3 July, 2014 Skilled personnel © Valmet | Author / Title Preventive maintenance and shutdowns Standard operating procedures Operator maintenance Maintenance systems Benchmarking (Example 150KT/Y WFU) 25 3 July, 2014 © Valmet | Author / Title Benchmarking (Example 150KT/Y WFU) 26 3 July, 2014 © Valmet | Author / Title Benchmarking (Example 150KT/Y WFU) 27 3 July, 2014 © Valmet | Author / Title