2011

Exhibition of School Planning and Architecture

Indio High School

Indio, CA

Design Concept Award

Projects in the Design Phase

Ruhnau Ruhnau Clarke

Indio High School

Desert Sands Unified School District

Ruhnau Ruhnau Clarke

Architects Planners

Site Plan

New Campus Entrance

Community Environment: The new campus matches community pride developed over the school's 50+ year history. Past students characterize their experience as one in which faculty and staff truly care about their students and providing a quality education. Now, with this new facility, dynamic classroom environments combined with resource centers for student services and activities are better equipped to aid teachers in developing a rich educational experience.

Campus Courtyard

Community Environment: With an existing Teen Center across the street and future city library planned for joint use adjacent to the site, this configuration integrates and showcases the new school, promoting community use aspects and lifelong learning values important to the District. The large, centrally located quad promotes school integration while other, smaller courtyards and dispersed food service areas allow for

'identity" spaces for the diverse student groups. These areas, in addition to providing a place for social congregation serve a more functional purpose as well- allowing for better supervision with students gathered in one general area and alleviating congestion during lunch hour by providing multiple food service options.

Secondary food service

Campus Courtyard

Learning Environment: The 91 teaching spaces and classrooms are organized around departments to form learning centers adjacent to related departments and functions to promote integrated learning and sharing of ideas. These are then supported by faculty centers for collaboration and team building. The learning centers are arranged around a large quad and the smaller courtyards that feed into it to facilitate student access to services and activities housed there.

Hands on Learning

Learning Environment: The new design incorporates flexible spaces suitable for a variety of subject matters. In addition to standard core curriculum classrooms, the various classroom buildings feature science laboratories, lecture halls, various art studio spaces, spaces for agriculture and woodshop programs, a greenhouse, and fully equipped video production and broadcast studio for a more hands- on experience.

Agriculture Yard

Technology and Agriculture Building

Physical Environment The new high school is planned to be over 300,000 square feet, built in multiple phases to replace the aging, outdated facilities that would have been costly and problematic to modernize. The site is anchored on each on each corner by the

Performing Arts, Administration, Gymnasium, and Agricultural building. This allows each building required access to parking or field spaces and can be accessed by the public for events outside of normal school hours.

Performing Arts Center

Physical Environment - Indio High School's new look will be anchored by a performing arts center with theater seating for over 400 people, whose glass lobby engages the community with natural North facing soft light during the day, and a glow at night. The design makes use of materials that reflect the surrounding desert environment and display school pride through integrated signage and graphics. The primary spaces of performing arts, gymnasium, library and food service all have immediate access for the community while providing security for students.

A Collaborative Design

Planning Process: Indio High School has been designed in collaboration with the school district staff, the principal of the existing facility, and teachers at the site to enhance the established programs and culture of learning while providing the new facilities that will contribute the technology and flexibility for future success. Input from existing users was highly valued and is utilized on an ongoing basis. The design team also worked with the city of Indio in establishing a design that provides for joint use facilities to be used in conjunction with a city-run teen center located across the street from the existing campus and future joint use library.

Phasing

Planning Process: Part of the challenge is to plan for construction while 2,050 students are still on the site. Utilizing existing campus structures and temporary housing on adjacent city owned land, phasing will help the school to continue operating with minimal disruption during construction and allow the new school to keep its current street frontage on Avenue 46.

1 Existing Site

2

Phase 1

Temporary School Buildings In Place

3

Phase 1A 1B

Performing Arts, Science Building,

Administration, Gymnasium, Parking

4

Phase 2A, 2B

Art Building, Technology Building,

Agriculture/ Woodshop Building,

Library, Main Quad

5

Phase 3

Play Fields, Aquatic Center, Parking

6 Completed Site

1

3

5

2

4

6

First Floor Plan

Second Floor Plan

Project Data

Submitting Firm :

Project Role

Project Contact

Title

Address

City, State or Province, Country

Phone

Joint Partner Firm:

Project Role

Project Contact

Title

Address

City, State or Province, Country

Phone

Other Firm:

Project Role

Project Contact

Title

Address

City, State or Province, Country

Phone

Construction Firm:

Project Role

Project Contact

Title

Address

City, State or Province, Country

Phone

Architect

Roger Clarke

President

3775 Tenth Street

Riverside, CA 92501

951.684.4664

Ledesma Meyer Construction

Joe Ledesma

Principal

Palmae Business Center, 9441 Haven Ave

Rancho Cucamonga, CA

909.476.0590

Project Data

Project Name

City

State

District Name

Supt/ President

Occupancy Date

Grades Housed

Capacity

Site Size (Acres)

Gross Area (sq. ft)

Per Occupant (pupil)

Gross/ net please indicate

Design Build?

If yes, Total Cost

Includes

If no,

Site Development

Building Construction

Fixed Equipment

Other

Total

Indio High School

Indio

CA

Desert Sands Unified School District

Dr. Sharon McGehee

Est. September 2012

9-12

2300

43.23

344,977 SF

150 SF/ pupil

No

Est. 19,000,000

Est. 61,000,000

Est. 2,700,000

82,700,000

Exterior Elevations

New Classroom Building

Building 500: Art Studios,

Photography Labs, Broadcast

Studio

New Performing Arts Lobby

Existing Performing

Arts Lobby

Existing School Site

Administration Building

Existing Lunch Area, Interior Courtyard

Lunch Sheleter