1 1 2 SCHMGT BOYS GIRLS TOTAL PERCENTAGE GOVT 42905 47709 90614 35.71 AIDED 12443 20334 32777 12.92 2357 2169 4526 1.78 GOVT. SECTOR 57705 70212 127917 50.40 PVT. SECTOR 71139 54723 125862 49.60 128844 124935 253779 CENTRAL ALL 50.40 49.60 60.00 50.00 40.00 30.00 GOVT. SECTOR PVT. SECTOR 3 MEDIUM BOYS TAMIL ENGLISH FRENCH MALAYALAM TELUGU ALL GIRLS 23813 102706 172 603 1550 128844 TOTAL 26575 95904 190 539 1727 124935 50388 198610 362 1142 3277 253779 ENR BY MEDIUM IN PERCENTAGE 19.86 78.26 0.14 0.45 1.29 MEDIUMWISE ENROLMENT 2013-14 78.26 80.00 60.00 40.00 19.86 20.00 0.14 0.45 1.29 0.00 TAMIL ENGLISH FRENCH 4 MALAYALAM TELUGU REGIONS PONDY KARAIKAL MAHE YANAM UT PERCENTAGE GOVT PVT. AIDED CENTRAL 285 105 18 24 432 25 7 1 33 3 2 2 1 8 59.59 4.55 1.10 GOVT. SECTOR 313 114 20 26 473 PVT. SECTOR 181 49 13 9 252 65.24 34.76 34.76 65.24 GOVT SECTOR PVT. SECTOR 5 TOTAL % 494 163 33 35 725 68.14 22.48 4.55 4.83 SCHMGT NO. OF SCHOOLS (IN %) ENROLMENT (IN %) GOVT 59.59 35.71 PVT. AIDED 4.55 12.92 CENTRAL 1.10 1.78 GOVT. SECTOR 65.24 50.40 PVT. SECTOR 34.76 49.60 65.24 70.00 50.40 60.00 50.00 34.76 40.00 30.00 GOVT. SECTOR PVT. SECTOR NO. OF SCHOOLS 6 ENROLMENT 49.60 REGION PONDY KARAIKAL MAHE YANAM UT PERCENTAGE GOVT 279 104 17 23 423 59.08 SOC. WEL AIDED 2 CENTRAL 25 7 1 33 4.61 2 0.28 GOVT. SECTOR 309 113 19 25 466 65.08 3 2 2 1 8 1.12 34.92 65.08 GOVT. SECTOR 7 PVT. SECTOR PVT. SECTOR 181 49 13 7 250 34.92 TOTAL 490 162 32 32 716 REGION PONDY GOVT SOC. WEL 34643 KARAIKAL 9993 MAHE 2800 YANAM 3760 16972 1885 GOVT. SECTOR 53556 5310 517 15820 11955 27775 510 3310 3997 7307 679 144 4583 2660 7243 174122 AIDED 56 CENTRAL PVT. SECTOR 78241 UT 51196 56 22961 3056 77269 96853 PERCENTAGE 29.40 0.03 13.19 1.76 44.38 55.62 44.38 55.62 GOVT. SECTOR 8 PVT. SECTOR TOTAL 131797 REGION TAMIL PONDY 17746 113859 192 TOTAL 131797 8344 19413 18 27775 6659 42 KARAIKAL ENGLISH MAHE YANAM UT 26090 5436 145367 PERCENTAGE 14.98 83.49 100.00 FRENCH MALAYALAM TELUGU 7307 606 252 606 1807 1807 0.14 0.35 1.04 83.49 80.00 60.00 40.00 20.00 14.98 0.14 0.35 FRENCH MALAYALAM 1.04 0.00 TAMIL ENGLISH 9 TELUGU 7243 174122 NO. OF SCHOOLS WITH ELEMENTARY SECTIONS (IN %) ELEMENTARY ENROLMENT (IN %) GOVT. SECTOR 65.08 44.38 PVT. SECTOR 34.92 55.62 DETAILS 65.08 55.62 70.00 44.38 60.00 34.92 50.00 40.00 30.00 20.00 10.00 0.00 GOVT. SECTOR NO. OF SCHOOLS PVT. SECTOR ELEMENTARY ENROLMENT 10 Rs. In Lakhs Year Budget Allotment Opening Balance Central Release State Release Total Receipt Expenditure Closing Incurred Balance Percentage 2002 - 03 340.60 0.00 133.30 0.00 133.30 1.94 131.36 1.46 2003 – 04 730.94 131.36 143.08 195.95 470.39 140.61 329.78 29.89 2004 – 05 1059.70 329.78 236.81 103.76 670.35 238.85 431.50 35.63 2005 – 06 1244.40 431.50 546.69 105.76 1083.95 543.04 540.91 50.10 2006 – 07 941.93 540.91 18.92 106.31 666.14 469.00 197.14 70.41 2007 – 08 893.50 197.14 587.68 147.72 932.54 629.23 303.31 67.47 2008 - 09 1313.68 303.31 646.95 281.50 1231.76 1122.71 109.05 91.15 2009 - 10 1246.36 109.05 682.07 541.19 1332.31 1060.08 272.23 79.57 2010 - 11 1509.10 272.23 489.51 547.34 1309.08 1165.49 143.59 89.03 2011 - 12 2005.68 143.59 785.10 398.23 1326.92 1216.14 110.78 91.65 2012 - 13 2035.20 110.78 928.99 238.76 1278.53 1232.44 46.09 96.40 2013 - 14 806.35 46.09 299.02 232.96 578.07 473.36 104.71 81.89 5498.12 2899.48 8397.60 8292.89 Total 14127.44 11 11 12 12 Rs. In Lakhs S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Major Area of Intervention Special Training for Out of School Children Free Text Book - Braille books Teachers Salary Teachers Training Block Resource Centre Cluster Resource Centres School Grant Research & Evaluation Maintenance Grant Intervention for CWSN SMC Training Furniture for Govt. UPS Management & MIS Learning Enhancement Prog. Community Mobilization activities State Component TOTAL 13 Target Achievement Physical Financial Physical Financial 341 3.41 150 2.10 87 0.18 87 0.18 17 64.08 17 23.00 4277 30.17 4277 30.17 75 210.34 55 65.13 102 160.07 83 40.31 575 32.85 575 32.85 575 8.63 575 8.63 512 34.35 512 34.35 2180 59.95 1937 53.27 3408 6.82 3408 6.82 8000 40.00 8000 40.00 4 90.00 4 71.05 4 31.76 4 31.76 4 8.75 4 8.75 1 25.00 1 25.00 20162 806.35 19689 473.37 13 14 Rs. in Lakhs S.No. Proposed Phy. Fin. Activity I ACCESS 1 Special Training for mainstreaming of out of school children 1.01 Non-Residential (Fresh) 6 months II ENHANCING QUALITY 2 Teachers Salary Approved Phy. Fin. Sub Total 303 303 9.09 9.09 303 303 9.09 9.09 Sub Total 6 6 12 21.60 25.20 46.80 6 6 12 21.60 25.20 46.80 2945 58.90 2281 13.69 2945 29.45 2281 11.41 32 1.92 0 0.00 283 5.66 150 0.00 74 1.48 100 1.00 6279 97.41 4812 26.09 2.01 Primary Teachers ( Regular)-Existing, in position 2.02 Additional Teachers - UPS (Regular) in position 3 Training Refresher In-service Teachers' Training at BRC level and 3.01 above - 10 days [ 6 DAYS] One day monthly cluster level meetings for 10 months for all 3.02 teachers at CRC level -10 days [ 5 DAYS] 3.03 Induction Training for Newly Recruited Teachers- 30 days Refresher residential in-service for 10 days at BRC level and above Refresher Residential Training for all Resource Persons, 3.05 Master Trainers, BRC & CRC faculty and Coordinators for 10 days [ 10 DAYS] Sub Total 3.04 15 Rs. in Lakhs S.No. Proposed Activity Phy. Fin. Approved Phy. Fin. Academic Support through Block Resource Centre/ URC 4 4.01 Salary of Faculty and Staff 4.02 6 RPs at BRC for subject specific training, in position 40 168.00 31 130.20 4.03 2 RPs for CWSN in position 4.04 1 MIS Coordinator in position 0 0.00 12 21.60 5 7.20 4 5.76 4.05 1 Data Entry Operator in position 1 Accountant-cum-support staff for every 50 schools in 4.06 position 6 8.64 6 8.64 12 14.40 8 9.60 6 3.00 6 3.00 6 1.80 6 1.80 75 203.04 73 180.60 34 142.80 16 67.20 34 3.40 32 3.20 34 4.08 32 3.84 102 150.28 80 16 74.24 4.07 Contingency Grant 4.08 Meeting TA Sub Total 5 Academic Support through Cluster Resource Centres 5.01 Salary of Cluster Coordinator, full time and in position 5.02 Contingency Grant 5.03 Meeting TA Sub Total Rs. in Lakhs S.No. Activity 6 Computer Aided Education in UPS under Innovation 6.01 Computer Aided Education in upper primary schools Sub Total III ANNUAL GRANTS 7 School Grant 7.01 Primary 7.02 Upper Primary Sub Total 8 Research, Evaluation, Monitoring & Supervision 8.01 REMS activities Sub Total 9 Maintenance Grant 9.01 Maintenance Grant ( PS & UPS) Sub Total IV BRIDGING GENDER AND SOCIAL CATEGORY GAPS 10 Interventions for CWSN 10.01 Provision for Inclusive Education Sub Total 11 Innovation Head up to Rs. 50 lakh per district 11.01 Girls Education 11.02 Intervention for SC / ST children 11.03 Intervention for Minority Community children Sub Total Proposed Phy. Fin. Approved Phy. Fin. 4 4 200.00 200.00 1163 1163 15.12 15.12 370 205 575 18.50 14.35 32.85 370 205 575 18.50 14.35 32.85 575 575 8.63 8.63 575 575 8.59 8.59 512 512 38.40 38.40 512 512 38.40 38.40 1921 1921 57.63 57.63 1868 1868 50.44 50.44 4 3 3 10 48.78 28.42 8.20 85.40 4 3 3 10 21.50 9.80 1.95 33.25 17 Rs. in Lakhs S.No. Proposed Phy. Fin. Activity 12 SMC/PRI Training 12.01 Non-residential (3 days) Sub Total V 13 13.01 13.02 13.03 13.04 13.05 SCHOOL INFRASTRUCTURE Civil Works Construction Additional Class Room (Rural) Drinking Water Facility (for urban area only) Boundary Wall Office-cum-store-cum-Head Teacher's room (Upper Primary) Furniture for Govt. UPS (per child) Sub Total VI PROJECT MANAGEMENT COST 14 Management 14.01 Management up to 3.5% Project Management and MIS Sub Total Learning Enhancement Prog. (LEP) (up to 2%)only for large 14.02 scale integrated programmes for quality development 14.03 Community Mobilization activities (up to 0.5%) Sub Total Total of SSA (District) VII STATE COMPONENT 15 Management & MIS Sub Total STATE SSA TOTAL Approved Phy. Fin. 3384 3384 10.15 10.15 2538 2538 7.61 7.61 4 25 1000 2 4000 5031 33.71 6.25 33.58 16.85 20.00 110.39 4 0 0 0 4000 4004 33.71 0.00 0.00 0.00 20.00 53.71 4 4 100.00 100.00 4 4 94.50 94.50 0 4 4 18791 0.00 6.40 6.40 1156.47 0 4 4 16533 0.00 3.04 3.04 674.33 1 1 18792 30.00 30.00 1186.47 1 1 16534 62.46 62.46 18 736.79 Civil Works - Issues: • Out of 10 New Primary Schools, 6 schools were opened in 2008-09 and rest 4 schools could not be opened because of less enrolment and escalated land cost. • In the appraisal report for 2013-14, Access Unit has commented as follows: “10 new PS were sanctioned in 2007-08, out of 10 PS, 6 were opened and the rest of 4 PS may be surrendered in the PAB (2013-14) because of saturation of access in the neighborhood as per UT norms” • Surrender of 4 above schools (2 each in Pondicherry and Karaikal district) has not been reflected in PAB minutes of 2013-14. • Now UT requests to consider the surrender of 5 Primary School Buildings at a total cost of Rs.40.00 Lakhs including the above said 4 Primary Schools. The fifth primary school is functioning already in the government building and it is not required to construct new building since the existing situation does not demand. • Out of 430 Govt. Schools only 22 schools are not having compound wall. To avoid intruders and anti social elements the proposal for the boundary wall may be considered. 19 20 20