NC-SIS PowerSchool EOY Expectations Terra Dominguez May 5, 2014 Audience • LEA / Charter NC-SIS PowerSchool coordinators • Tech Directors Purpose • Describe End of Year (EOY) • Define LEA, DPI and Pearson responsibilities • Discuss resources and support • Identify next steps • Answer questions What is End of Year (EOY)? • Function similar to NC WISE that promotes students to the next year school and next year grade at the end of a school year • Run at each LEA for all schools • Shut-down window similar to NC WISE YET – All PowerSchool instances will be shut-down prior to running EOY in late June and remain unavailable through first week in July More About EOY • Three processes that occur at the LEA level – Validation: most reports and clean up can be executed by school staff – EOY: performed on all schools in the LEA at the same time – Post-EOY: most tasks may be completed by school staff • Current year (SY 13/14) data must be corrected prior to EOY – EOY will not complete if validation fails • If using PowerScheduler, SY 14/15 schedules must be committed prior to EOY (HS, MS) • EOY must be run during shut-down window Who Does What? - Responsibility 1. LEA – Validate data 2. LEA – Communicate completion 3. DPI – Verify validation is complete for all LEAs 4. DPI / Pearson – Shut-down (Pearson back-up systems in place) 5. LEA or DPI – Run EOY (this part’s easy) during shut-down 6. DPI / Pearson – Re-connect and initiate PowerSchool Instances (ODS) 7. DPI – Complete year end processes for state’s integrated/dependent systems 8. DPI – Communicate systems up 9. LEA – Begin Post-EOY (SIS review, updates and local system integration) LEA - Validate • Begin now • Use PowerTools reports (School level, can run for SY 13/14) – Section Enrollment Audit – School Enrollment Audit Also located: Start > Reports (System) • Run validations on End-of-Year Process screen – LEA User: DO NOT RUN EOY process until DPI shut-down has been communicated • Correct at LEA and school level Read Everything First – End-of-year process Screen Path Validate Only • DPI will provide the appropriate entry and exit codes Lather, Rinse, Repeat • Begin validation and correction now • Continue to run validation and correct data until DPI shut-down window • EOY validation tools can be used all year long Validation Support • Weekly technical webinars https://www1.gotomeeting.com/register/340351513 • Home Base Support Center (HBSC) available to answer validation questions – Does your technical staff need more help? Log that too • Documentation on NC-SIS site http://www.nc-sis.org/EOY.html • Articles on PowerSource – Some articles only accessible to LEA Technical contact LEA - Communicate • Respond to DPI survey by Friday, May 9th • Provide contact in survey – EOY requires 24/7 LEA contact • Be prepared to run EOY by XXXX Integration and Dependency • Integrated systems* are dependent on the completion of EOY for all LEAs, however; no LEA may begin EOY function before DPI shut-down communication – ODS (Repository) – CFNC – CECAS – SchoolNet – Open Class – Test Nav – TNL – NCEES *Examples DPI – Verify Validation • Check-points will be established to assist LEAs/Charters • EOY will not be run until all LEAs/Charters have completed validations • LEAs/Charters are encouraged to run EOY – a.k.a. ‘Push the button’ LEA / DPI – Run EOY Wait…You want me to ‘Push the Button’? • EOY is run after DPI shut-down is communicated • LEA encouraged to run EOY – ‘Pushing the button’ starts with a drop-down and ends with Submit – In some cases, this may provide LEAs more time for data clean-up • If data is correct EOY function will run • If process does halt, DPI 24/7 resource available • Complete the survey by Friday, May 9th DPI - Shut-down Window • Back-ups taken by Pearson Hosting • 24/7 support for DPI from Pearson • 24/7 support for LEAs/Charters from DPI • More detail pending on when to ‘push the button’ – Large LEAs will begin EOY first Isn’t There More? • Yes but we are learning with you so we will update the EOY webpages • Tips and Tricks document specific to NC • Tuesday Tech webinars https://www1.gotomeeting.com/register/340351513 • DPI can establish meetings for technical staff for in-depth questions DPI – Connect, Complete, Communicate • Pearson to re-connect ODS • DPI / vendors complete end of year processes for integrated systems • Post-EOY validation tasks – Individual contact with LEAs/Charters as needed • Communicate completion to state LEA – Begin Post-EOY • Post EOY- tasks – System and data review – Integrate local systems if needed • First day of SY 14/15 is 6/27/2014 Next Steps 1. Review NC-SIS EOY pages for validation procedures and support documents http://www.nc-sis.org/EOY.html 2. Determine participation – will you ‘push the button’ 3. Begin validation 4. Respond to survey by Friday May 9, 2014 5. Register for weekly Tuesday state-wide Tech Webinars https://www1.gotomeeting.com/register/340351513 Burning Questions • EOY required activities – Optional, Recommended and Required tasks are defined in the support documents • Next grade, next school – Students transferring out – Charter Schools – Program Schools • Scheduling Thank you Home Base Support Center Available: Monday - Friday 7:30 AM to 5:00 PM Phone: 919-807-4357 Email: homebase.incidents@its.nc.gov (Please do not send an email to this address unless you are a designated school official authorized to submit service desk tickets to Home Base Support Center)