• Project Description: RRV "Muzbulak" is located in a
remote area Bahmal District. In the RRV is no gas supply
from the gas distribution network. For heating it is used
coal imported at considerable cost of its transportation
charges; casings, firewood. As a result of the combustion
of solid fuels in homes it is polluted the environment
with harmful emissions. We will see hours of frequent
interruptions of power supply especially in the autumn
and winter periods. In this regard, to provide the
necessary living conditions of inhabitants RRV; effective
operation of schools; rural health units; service
industries; development and operation of enterprises of
private enterprise, farmers it is needed modernization of
the electricity RRV "Muzbulak" using technologies and
means of wind and solar energy.
• The purpose of the project: Development, start-up in
action integrated wind-solar power complex on the basis
of wind electroinstallations (WEI) up to 30 kW with the
conversion of wind energy of the surface (20-40m) layers of
the atmosphere into electricity, solar photovoltaic plants of
new generation.
• Providing of sustainable electricity and heat supply of the
objects of the social sector: Rural medical points (RMP),
schools, small business sites, etc. in the ungasified remote
rural village (RRV) "Muzbulak."
• Providing effective health services to the population by
increasing the duration of the work of the therapeutic
medical devices, computer and other office equipment.
• Objectives of the project: Development of an integrated process
scheme of wind-solar power complex with a justification and
rational choice of type and rating capacity of power generating
sources, based on an instrumental study of wind conditions and
other climatic factors in the external environment in the area
"Muzbulak", study of electricity, heat consumption of different
objects in the RRV "Muzbulak".
• Numerical modeling of the energy characteristics of the wind
turbines, solar photovoltaic plants in the conditions of the
"Muzbulak."
• Development, coordination of technical and economic supporting
materials and design documentation for the creation of integrated
wind-solar power complex. Development of the system of
management, control and protection of the integrated wind-solar
power sector.
• The effectiveness of the project: Development of clean technology
of producing of electric and thermal energy using a combination of
wind and solar energy.
• Sustainable electricity and heat supply of objects of the social
sector in a remote rural ingasified village "Muzbulak", Bahmal
District, Jizzakh region, where there is a shortage of electricity, fuel
and heat.
• Improving the living conditions of the population, the promotion of
sustainable health care of RRV with a population of over 4,000
people; effective use of therapeutic medical equipment and the
expansion of medical services; effective use of computer tools in
rural medical point, school; creation of conditions for the
development of agriculture production and the formation of new
jobs in the RRV.
Cost of the project: 350.0 thousand dollars
The proposed plan of financing: Means on a grant basis in the amount of
350.0 thousand dollars
Project duration: 36 months after the start of the project financing.
The executors of the project:
- Institute of Energy and Automation, Academy of Sciences of the Republic of
Uzbekistan,
100000, Tashkent. Durmon Yuli, 29
Phone: (+998 71) 2620522; FAX (+998 71) 2620919;
E-mail Address: ipea2010@mail.ru
-LLC "Intelligekt - Dialog" ,
Tashkent region, Afrasiab, 2
Phone: (+998 71) 256-45-11, (998 98) 127-60-80;
E-mail Address: s.ganijon@mail.ru, intellekt-dialog@inbox.ru; www.intellektdialog.ru
Download