The first total drilling fluid in a single sack. Environmentally Friendly Whole in One Description Whole in One is a blend of polymers, fibers, and minerals for a complete high performance water-based drilling fluid system. Advantages The stability, speed and performance of an oilbased fluid system Overall well bore integrity by minimizing shale problems and hole enlargement Penetrates and seals micro fractures Minimizes mud losses Resistance to chemical contamination Advantages (continued) Provides lubricity and reduces metal to metal contact Excellent Hole Cleaning Can be re-used but there are no disposal problems (passed microtox EC50 Bioassay) LC50 Reduce health, safety and environmental harm to rig personnel Lower costs due to clean up, disposal and transportation of oil based cuttings Economics Significantly lower total cost per barrel Lower transportation cost No environmental clean-up cost Availability of fresh or seawater as base fluid No cuttings transportation cost Low maintenance cost Reduced inventory cost on location by 75% Mixing Procedure Whole in One can be mixed in any type of available water on location; i.e. fresh, saturated salt, drill or seawater Fill the pits with the desired volume of water Mix 7-10 ppb Whole in One through the mud hopper Agitate the pits for 30 minutes Add the weighting agent to the desired mud weight The fluid is now ready for displacement Mixing Procedure (continued) Prior to building the curve, NFSI recommends the following: Add 2% by volume NFS-Lube, to insure torque reduction Add 4-6 ppb NFS-Trol X to insure additional shale inhibition Daily Maintenance Keep the mud hydrated Maintain 7-10 ppb Whole in One Track dilution and volumes DESCRIPTION Whole In One TEST DATE TESTED BY 04/15/2013 Sam Khosh SAMPLE VOLUME 350 ml SAMPLE COMPOSITION PRODUCT UNITS Freshwater ml Whole In One g Rev Dust g Barite g premixed Bentonite Bentonite water 7 7 PPB PPB 7 PPB ml Saturated salt water 5% ml Seawater ml Shalecapsule ml PERIOD AGED TEMPERATURE DYNAMIC/STATIC RHEOLOGY: TEMP. 600 RPM 300 RPM 200 RPM 100 RPM 6 RPM 3 RPM GELS 10" GELS 10' APPARENT VISC. PLASTIC VISC. YIELD POINT Erosion Lubricity API FLUID LOSS HPHT Filtration at250 °F pH COMMENTS: 1 288 7.0 27.0 190.0 2 3 4 5 7.0 27.0 190.0 280.0 7.0 27.0 190.0 280.0 7.0 27.00 190.0 280.0 17.5 7.0 27.0 190.0 6 288 7.0 lbs/100ft2 lbs/100ft2 cP cP lbs/100ft2 % 5in 5 Min ml 2a 3a 4a 5a 7.0 27.0 190.0 280.0 7.0 27.0 190.0 280.0 7.0 27.00 190.0 280.0 17.5 7.0 27.0 190.0 288.0 6a 288 7.0 288.0 7.0 HOURS °F D/S °F 1a 288 7.0 27.0 190.0 7.0 16 250 D 16 250 D 16 250 S 16 250 D 16 250 D 16 150 D 120 62 43 34 23 6 5 6 7 120 79 54 44 32 9 8 9 12 120 79 54 44 32 9 8 9 12 120 60 39 32 21 7 6 6 12 120 55 36 28 19 7 5 7 9 120 23 15 11 8 6 4 6 7 120 38 24 17 11 5 4 5 6 120 53 32 25 16 7 5 7 9 120 54 33 28 19 6 5 6 8 120 51 33 25 17 6 5 6 14 120 22 13 9 7 6 4 6 8 120 22 14 11 9 5 3 5 6 20 22 25 29 25 29 21 18 19 17 8 7 14 10 21 11 21 12 18 15 9 4 0.09 3.5 7 9.2 0.1 3.8 0.09 4.1 0.011 4.3 0.01 3.9 8 6 5 0.09 4.1 8.8 9 8.5 9.2 9 9 9 9 1: Freshwater mud 12 lb with 27 PPB Rev Dust no Bentonite 2: Premixed Bentonite water 7PPB with 27 PPB Rev Dust Hot Roll @ 250 F° Dynamic aging 3: Premixed Bentonite water 7 PPB with 27 PPB Rev Dust Hot Roll 250 F˚ Static aging 4: Sturated salt water 5% by volume added 5:Seawater 6: 2% by volume Shalecapsule Shale Erosion Test of Whole in One Before Shale Exposure After Hot Roll and Drying Sample from Arkansas Date: 08/02/2013 Subject: Shale Erosion Test Mud % Erosion Pierre Shale % Erosion Eagle Ford Shale 7 PPB EXP-2020 7 PPB EXP-2020 with 2% by volume Shalecapsule 7 PPB EXP-2020 with 4 PPB asphalt 7.3 7.00 7.4 3.2 3.0 3.3 Shale Erosion Test Procedure: Grind shale sample and sieve through the No. 5 and No. 10 screens. Use the shale that is collected on the No. 10 screen. 20 grams of the shale sample will be used in the test mud. The test mud will then be hot rolled at 150°F for 16 hours and screened through the No. 10 screen; the solid retained on the No. 10 screen will be washed, dried, and weighed. The initial moisture content is taken into account when calculating the percentage of erosion. In this test the shale moisture content is = 5%. Tested by: Sam Khosh Date: 08/02/2013 Subject: 7 days Shale Erosion Test with Eagle Ford core shale sample: Mud %Shale Erosion core sample 7 PPB EXP-2020 In fresh water 7 PPB EXP-2020 in fresh water with 2% by volume Shalecapsule 7 PPB EXP-2020 in fresh water with 4 PPB asphalt 3.2 3.0 3.3 7 Days Shale Erosion Test Procedure: Grind shale sample and sieve through the No. 5 and No. 10 screens. Use the shale that is collected on the No. 10 screen. 20 grams of the shale sample will be used in the test mud. The test mud will be: 123456- Hot rolled at 150°F for 16 hours in rolling oven Turn the oven off after 16 hours and leave it off for 8 hours Turn the oven on after 8 hours Repeat step 1- 3 for 7 days Take the mud from the oven Screen the mud through the No. 10 screen, the solid retained on the No. 10 screen will be washed, dried and weighed. Tested by: Sam Khosh LC50 Results Packaging Whole in One is available in two sizes: 25 lb. paper sacks 2000 lb. super sacks Performance Profile Case History #1 - Terryville Field, Haynesville Lateral, Lincoln Parish, LA The surface hole was drilled to a depth of 1,872’ where the pits were mudded up with Whole in One. Anhydrite was drilled at 4,452’ with no problems. Picked up directional tools at 4,826’, drilled to 9,270’ and had to weight up to 10.8 ppg due to splintery shale. Drilled to 11,273’ with Whole in One and set intermediate casing. Built the curve and drilled the lateral section with Whole in One (replaced conventional oil base mud) to 15,884’ with no problems. Case History #2 - Terryville Field, Haynesville Lateral, Lincoln Parish, LA The surface hole was drilled and casing set with no problems. The pits were mudded up with Whole in One and drilling resumed. Anhydrite was drilled at 5,276’ with no change in mud properties. Built the curve using Whole in One, drilled to 11,487’ and ran intermediate casing with no problems. Drilled to total depth at 15,404’ with Whole in One (replaced conventional oil base mud), ran production casing and cemented with no problems. Case History #3 - South Texas Eagle Ford Lateral The surface hole was drilled to a depth of 2,160’. Drilled to 7,536’ where the pits were mudded up with Whole in One. Drilled to 10,140’ and set intermediate casing with no problems. Started building the curve at 11,300’ and finished it at 12,945’. Drilled the extended reach lateral with Whole in One (replaced conventional oil base mud) to TD at 17,250’. Conclusion This new and revolutionary single sack water based system is now available. NFSI is excited, prepared, and anxiously awaiting to help meet your drilling fluid needs. For any additional information please contact: Joe Morris joe@newfluid.com 713-780-3600 www.newfluid.com Questions?