KARMJIT SINGH
CHAIRMAN CILT SINGAPORE
4 JULY 2014
1.
2.
Changi Airport East Industrial / Logistics Project
Project Jewel at Changi Airport
3.
Relocation of PSA Container Port to Pasir Panjang (Phase 1) and Tuas (Phase 2)
4.
5.
Development and Expansion of Seletar Airport & Aerospace
Park
New International Cruise Terminal
6.
E-Freight and IoT (Internet of Things)
7.
High Speed Rail between SIN-KUL
8.
Expansion of MRT Rail Network
9.
New Generation of Logistics / Warehouses
10.
Development of Modern Industrial Parks in Iskandar (South
Johore)
11.
Development of Industrial Parks in Bintan and Batam
Project description:
New airfreight terminals, cargo centre for forwarders, logistics park and mail control
Expected completion date: 2020 – 2022
Budget: SGD 1
Billion
Project Owner:
Changi Airport
Group
Capacity: 4.5 – 5.5 million tonnes
Project description:
World-class lifestyle destination for global travelers. The complex will offer aviation facilities, retail offerings and unique leisure attractions.
Expected completion date: 2018
Budget: SGD 1.47
Billion
Project Owner:
Changi Airport
Group
Capacity: 24 million passengers per annum
Project description:
PSA port to be relocated in two phases: (1) Pasir
Panjang Port and
(2) Tuas Port
Expected completion date:
2020
Budget: SGD 4.5
Billion
Operated by: PSA
Capacity:
Additional 15 new berths
3. Relocation of PSA to
Pasir Panjang (Phase 1) & Tuas
(Phase 2)
Project description:
Development of
Seletar Airport designed to support industrial and business aviation activities.
Expected completion date: End of 2014
Budget: SGD 60
Million
Project Owner: JTC
& EDB
Capacity: 30 aerospace companies & an
1,800 m runway
4. Development & Expansion of
Seletar Airport & Aerospace Park
Project description:
Development of the
Marina Bay Cruise
Terminal Singapore for international passenger traffic.
Completion date:
2012
Budget: SGD 450
Million
Operated by: SATS
Capacity: Able to berth two 3,000 pax cruise ships
5. New International Cruise
Terminal
Project description:
Using RFID to improve land/sea/freight information flow and productivity
Expected completion date:
2017
Project Owner:
CAAS & IDA
6. E-Freight & IoT (Internet of
Things)
Project description:
Using RFID to improve land/sea/freight information flow and productivity
Expected completion date:
2017
Project Owner:
CAAS & IDA
6. E-Freight & IoT (Internet of
Things)
Project description:
High Speed Rail
(HSR) between
Singapore and
Malaysia to improve SIN-KUL intercity connectivity
Expected completion date:
2024
Budget: SGD 15
Billion
Operated by: ?
7. High Speed Rail between SIN-
KUL
Project description:
Expansion and development of MRT rail network to serve extended areas and a greater number of commuters.
Expected completion date: 2025
Budget: SGD 60
Billion
Operated by: LTA
Capacity: Increase from 160 to 320 km of track
8. Expansion of MRT Rail Network
Project description:
Expansion and development of MRT rail network to serve extended areas and a greater number of commuters.
Expected completion date: 2025
Budget: SGD 60
Billion
Operated by: LTA
Capacity: Increase from 160 to 320 km of track
8. Expansion of MRT Rail Network
Project description:
Improve productivity and develop green buildings, green transport, green ports and green freight and logistics.
By 2020, the commitment is to have 16% reduction in emissions, 30% energy usage reduction, 20% green buildings and
11% increase in public transport usage.
Expected completion date: On-going
9. New Generation of Logistics /
Warehouses (Green Logistics)
Project description:
Improve productivity and develop green buildings, green transport, green ports and green freight and logistics.
By 2020, the commitment is to have 16% reduction in emissions, 30% energy usage reduction, 20% green buildings and
11% increase in public transport usage.
Expected completion date: On-going
9. New Generation of Logistics /
Warehouses (Green Logistics)
Project description:
Joint Malaysian and Singapore government collaboration
Expected completion date:
On-going
10. Development of Modern
Industrial Parks in Iskandar (South
Johore)
Project description:
Joint Malaysian and Singapore government collaboration
Expected completion date:
On-going
10. Development of Modern
Industrial Parks in Iskandar (South
Johore)
Project description:
Joint Malaysian and Singapore government collaboration
Expected completion date:
On-going
10. Development of Modern
Industrial Parks in Iskandar (South
Johore)
Project description:
Development of
Bintan Industrial
Estate and
Batamindo
Industrial Park for manufacturing companies.
Expected completion date:
On-going
11. Development of Industrial Parks in Bintan and Batam